For more:
https://news.cgtn.com/news/2025-06-08/New-central-processing-platform-for-Bohai-offshore-oilfield-installed-1E2DlmFu3aE/p.html
The China National Offshore Oil Corporation announced the successful float-over installation of the central processing platform for Phase I of the Kenli 10-2 oilfield in Bohai Bay, a billion-ton-grade project that set regional records for platform size and weight. The eight-legged, three-tiered platform stands 22.8 meters tall and covers an area equal to 15 basketball courts, making it the largest ever installed in the region. Due to its size, engineers used a float-over method, leveraging tidal forces to position it onto jacket legs.
Subscribe to us on YouTube: https://goo.gl/lP12gA
Download our APP on Apple Store (iOS): https://itunes.apple.com/us/app/cctvnews-app/id922456579?l=zh&ls=1&mt=8
Download our APP on Google Play (Android): https://play.google.com/store/apps/details?id=com.imib.cctv
--
Support podtube.me continuity as a free service. Become a Patreon or make an one-time donation
--
Video at Youtube: https://www.youtube.com/watch?v=fLgdFAcMqQU