Why can’t you debug hardware over Zoom? In this episode, we dive into the reality of hardware manufacturing and why pristine 3D CAD models can create a false sense of security.
We explored why having "boots on the ground", a local NPI manager or engineer, is essential for bridging the gap between design intent and factory floor reality.
We break down how time zone gaps turn quick questions into 2-week delays, why physical prototypes (EVT, DVT, PVT) reveal critical material flex, and how to prevent costly silent assumptions on the line.
Topics covered in this episode:
1. The Time Zone Trap and avoiding communication delays
2. CAD vs. Workbench: Why physical evidence beats software models
3. Managing 10+ sub-suppliers and navigating factory assumptions
4. Practical fixes: Documentation, rapid prototyping, and factory floor presence
As always, feel free to reach out on LinkedIn if you have questions or want to share your own remote debugging stories! 🎧