
Sign up to save your podcasts
Or
New Brunswick Power and through them the rate payers of the province of New Brunswick are out at minimum $13 million spent on an obviously non-viable technology. Their due diligence failed. This is a podcast version of the article of the same name on the TFIE Medium publication.
5
33 ratings
New Brunswick Power and through them the rate payers of the province of New Brunswick are out at minimum $13 million spent on an obviously non-viable technology. Their due diligence failed. This is a podcast version of the article of the same name on the TFIE Medium publication.