Build Big Ideas

How to Build a Pontoon Bridge During the Iraq War - Ep16


Listen Later

Jason talks about his experience leading the construction of a 350-meter-long pontoon bridge across the Tigris River in Iraq near Tikrit during the Iraq war. 

For photos and a full description of the project, please see https://www.buildbigideas.com/post/how-to-build-a-pontoon-bridge-during-the-iraq-war-ep16 

In late September 2003, while in support of Operation Iraqi Freedom, the 555th Combat Engineer Group (TF ABLE) received the mission to construct a bypass around the damaged Tikrit fixed bridge crossing the Tigris River. This bypass would enable the 4th Infantry Division’s maneuver units east-west mobility across the Tigris River.  The crux of the bypass was the actual crossing of the Tigris.  The solution was constructing a 350m bridge, the largest Mabey & Johnson float bridge ever built – capable of trafficking MLC 110 military vehicles.

During the 3 weeks of planning and 2.5 months of construction, the 14th Engineer Battalion met with a variety of challenges that forced them to exhibit engineering problem solving skills, developing innovative solutions to complex problems.

...more
View all episodesView all episodes
Download on the App Store

Build Big IdeasBy Jason Toth & Scott Snelling

  • 5
  • 5
  • 5
  • 5
  • 5

5

8 ratings