Synergy Practices Dental Podcast

Episode 55: Red Card Ep. 47 Addendum vs Change Order


Listen Later

In this week’s episode of the Red Card segment, Sasha dives into design-build in the world of construction.  From design-build best practices, tips on how to control your design budget, whether to have one, and how to go about it and get exactly what you want.  Sasha also tackles those worse case scenarios, what the difference is between an addendum vs a change order, and even what to do with those “unknown fees”.  This is just what you need for your holiday listening while you’re shopping. Check it out!

...more
View all episodesView all episodes
Download on the App Store

Synergy Practices Dental PodcastBy Arminco Inc

  • 4.4
  • 4.4
  • 4.4
  • 4.4
  • 4.4

4.4

7 ratings