Building Optimal

#78: A Simple, Profitable Change Order System


Listen Later

A messy or worse, non-existent, change order system can sink a home builder. What should be a source of profits is often a place of loss and chaos. We can fix that in a hurry, though. Here is my company’s strategy to change order the right way.

Have any topics you want me to discuss, guests to interview, or feedback about the show? DM me on Instagram @buildingoptimal or send me an email at [email protected].

 

Learn more about Lowe’s for Pros HERE

 

Sign up for the best newsletter on the planet HERE (sign-up top of home page) BTW, refer our newsletter to 3 other builders and get a copy of my client pre-construction guide. Refer 10 and get a 20-minute Q&A with me. Details of how in the newsletters, my friends.

...more
View all episodesView all episodes
Download on the App Store

Building OptimalBy Jared Gossett

  • 5
  • 5
  • 5
  • 5
  • 5

5

34 ratings