
Sign up to save your podcasts
Or


Force Tech Talk Episode 19: The Continuity Principle
The Five Elements of Continuity Principle define how aerospace and defence manufacturers sustain product lifecycles spanning 25+ years when component production runs last only months.
In this episode of our Tech Talks, Karen Salmon, CEO of Force Technologies, outlines the five critical elements that prevent customers from being caught out by unexpected component obsolescence:
Karen draws on 40 years of Force Technologies experience, including a real case study: recovering a failed RGM 3182 chip assembly by locating the original Chinese engineer who revealed a critical 1mm die orientation detail that was never documented in the original design paperwork.
This episode directly addresses the core challenge facing aerospace and defence procurement: how to support 25-year product lifecycles when no single manufacturer controls component availability for that duration.
Listne to the full conversation as Charlotte and Karen discuss why "last-minute.com" approaches fail, how to plan for supply chain disruption, and what the ROM 2026 conference will reveal about continuity planning in defence procurement.
By Force Technologies LtdForce Tech Talk Episode 19: The Continuity Principle
The Five Elements of Continuity Principle define how aerospace and defence manufacturers sustain product lifecycles spanning 25+ years when component production runs last only months.
In this episode of our Tech Talks, Karen Salmon, CEO of Force Technologies, outlines the five critical elements that prevent customers from being caught out by unexpected component obsolescence:
Karen draws on 40 years of Force Technologies experience, including a real case study: recovering a failed RGM 3182 chip assembly by locating the original Chinese engineer who revealed a critical 1mm die orientation detail that was never documented in the original design paperwork.
This episode directly addresses the core challenge facing aerospace and defence procurement: how to support 25-year product lifecycles when no single manufacturer controls component availability for that duration.
Listne to the full conversation as Charlotte and Karen discuss why "last-minute.com" approaches fail, how to plan for supply chain disruption, and what the ROM 2026 conference will reveal about continuity planning in defence procurement.