
Sign up to save your podcasts
Or
In our eighth episode, host Dave Finch discusses how to get from prototype to market, zeroing in on the process of DFM or, more accurately DFX, which stands for "Design for" ...well, anything that comes after the design.
Why does cost go up after a product's been released for a while? When should you consider certifcation in the design process? How can young engineers hope to familiarize themselves with DFM if they never even designed a full board in school?
Learn the many good reasons engineers should know their board manufacturers. Consider how EMS (electronic manufacturing services) companies have evolved from mere contractors into design partners.
And hear some truly unfortunate stories about what happens when you fail to plan beyond the circuit design stage appropriately.
4.9
2323 ratings
In our eighth episode, host Dave Finch discusses how to get from prototype to market, zeroing in on the process of DFM or, more accurately DFX, which stands for "Design for" ...well, anything that comes after the design.
Why does cost go up after a product's been released for a while? When should you consider certifcation in the design process? How can young engineers hope to familiarize themselves with DFM if they never even designed a full board in school?
Learn the many good reasons engineers should know their board manufacturers. Consider how EMS (electronic manufacturing services) companies have evolved from mere contractors into design partners.
And hear some truly unfortunate stories about what happens when you fail to plan beyond the circuit design stage appropriately.
30,845 Listeners
32,291 Listeners
228 Listeners
1,040 Listeners
501 Listeners
4,014 Listeners
1,795 Listeners
2,322 Listeners
7,913 Listeners
79 Listeners
4,144 Listeners
5,950 Listeners
428 Listeners
5,462 Listeners
461 Listeners