Port of San Diego: Port Matters

Port of San Diego's Pavilion on Broadway Pier Opens

12.16.2010 - By Port of San DiegoPlay

Download our free app to listen on your phone

Download on the App StoreGet it on Google Play

The Port of San Diego's new Pavilion on Broadway Pier, which will serve as both a public event center and cruise ship terminal, is celebrating its grand opening on December 18, 2010. The modern, two-story facility will be the Port of San Diego's first "green" building. Its state-of-the art design is expected to win silver LEED certification after undergoing several months of review by the U.S. Green Building Council. ; The $28-million Port Pavilion on Broadway Pier was designed and built to reduce water and energy usage. In addition, cruise ships that will berth at the pavilion and the Port's main cruise terminal on the B Street Pier will use shore-side electrical power. Learn more: http://j.mp/eID61c

More episodes from Port of San Diego: Port Matters