
Sign up to save your podcasts
Or


The cost and time to build a new power plant has increased dramatically. Essential equipment lead times are long, and technical labor is scarce. In this episode of Power Plays, Gavin McCollam with Basin Electric shares how his North Dakota G&T cooperative is addressing reliability, meeting project timelines and building new generation for the next generation.
By CoBank5
88 ratings
The cost and time to build a new power plant has increased dramatically. Essential equipment lead times are long, and technical labor is scarce. In this episode of Power Plays, Gavin McCollam with Basin Electric shares how his North Dakota G&T cooperative is addressing reliability, meeting project timelines and building new generation for the next generation.

43,568 Listeners

41,174 Listeners

1,254 Listeners

7,113 Listeners

112,593 Listeners

56,575 Listeners

48 Listeners

6,079 Listeners

7 Listeners

45,393 Listeners

9,909 Listeners

34 Listeners

4 Listeners

474 Listeners