UMass IPM Fruit Loop

Short, sweet and behind schedule; UMass IPM Fruit Loop Vol. 29 Episode 12


Listen Later

Oh, hey there, long time no... erm... listen.

This episode is heavy on the way Jon sees things with a healthy serving of entomology. Tune in and harken back to June 25th or so.


Music credits:

Intro/Outro: Strobotone - San Fran Interlude (Edit) 

Strobotone is licensed under a Attribution-NonCommercial-NoDerivatives 2.0 Germany License.

Entomology Psychology: Checkie Brown - Wirklich Wichtig (ID 211)Wirklich Wichtig (ID 211) by Checkie Brown is licensed under a Attribution-NonCommercial-NoDerivatives 4.0 International License.

Diseases intro:Hippie Bulle - StonedFunghi(ID213)by CheckieBrown Attribution-NonCommercial-NoDerivatives 4.0 International License.

...more
View all episodesView all episodes
Download on the App Store

UMass IPM Fruit LoopBy Hawkeye

  • 3
  • 3
  • 3
  • 3
  • 3

3

2 ratings