Things that will shorten the life of your rechargeable tool batteries.
Remodeling advice - know the timeline and the order of operation.
Planning – know what you want, what are lead-times for materials
Budget – how much can you spend
Design – picking the design aspects and agreeing with your partner
Demo including lead-based paint testing (if your home is older than 1978) and remediation. Also asbestos testing which can be found in linoleum glue, drywall or insulation.
Plumbing rough in (tub or shower pan gets set at this time)- moving drain lines and supply lines to accommodate the new lay-out.
Electrical rough in – moving/adding lighting and switches
Inspections -need to be performed according to permitting department’s criteria and timeline.
Drywall – repair or install of new drywall, texturing and priming.
Painting – it is easiest to do the painting BEFORE anything is installed. Touch-up at the end.
Cabinets/counters for kitchens OR Tile for bathrooms
Plumbing trim out – faucets, sink drain, supply valves replaced.
Electrical trim out – light fixtures installed and switch plate and outlet covers
Finishing touches – towel bars, mirrors and other final, fancy touches
Final inspection
If you have any questions or want to share your story email us at
5
66 ratings
Things that will shorten the life of your rechargeable tool batteries.
Remodeling advice - know the timeline and the order of operation.
Planning – know what you want, what are lead-times for materials
Budget – how much can you spend
Design – picking the design aspects and agreeing with your partner
Demo including lead-based paint testing (if your home is older than 1978) and remediation. Also asbestos testing which can be found in linoleum glue, drywall or insulation.
Plumbing rough in (tub or shower pan gets set at this time)- moving drain lines and supply lines to accommodate the new lay-out.
Electrical rough in – moving/adding lighting and switches
Inspections -need to be performed according to permitting department’s criteria and timeline.
Drywall – repair or install of new drywall, texturing and priming.
Painting – it is easiest to do the painting BEFORE anything is installed. Touch-up at the end.
Cabinets/counters for kitchens OR Tile for bathrooms
Plumbing trim out – faucets, sink drain, supply valves replaced.
Electrical trim out – light fixtures installed and switch plate and outlet covers
Finishing touches – towel bars, mirrors and other final, fancy touches
Final inspection