
Sign up to save your podcasts
Or


The estimated cost of the Tan Van-Nhon Trach section of the Ring Road No. 3 project, which will connect HCMC, Binh Duong, Dong Nai and Long An, has risen by over VND1.6 trillion after six years of delays.
By The Saigon TimesThe estimated cost of the Tan Van-Nhon Trach section of the Ring Road No. 3 project, which will connect HCMC, Binh Duong, Dong Nai and Long An, has risen by over VND1.6 trillion after six years of delays.