
Sign up to save your podcasts
Or


Fellow Aussie Toby Robb joins Dave to discuss everything related to mains power generation and transmission and his role as a linesman.
Ask Toby a question here:
Links:
TransGrid’s substation design standard https://www.transgrid.com.au/media/zgogqoqg/1-1-substation-primary-design-standard-rev-2.pdf
https://www.energy.nsw.gov.au/sites/default/files/2022-08/2019_10_NSW_ServiceAndInstallationRulesOfNSW_underlined.pdf
By The Amp Hour (Chris Gammell and David L Jones)4.9
226226 ratings
Fellow Aussie Toby Robb joins Dave to discuss everything related to mains power generation and transmission and his role as a linesman.
Ask Toby a question here:
Links:
TransGrid’s substation design standard https://www.transgrid.com.au/media/zgogqoqg/1-1-substation-primary-design-standard-rev-2.pdf
https://www.energy.nsw.gov.au/sites/default/files/2022-08/2019_10_NSW_ServiceAndInstallationRulesOfNSW_underlined.pdf

288 Listeners

3,059 Listeners

2,011 Listeners

626 Listeners

583 Listeners

1,531 Listeners

651 Listeners

189 Listeners

317 Listeners

8,077 Listeners

83 Listeners

212 Listeners

64 Listeners

101 Listeners

270 Listeners