Vegas TMI Podcast

VegasTMI - Podcast - Episode19 - Project Enchilada

02.05.2019 - By City of Las VegasPlay

Download our free app to listen on your phone

Download on the App StoreGet it on Google Play

Welcome to episode 19 of VegasTMI- the official city of Las Vegas podcast. In this episode we talk about an exciting downtown enhancement project called Project Enchilada.

City of Las Vegas Communications Director David Riggleman sits down with Executive Director of Community Development Tom Perrigo and City Attorney Brad Jerbic to talk about the project that will bring green, open space, illumination and overall stabilization to East Fremont Street from Las Vegas Boulevard to 14th Street.

PROJECT ENCHILADA TIMELINE:*

NEON Illumination – May 2018-July 2019*

• Surrounding business outreach

• Stabilization of East Fremont Street from Las Vegas Boulevard to 14th Street

• Intense landscaping upgrades

• Address vacant lots

• Restoration and illumination of the existing building facades

• Restoration of power in the area

• Illumination of building – exterior & interior

• Illumination and reinvention of the alleyways

• NEON sign restoration and illumination

*Dates are approximate

For more information on Project Enchilada: https://files.lasvegasnevada.gov/eud/Project-Enchilada.pdf

Find us on social media @cityoflasvegas and #VegasTMI to give us feed back and high-fives.

Find David, Shane & Melissa on Twitter:

@TDavidRigg1958

@Savanapridi

@VegasMelD

This podcast will publish twice a month - more or less.

www.lasvegasnevada.gov/podcast

More episodes from Vegas TMI Podcast