
Sign up to save your podcasts
Or


The cost and time to build a new power plant has increased dramatically. Essential equipment lead times are long, and technical labor is scarce. In this episode of Power Plays, Gavin McCollam with Basin Electric shares how his North Dakota G&T cooperative is addressing reliability, meeting project timelines and building new generation for the next generation.
By CoBank5
88 ratings
The cost and time to build a new power plant has increased dramatically. Essential equipment lead times are long, and technical labor is scarce. In this episode of Power Plays, Gavin McCollam with Basin Electric shares how his North Dakota G&T cooperative is addressing reliability, meeting project timelines and building new generation for the next generation.

43,734 Listeners

41,127 Listeners

1,243 Listeners

7,124 Listeners

112,858 Listeners

56,917 Listeners

50 Listeners

6,082 Listeners

12 Listeners

45,750 Listeners

10,073 Listeners

35 Listeners

4 Listeners

473 Listeners