Medizin - Open Access LMU - Teil 13/22

Wnt/beta-catenin/Tcf signaling: A critical pathway in gastrointestinal tumorigenesis


Listen Later

Cancers of the gastrointestinal tract, including the liver, bile ducts, and pancreas, constitute the largest group of malignant tumors. Colorectal cancer is one of the most common neoplastic diseases in Western countries and one of the leading causes of cancer-related deaths. Inactivation of the adenomatous polyposis coli (APC) tumor-suppressor gene during early adenoma formation is thought to be the first genetic event in the process of colorectal carcinogenesis followed by mutations in oncogenes like K-Ras and tumor-suppressor genes like p53. Identification of the interaction of APC with the proto-oncogene beta-catenin has linked colorectal carcinogenesis to the Wnt-signal transduction pathway. The main function of APC is thought to be the regulation of free beta-catenin in concert with the glycogen synthase kinase 3beta (GSK-3beta) and Axin proteins. Loss of APC function, inactivation of Axin or activating beta-catenin mutations result in the cellular accumulation of beta-catenin. Upon translocation to the nucleus beta-catenin serves as an activator of T-cell factor (Tcf)-dependent transcription leading to an increased expression of several specific target genes including c-Myc, cyclin D1, MMP-7, and ITF-2. While APC mutations are almost exclusively found in colorectal cancers, deregulation of Wnt/beta-catenin/Tcf signaling is also common in other gastrointestinal and extra-gastrointestinal human cancers. In a fraction of hepatocellular carcinomas the Writ pathway is deregulated by inactivation of Axin or stabilizing mutations of beta-catenin. The majority of hepatoblastomas and a group of gastric cancers also carry beta-catenin mutations. Clearly, this pathway harbors great potential for future applications in cancer diagnostics, staging, and therapy. Copyright (C) 2002 S. Karger AG, Basel.
...more
View all episodesView all episodes
Download on the App Store

Medizin - Open Access LMU - Teil 13/22By Ludwig-Maximilians-Universität München


More shows like Medizin - Open Access LMU - Teil 13/22

View all
Tonspur Forschung by Annik Rubens

Tonspur Forschung

3 Listeners

Theoretical Physics Schools (ASC) by The Arnold Sommerfeld Center for Theoretical Physics (ASC)

Theoretical Physics Schools (ASC)

2 Listeners

Physik - Open Access LMU - Teil 01/02 by Ludwig-Maximilians-Universität München

Physik - Open Access LMU - Teil 01/02

1 Listeners

MCMP – Mathematical Philosophy (Archive 2011/12) by MCMP Team

MCMP – Mathematical Philosophy (Archive 2011/12)

6 Listeners

Hegel lectures by Robert Brandom, LMU Munich by Robert Brandom, Axel Hutter

Hegel lectures by Robert Brandom, LMU Munich

6 Listeners

MCMP – Philosophy of Science by MCMP Team

MCMP – Philosophy of Science

1 Listeners

MCMP – Epistemology by MCMP Team

MCMP – Epistemology

0 Listeners

Epistemology and Philosophy of Science: Prof. Dr. Stephan Hartmann – HD by Ludwig-Maximilians-Universität München

Epistemology and Philosophy of Science: Prof. Dr. Stephan Hartmann – HD

1 Listeners

Sommerfeld Lecture Series (ASC) by The Arnold Sommerfeld Center for Theoretical Physics (ASC)

Sommerfeld Lecture Series (ASC)

0 Listeners

Medizin - Open Access LMU - Teil 14/22 by Ludwig-Maximilians-Universität München

Medizin - Open Access LMU - Teil 14/22

0 Listeners