The largest grid operator in the U.S., PJM, has more than 3,000 active projects in its interconnection queue, more than four other ISOs combined. And it used to be easy to build in Texas, but ERCOT is facing the same challenges as other regions. Spearmint Energy’s Andrew Waranch and Gina Wolf examine the nuances of building ISO supply in this episode of Power Plays.
By CoBank5
88 ratings
The largest grid operator in the U.S., PJM, has more than 3,000 active projects in its interconnection queue, more than four other ISOs combined. And it used to be easy to build in Texas, but ERCOT is facing the same challenges as other regions. Spearmint Energy’s Andrew Waranch and Gina Wolf examine the nuances of building ISO supply in this episode of Power Plays.