
Sign up to save your podcasts
Or
In our eighth episode, host Dave Finch discusses how to get from prototype to market, zeroing in on the process of DFM or, more accurately DFX, which stands for "Design for" ...well, anything that comes after the design.
Why does cost go up after a product's been released for a while? When should you consider certifcation in the design process? How can young engineers hope to familiarize themselves with DFM if they never even designed a full board in school?
Learn the many good reasons engineers should know their board manufacturers. Consider how EMS (electronic manufacturing services) companies have evolved from mere contractors into design partners.
And hear some truly unfortunate stories about what happens when you fail to plan beyond the circuit design stage appropriately.
4.9
2323 ratings
In our eighth episode, host Dave Finch discusses how to get from prototype to market, zeroing in on the process of DFM or, more accurately DFX, which stands for "Design for" ...well, anything that comes after the design.
Why does cost go up after a product's been released for a while? When should you consider certifcation in the design process? How can young engineers hope to familiarize themselves with DFM if they never even designed a full board in school?
Learn the many good reasons engineers should know their board manufacturers. Consider how EMS (electronic manufacturing services) companies have evolved from mere contractors into design partners.
And hear some truly unfortunate stories about what happens when you fail to plan beyond the circuit design stage appropriately.
4,226 Listeners
8,641 Listeners
30,962 Listeners
32,076 Listeners
1,012 Listeners
111,083 Listeners
55,867 Listeners
2,245 Listeners
9,518 Listeners
435 Listeners
8,759 Listeners
2,143 Listeners
258 Listeners
443 Listeners
445 Listeners