Saigon Times Podcasts

Rach Mieu 2 Bridge project faces cost overruns


Listen Later

The total cost of Rach Mieu 2 Bridge, which connects the Mekong Delta provinces of Tien Giang and Ben Tre, is expected to increase by VND1.6 trillion to VND6.81 trillion due to higher site clearance costs.

...more
View all episodesView all episodes
Download on the App Store

Saigon Times PodcastsBy The Saigon Times