
Sign up to save your podcasts
Or


The cost and time to build a new power plant has increased dramatically. Essential equipment lead times are long, and technical labor is scarce. In this episode of Power Plays, Gavin McCollam with Basin Electric shares how his North Dakota G&T cooperative is addressing reliability, meeting project timelines and building new generation for the next generation.
By CoBank5
88 ratings
The cost and time to build a new power plant has increased dramatically. Essential equipment lead times are long, and technical labor is scarce. In this episode of Power Plays, Gavin McCollam with Basin Electric shares how his North Dakota G&T cooperative is addressing reliability, meeting project timelines and building new generation for the next generation.

8,749 Listeners

3,217 Listeners

387 Listeners

1,254 Listeners

112,342 Listeners

56,406 Listeners

44 Listeners

808 Listeners

29,206 Listeners

614 Listeners

4 Listeners

308 Listeners

114 Listeners

6 Listeners

9 Listeners