Why are concrete developers exploring steel modular construction? In this episode of Built Different, we examine why developers who typically build Type I concrete—post-tensioned slabs, podium-and-stick—are looking at steel modular as a middle path between wood-frame and concrete construction.
Topics covered:
• Speed advantage: 12-16 month delivery vs. 24-30 months for concrete
• Fire rating and acoustic (STC) parity with concrete construction
• Labor predictability: Factory vs. field workforce challenges
• Cost positioning: Steel modular between wood-frame and concrete on the cost curve
• Target markets: Mid-rise urban infill, workforce housing, institutional assets
• Earlier revenue, lower carry costs, and faster capital recycling
For developers frustrated with concrete construction timelines and costs but needing performance beyond wood-frame, steel modular offers a compelling alternative. This episode breaks down where it makes sense.