Chatz: A Television Podcast

Studio 60 on the Sunset Strip 05 "The Long Lead Story" & 06 "The Wrap Party" | SunsetChatz 03


Listen Later

Studio 60 on the Sunset Strip is the greatest television program of all time. (This is a skit, sorry, sketch, sorry, lie).

Six Dettmar joins us this season from Scanline Media!

Music used in this episode includes "Klepotonic Swing" by Tri-Tachyon.

Patreon

Twitter

Reddit

Email: [email protected]

Our main podcast feed art was done by Camilla Franklin, whose work can be found at https://camillafranklin.myportfolio.com/ 

Magellan's newsletter

Bluesky

Twitch

Chatzums

Email: [email protected]

Our main podcast feed art was done by Camilla Franklin, whose work can be found at https://camillafranklin.myportfolio.com/

...more
View all episodesView all episodes
Download on the App Store

Chatz: A Television PodcastBy Magellan and Allen

  • 4.7
  • 4.7
  • 4.7
  • 4.7
  • 4.7

4.7

30 ratings