Although the contractors had shipped excellent spacecrafts, preparations at Kennedy did not go quickly from the assembly building to the launch pad. Testing was delayed several days in order to stay out of the way of Apollo 9 pre-flight activities. Also during maintenance to the Launch Control Center, the electrical power was switched off to replace a valve. The Apollo 10 launch vehicle’s pneumatic controls sensed the power outage, opened some valves and dumped 20,000 liters of fuel on the launch pad.
By Michael Annis4.9
129129 ratings
Although the contractors had shipped excellent spacecrafts, preparations at Kennedy did not go quickly from the assembly building to the launch pad. Testing was delayed several days in order to stay out of the way of Apollo 9 pre-flight activities. Also during maintenance to the Launch Control Center, the electrical power was switched off to replace a valve. The Apollo 10 launch vehicle’s pneumatic controls sensed the power outage, opened some valves and dumped 20,000 liters of fuel on the launch pad.

78,321 Listeners

16,585 Listeners

630 Listeners

1,356 Listeners

313 Listeners

563 Listeners

228 Listeners

6,070 Listeners

1,287 Listeners