Rig Recon Live

Fire Truck Refurbs with Bulldog Fire Apparatus


Listen Later

On Rig Recon Live, hosts Bruce Quick and Jason Witmier talk with Jason Davis of Bulldog about fire apparatus refurbishments and how “refurb” can range from repainting and reconfiguring compartments to new chassis, rebuilt engines/transmissions, aerial teardown/inspection, and even replacing frame rails. Davis explains Bulldog’s process involving sales, in-house engineering, fabrication, and paint, noting that refurbs often reveal hidden issues like corrosion only found after disassembly, requiring clear upfront communication. They discuss re-chassis projects, typically using Spartan, with raw chassis lead times around six months to a year, plus complications from modern emissions packaging and multiplex electrical systems that may not interface with older body controls. Savings versus new can be roughly 20–40% depending on scope, and they close with top considerations: budget, trusted vendor capability, and timeline.

Chapter Markers:
00:00 Refurb Demand Rising
01:30 Rig Recon Live Intro
01:54 Meet Jason Davis
03:20 What Refurb Really Means
05:33 Common Refurb Types
07:03 Rechassis Process
07:59 Hidden Surprises Found
09:43 Chassis Lead Times
10:43 Cost Versus New Rig
13:38 Codes Emissions Wiring
17:58 Paint Matching Pitfalls
20:21 Fabrication Capabilities
23:35 Facilities Storage Workflow
25:31 Misconceptions Frame Rails
28:47 Top Three Takeaways
32:34 Final Thoughts Wrap Up

More - https://rigrecon.com/podcast/

Send us Fan Mail

...more
View all episodesView all episodes
Download on the App Store

Rig Recon LiveBy Elkhart Brass, FRC, FoamPro, ROM