Learnings and Missteps by Depth Builder

Calabo - Session #6 The Last Planner System


Listen Later

Jesse & Felipe are rounding 3rd base as they cover Chapter 6 of The Lean Builder. Catch a heavy dose of collaboration cheat codes with a side of attitude from Jesse the grouch. This conversation touches many of the necessities for achieving positive outcomes with LPS, some of which will take practice to master. And many you can apply today.

Connect with us at: https://www.learningsandmissteps.com/

Connect with Felipe at: https://www.theebfcshow.com/

...more
View all episodesView all episodes
Download on the App Store

Learnings and Missteps by Depth BuilderBy Jesse

  • 5
  • 5
  • 5
  • 5
  • 5

5

19 ratings


More shows like Learnings and Missteps by Depth Builder

View all
The EBFC Show by Felipe Engineer Manriquez

The EBFC Show

26 Listeners

Hoots on the Ground | The Lean Builder by The Lean Builder

Hoots on the Ground | The Lean Builder

10 Listeners