Co-op Energy Talk

S9E17 - Paving the Way to Restart the Palisades Nuclear Power Plant


Listen Later

In September, we announced that our power supplier, Wolverine Power Cooperative, signed a power purchase agreement that will pave the way for the restart of the Palisades Nuclear Power Plant. This marks the first time that a shutdown power plant would be restarted. There's a lot that goes into how that happens, what's next, and why this agreement is so impactful and beneficial to Cherryland members. On this episode of Co-op Energy Talk, we sit down with Cherryland CEO Rachel Johnson and Wolverine President and CEO Eric Baker to learn more.

...more
View all episodesView all episodes
Download on the App Store

Co-op Energy TalkBy Cherryland Electric Cooperative

  • 4.2
  • 4.2
  • 4.2
  • 4.2
  • 4.2

4.2

5 ratings