
Sign up to save your podcasts
Or


The largest grid operator in the U.S., PJM, has more than 3,000 active projects in its interconnection queue, more than four other ISOs combined. And it used to be easy to build in Texas, but ERCOT is facing the same challenges as other regions. Spearmint Energy’s Andrew Waranch and Gina Wolf examine the nuances of building ISO supply in this episode of Power Plays.
By CoBank5
88 ratings
The largest grid operator in the U.S., PJM, has more than 3,000 active projects in its interconnection queue, more than four other ISOs combined. And it used to be easy to build in Texas, but ERCOT is facing the same challenges as other regions. Spearmint Energy’s Andrew Waranch and Gina Wolf examine the nuances of building ISO supply in this episode of Power Plays.

8,743 Listeners

3,215 Listeners

388 Listeners

1,254 Listeners

112,327 Listeners

56,375 Listeners

44 Listeners

805 Listeners

29,180 Listeners

613 Listeners

4 Listeners

308 Listeners

114 Listeners

6 Listeners

9 Listeners