
Sign up to save your podcasts
Or


What if you could ship something real in seven days for almost any idea? This episode shows you how to take any product idea—no matter how big—and cut it down to a shippable thin slice using a five-step framework.
Build Something Smaller Cheatsheet (7-12 min PDF)
Scope scissors prompts, MVP definition rules, and a simple version 1 boundary line.
→ Download here
Recommended KitsScope Shrinker Kit ($39)
Cut your product to something shippable with must-have filters, risk weights, and a scope trim canvas.
→ Get the kit
MVP Map Kit ($59)
Map v1, v2, v3 thin slices with stories and sequencing logic for a buildable plan.
→ Get the kit
One metric: Did you ship something on day 7?
Not "Did you finish everything?" Not "Did you build it perfectly?"
Did you ship something—anything—that a real person could use?
If yes → You succeeded. Learn and iterate.
If no → Your scope was too big. Cut more. Try again.
Shipping a thin slice in seven days beats building the full product in seven months.
Name the core job. Cut everything else. Define "good enough." Break it into 7 milestones. Ship on day 7 no matter what.
Core job: "This product helps engineering teams capture bugs from Slack and track them without manual copy-paste."
Features cut: Assignments, priorities, GitHub integration, notifications, reports, search, filters
Features kept: Capture from Slack, track status (open/in-progress/closed), add comments
7-Day Build Plan:
Ship Something: The Unstuck Product Show helps founders turn stuck into shipped. Each week, we take one common product problem and turn it into a simple framework and a real action plan.
New episodes every Monday, Wednesday, and Friday.
Subscribe:
Episode produced: January 2026
Hosted on: RedCircle
By Sean HiltonWhat if you could ship something real in seven days for almost any idea? This episode shows you how to take any product idea—no matter how big—and cut it down to a shippable thin slice using a five-step framework.
Build Something Smaller Cheatsheet (7-12 min PDF)
Scope scissors prompts, MVP definition rules, and a simple version 1 boundary line.
→ Download here
Recommended KitsScope Shrinker Kit ($39)
Cut your product to something shippable with must-have filters, risk weights, and a scope trim canvas.
→ Get the kit
MVP Map Kit ($59)
Map v1, v2, v3 thin slices with stories and sequencing logic for a buildable plan.
→ Get the kit
One metric: Did you ship something on day 7?
Not "Did you finish everything?" Not "Did you build it perfectly?"
Did you ship something—anything—that a real person could use?
If yes → You succeeded. Learn and iterate.
If no → Your scope was too big. Cut more. Try again.
Shipping a thin slice in seven days beats building the full product in seven months.
Name the core job. Cut everything else. Define "good enough." Break it into 7 milestones. Ship on day 7 no matter what.
Core job: "This product helps engineering teams capture bugs from Slack and track them without manual copy-paste."
Features cut: Assignments, priorities, GitHub integration, notifications, reports, search, filters
Features kept: Capture from Slack, track status (open/in-progress/closed), add comments
7-Day Build Plan:
Ship Something: The Unstuck Product Show helps founders turn stuck into shipped. Each week, we take one common product problem and turn it into a simple framework and a real action plan.
New episodes every Monday, Wednesday, and Friday.
Subscribe:
Episode produced: January 2026
Hosted on: RedCircle