
Sign up to save your podcasts
Or


Vicinity Energy, a Boston-based district energy provider, has started demolition of a natural gas boiler at its Kendall Square facility in neighboring Cambridge, Massachusetts, in preparation for the installation of a 35MW (9,952TR) ammonia (R717)-based steam heat pump.
Read the full story on NaturalRefrigerants.com.
By ATMOsphereVicinity Energy, a Boston-based district energy provider, has started demolition of a natural gas boiler at its Kendall Square facility in neighboring Cambridge, Massachusetts, in preparation for the installation of a 35MW (9,952TR) ammonia (R717)-based steam heat pump.
Read the full story on NaturalRefrigerants.com.