Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

03/12/25 SCCRTC ZEPRT Informational Presentation #4 - P2 - Bridge Types, Estimated Costs and Next Steps


Listen Later

Part 2 is an intro to rail bridges and bridge engineering. There was no discussion of the details of the bridges in this project, and it only covered the range of bridge types that might be used.

The cost estimate and next steps are included at the end of this section. There is an episode devoted just to the latter two if you aren't interested in bridge engineering.

The project website is here:

https://www.sccrtc.org/projects/rail/zeprt/

There is a version of the video there.

The RTC's Youtube channel with the video is here:

https://www.youtube.com/watch?v=vCJdqxnU0jA

...more
View all episodesView all episodes
Download on the App Store

Santa Cruz County Transit and Transportation Agency Meetings - Audio TracksBy Keith Bontrager


More shows like Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

View all
The Daily by The New York Times

The Daily

111,864 Listeners