CCNS Update

CCNS Update

Download on the App Store

CCNS Update episodes

  • NGOs Apply for Appropriations Funding to Protect Communities from LANL’s Migrating Hexavalent Chromium Plume

    On November 18th, 2025, the New Mexico Environment Department withdrew its

    temporary authorization to the U.S. Department of Energy and ordered it to cease the

    injection of “treated” groundwater back into the regional sole source drinking water

    aquifer. Elevated levels of hexavalent chromium above regulatory standards had been

    detected for the first time in the deep regional drinking water aquifer beneath Pueblo de

    San Ildefonso. It had migrated through the complex geology of the Pajarito Plateau,

    where Los Alamos National Laboratory (LANL) is located, to deep groundwater below

    the Pueblo’s lands. The discovery was made during the drilling of a new monitoring well,

    known as SIMR-3, or San Ildefonso Mortandad Regional – 3, located just south of the

    boundary between LANL and the Pueblo.

    5 min
  • Public Comment Period for Project Jupiter’s Proposed Microgrid Air Quality Construction Permits Must be Extended

    After a careful review of the inconsistent public notices for the proposed Doña

    Ana County East and West Microgrids Air Quality Construction Permits for Project

    Jupiter, CCNS found them to be defective. The discrepancies require a restart of the

    public comment periods for the proposed $165 billion microgrid facilities that will emit up

    to 13 million tons of greenhouse gas emissions annually – more than yearly emissions

    generated by Las Cruces, Albuquerque and Santa Fe. Currently, public comments are

    due on Monday, March 2, 2026 to the New Mexico Environment Department.

    5 min
  • NMED Holds LANL Accountable for Hexavalent Chromium Plume

    Today’s Update is continuation of our reporting on the diligent and thorough work

    done by the New Mexico Environment Department to hold Los Alamos National

    Laboratory (LANL) accountable for not responsibly addressing the hexavalent chromium

    plume beneath LANL that has now spread beneath Pueblo de San Ildefonso.

    5 min
  • NMED Takes Necessary Action on LANL’s Hexavalent Chromium Plume

    On Tuesday, February 11 th , the New Mexico Environment Department took bold

    actions to hold the Department of Energy (DOE) and Los Alamos National Laboratory

    (LANL) accountable for the release and distribution of hexavalent chromium

    contamination into the regional drinking water aquifer and onto Pueblo de San Ildefonso

    lands. The Environment Department released two administrative compliance orders,

    both with civil penalties, totaling over $15,775,000.00.

    5 min
  • Stop House Bill 207 – Keep Oil and Gas Waste Out of New Mexico Waters

    Last week, Governor Michelle Lujan Grisham issued a legislative message for

    House Bill 207, which calls for the discharge of “produced water” to New Mexico’s

    rivers, streams and groundwater. Produced water is a highly toxic waste byproduct of

    oil and gas operations. No treatment technologies currently exist that might allow for the

    safe discharge of produced water to water resources.

    5 min
  • URGENT! Contact U.S. Republican Senators to Ask Trump to Save the New START Treaty

    We have just a few days to ensure the last remaining arms control treaty

    between the United States and Russia continues with its numerical cap of 1,550

    deployed strategic nuclear weapons for each country. The New START treaty is set to

    expire after Wednesday, February 4 th . Please contact Republican U.S. Senators.

    Request that President Trump respond to President Putin’s proposal to informally

    extend the treaty for one year.

    5 min

About CCNS Update

From the publisher's feed

A Weekly overview of Nuclear Safety issues.