WoodSolutions Timber Talks

Asia’s Largest Timber Building – Post and Beam Case Study Part 2


Listen Later

Exposed timber post and beam structures leverage the benefits of biophilic design and wellbeing. From a design point of view there are a number of challenges that need to overcome. Nanyong Technological University Academic South Building is Asia’s last post, beam and CLT project. The 40,000 sq m project will cost $180 million and be completed in 2021. In part 2 of this 2 part series we’re speaking with Gary Caulfield, the project director and David Kingham, the project engineer about:

  • Logistics of the project and dealing with COVID-19, using an international supply chain
  • The cost curves of mass timber as a material selection going forward
  • Managing moisture during construction

Check out the WoodSolutions website, the world's biggest website on wood:

www.woodsolutions.com.au

The WS Technical Design Guide can be found here:

https://www.woodsolutions.com.au/articles/mid-rise-timber-buildings-design-guides

If you’ve got a mid-rise project that you want assistance with, you can get free advice from the WoodSolutions MAP Team. Just email me at [email protected] and we will get back to you.

...more
View all episodesView all episodes
Download on the App Store

WoodSolutions Timber TalksBy Adam Jones

  • 5
  • 5
  • 5
  • 5
  • 5

5

1 ratings