In today’s episode, we were joined by Mike Malguarnera, previously Director of Market & Transmission Analytics at BW Solar, for a fascinating conversation on why the grid is often far messier, riskier, and more nuanced than it looks from the outside.
With experience spanning utilities, cooperatives, power markets, FTRs, IRPs, interconnection, storage siting, and project development, Mike has seen how small assumptions can turn into very expensive mistakes. He brings a rare blend of market knowledge, transmission insight, and developer-side pragmatism.
We discuss:
Books discussed on the show:
https://a.co/d/0awPgkvF
https://a.co/d/0awPgkvF
Featured on the show:
https://www.linkedin.com/in/michael-malguarnera-p-e-a6705014/
https://www.linkedin.com/in/charlie-webb-a5605768/
By Charlie WebbIn today’s episode, we were joined by Mike Malguarnera, previously Director of Market & Transmission Analytics at BW Solar, for a fascinating conversation on why the grid is often far messier, riskier, and more nuanced than it looks from the outside.
With experience spanning utilities, cooperatives, power markets, FTRs, IRPs, interconnection, storage siting, and project development, Mike has seen how small assumptions can turn into very expensive mistakes. He brings a rare blend of market knowledge, transmission insight, and developer-side pragmatism.
We discuss:
Books discussed on the show:
https://a.co/d/0awPgkvF
https://a.co/d/0awPgkvF
Featured on the show:
https://www.linkedin.com/in/michael-malguarnera-p-e-a6705014/
https://www.linkedin.com/in/charlie-webb-a5605768/