
Sign up to save your podcasts
Or
Although the contractors had shipped excellent spacecrafts, preparations at Kennedy did not go quickly from the assembly building to the launch pad. Testing was delayed several days in order to stay out of the way of Apollo 9 pre-flight activities. Also during maintenance to the Launch Control Center, the electrical power was switched off to replace a valve. The Apollo 10 launch vehicle’s pneumatic controls sensed the power outage, opened some valves and dumped 20,000 liters of fuel on the launch pad.
4.9
127127 ratings
Although the contractors had shipped excellent spacecrafts, preparations at Kennedy did not go quickly from the assembly building to the launch pad. Testing was delayed several days in order to stay out of the way of Apollo 9 pre-flight activities. Also during maintenance to the Launch Control Center, the electrical power was switched off to replace a valve. The Apollo 10 launch vehicle’s pneumatic controls sensed the power outage, opened some valves and dumped 20,000 liters of fuel on the launch pad.
1,983 Listeners
2,867 Listeners
636 Listeners
13,424 Listeners
9,272 Listeners
320 Listeners
284 Listeners
1,235 Listeners
392 Listeners
2,653 Listeners
3,289 Listeners
983 Listeners
398 Listeners
2,310 Listeners