Takt Construction

Ep.23 - First & Last Planner Collaboration - Takt Production System® Series


Listen Later

In this podcast we cover:

  • The importance of the First Planner™ System.
  • How Last Planner® ties into Takt.

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

...more
View all episodesView all episodes
Download on the App Store

Takt ConstructionBy Jason Schroeder & Kevin Rice

  • 4.9
  • 4.9
  • 4.9
  • 4.9
  • 4.9

4.9

7 ratings


More shows like Takt Construction

View all
Elevate Construction by Jason Schroeder

Elevate Construction

141 Listeners