Date:9/08/2008 Length: 00:16:35 Size: 7.59MB Thought Leader: Stephen Byrn, Ph. D., Charles B. Jordan Professor of Medicinal Chemistry and Head of the Department of Industrial and Physical Pharmacy, Purdue University; and Head of the Aptuit Scientific Advisory Board In this episode, Dr. Byrn speaks about the critical path problem in drug development and how a designed molecular delivery system can improve the drug development process. Play Podcast Download free related whitepaper For more information on how you can be featured in a podcast, contact Dan Limbach at
[email protected] or call him at (847) 594-0157.