Recorded live at Advancing Prefabrication 2026 in Dallas, Tim walks the expo floor with James Haas, who leads modular and prefab efforts at Nichiha. (At the time of recording, Tim was also wearing a Nichiha hat. He's since moved on to a new adventure.)
The conversation everyone's having at Advancing Prefab this year? Data centers. But not the windowless boxes of yesteryear, municipalities are now mandating warmer, more inviting exteriors, and grid entropy is forcing data centers closer to urban cores where looks actually matter. That's a facade opportunity hiding in plain sight.
James pulls back the curtain on Nichiha's new AIA-certified CEU course tackling the industry's oldest bugaboo: mate line and plate line transitions. The unlock is a deceptively simple two-piece trim - base plate installed in the factory, face plate popped on after modules are stacked and stitched - letting manufacturers ship facades 85–90% complete instead of leaving whole panel runs off for field weaving. Proof points range from 7 Brew coffee shops delivered with 100% of the facade installed to major healthcare expansions hitting 80–90% factory completion.
CATCH THE LATEST IN MEP PREFAB Advancing Electrical Prefabrication: Dallas, July 22–24, 2026 Listeners get 10% off with code BPMP63295 https://advancing-electrical-prefabrication.com/
Also in this episode:
Thanks to our sponsors ProjectFluent and Advancing Prefabrication (Hanson Wade) for making this episode free for listeners. Connect with James Haas on LinkedIn https://www.linkedin.com/in/james-haas-0a4832b0/ to learn more about Nichiha's prefab facade solutions.
By Tim Seims and Carolina Baffigo5
2727 ratings
Recorded live at Advancing Prefabrication 2026 in Dallas, Tim walks the expo floor with James Haas, who leads modular and prefab efforts at Nichiha. (At the time of recording, Tim was also wearing a Nichiha hat. He's since moved on to a new adventure.)
The conversation everyone's having at Advancing Prefab this year? Data centers. But not the windowless boxes of yesteryear, municipalities are now mandating warmer, more inviting exteriors, and grid entropy is forcing data centers closer to urban cores where looks actually matter. That's a facade opportunity hiding in plain sight.
James pulls back the curtain on Nichiha's new AIA-certified CEU course tackling the industry's oldest bugaboo: mate line and plate line transitions. The unlock is a deceptively simple two-piece trim - base plate installed in the factory, face plate popped on after modules are stacked and stitched - letting manufacturers ship facades 85–90% complete instead of leaving whole panel runs off for field weaving. Proof points range from 7 Brew coffee shops delivered with 100% of the facade installed to major healthcare expansions hitting 80–90% factory completion.
CATCH THE LATEST IN MEP PREFAB Advancing Electrical Prefabrication: Dallas, July 22–24, 2026 Listeners get 10% off with code BPMP63295 https://advancing-electrical-prefabrication.com/
Also in this episode:
Thanks to our sponsors ProjectFluent and Advancing Prefabrication (Hanson Wade) for making this episode free for listeners. Connect with James Haas on LinkedIn https://www.linkedin.com/in/james-haas-0a4832b0/ to learn more about Nichiha's prefab facade solutions.