Using the power of mom’s purse, BCE negotiated an excess line trip to Puslinch, Ontario, Canada (registered in Guelph as an authentic site of witchcraft) to judge the basic installation of WiFi connected electrical connections, of which Marian Warner was correct - the wire was not cut. Both client and Bell Canada technicians were in the midst of broadcasting the event. A professional with Hydro One experience in olde Ontario will have to assume control of this private land corridor project. Stay away!