ESIG Debriefs: Conversations After The Workshop

ESIG Debriefs: Conversations After The Workshop

By Energy Systems Integration Group (ESIG)Technology
Download on the App Store

All ESIG Debriefs: Conversations After The Workshop episodes

  • Two plants, one pass, one fail

    Two nearly identical power plants submit the same test results, and one passes while the other fails. ESIG's Julia Matevosyan and Alex Shattuck pick up a problem that ran through ESIG's Fall 2026 Technical Workshop in Reston: requirements that don't say clearly what a plant has to prove, or how. They talk about testing, why compliance data has to pass through so many hands, how data center developers are starting to write specifications for equipment manufacturers, and what a decade of standards for inverter-based resources could teach the people writing requirements for large loads.

    Chapters:

    • 0:00 Intro
    • 1:03 How do you prove a capability?
    • 6:31 Who holds the source of truth?
    • 13:46 What IBR history can teach large loads

    Links:

    • Fall 2026 Technical Workshop recordings (YouTube playlist): https://www.youtube.com/playlist?list=PLcxBXIcoEcyw
    • Grid-forming session (3B): https://youtu.be/DnjojJD8k1M
    • Large loads session (1B: Large Load Performance Requirements, Modeling and Reliability Impacts): https://youtu.be/Dmx-QrySvBs
    • IEEE 2800.2 session (5B: From Standard to Practice: Implementing IEEE 2800.2 Recommended Practice for Test & Verification): https://youtu.be/W6mQy1vX_7o
    • OCP specification (Interface Specification Between Hyperscalers and Utility Grid for Disturbance Performance): https://www.opencompute.org/documents/ocp-base-spec-interface-specification-between-hyperscalers-and-utility-grid-for-disturbance-performance-pdf/
    • NERC PRC-029-1: https://www.nerc.com/pa/Stand/Reliability%20Standards/PRC-029-1.pdf
    • June 2027 large loads workshop: https://www.esig.energy/event/large-load-modeling-testing-and-interconnection-requirements-workshop-2/
    18 min
  • When "oscillation" means different things

    The measurements grid operators rely on to catch oscillations are already falling short, and "grid-forming" means different things depending on who's writing the requirement. ESIG's Julia Matevosyan and Alex Shattuck talk through what they heard at ESIG's Fall 2026 Technical Workshop in Reston: what the full-day oscillations workshop turned up, why the grid-forming conversation has moved from the technology to the performance a system needs, where engineers still disagree about what to require, and why having a capability isn't the same as being asked to use it.

    Chapters:

    • 0:00 Intro
    • 0:56 What the oscillations workshop turned up
    • 7:18 Grid-forming: from technology to performance
    • 11:03 What grid-forming should be required to do
    • 15:53 Having a capability vs. using it

    Links:

    • Fall 2026 Technical Workshop recordings (YouTube playlist): https://www.youtube.com/playlist?list=PLcxBXIcoEcyw
    • Oscillations workshop recordings (YouTube playlist): https://www.youtube.com/playlist?list=PLQtqy-hzNPRM
    • Oscillations workshop page: https://www.esig.energy/event/2026-oscillations-workshop/
    • Oscillations workshop, opening session (the one Julia recommends): https://youtu.be/XNG_GwktWVk
    • Grid-forming session (3B: Grid-Forming Performance and Modeling Requirements: Practical Implementation): https://youtu.be/DnjojJD8k1M
    • IEEE 2800: https://standards.ieee.org/ieee/2800/10453/
    • IEEE 2800.2: https://standards.ieee.org/ieee/2800.2/10616
    19 min
  • At the altar of efficiency

    Do data centers and other large loads raise electricity prices or lower them? It depends, and ESIG’s Trieu Mai and Alejandro Moreno explain what it depends on, including who paid for the spare capacity that new loads are now using. In this second episode of ESIG Debriefs, recorded after ESIG’s Fall 2026 Technical Workshop in Reston, Virginia, they also talk about why market designs don’t transfer neatly from one country to another, and what Alejandro calls the biggest philosophical question in the power sector right now: how much efficiency to trade for resilience.

    ESIG Debriefs is a new podcast where ESIG’s technical experts share their take after our workshops. Start with Episode 1, “Learning from the grids that got there first,” if you haven’t heard it yet.


    Chapters:0:00 Intro0:52 Borrowing market designs across borders4:30 Do large loads raise or lower prices?10:23 Efficiency vs. resilience


    Links:Episode 1: https://open.spotify.com/episode/3M3qQxDA6vUoykXpPR10Wg
    Fall 2026 Technical Workshop, with session recordings and presentation PDFs: https://www.esig.energy/event/2026-fall-technical-workshop/
    Session 1A, Evaluating Alternative Procurement Mechanisms for Meeting Resource Adequacy: https://www.youtube.com/watch?v=5x5vyEme-QQ&list=PLcxBXIcoEcyw&index=14
    Closing plenary, The Affordability Imperative: Powering Growth without Pricing out Customers: https://www.youtube.com/watch?v=Um_aw89RyiE&list=PLcxBXIcoEcyw&index=1
    Impacts of Large Loads on Electricity Rates: A Quantitative Assessment: https://www.esig.energy/reports-briefs/rate-impacts-of-large-loads-quantitative-assessment/


    Acronyms: ENTSO-E (European Network of Transmission System Operators for Electricity), ERAA (European Resource Adequacy Assessment)

    15 min
  • Learning from the grids that got there first

    Some power systems already run on very high shares of wind and solar, and their operators are learning things the rest of the industry will need. In this first episode of ESIG Debriefs, Trieu Mai, ESIG’s senior director of programs and research, and Alejandro Moreno, ESIG’s director of global programs, talk through what they heard at ESIG’s Fall 2026 Technical Workshop in Reston, Virginia. They cover how small and island grids are managing very high shares of inverter-based resources, why the requirements being written for data centers and other large loads borrow from the experience with inverter-based generation (and are moving much faster this time), why it can make sense to require grid-forming capability on batteries before every study is done, and what “open” should mean for grid models.

    ESIG Debriefs is a new podcast where ESIG’s technical experts share their take after our workshops. Episode 2, “At the altar of efficiency,” is out now.


    Chapters:

    0:00 Intro
    1:24 Grids running near 100 percent inverter-based
    4:57 What large loads can learn from inverter-based generation
    8:10 Planning when the system won’t wait
    10:40 What “open” means for grid models


    Links:
    Fall 2026 Technical Workshop, with session recordings and presentation PDFs: https://www.esig.energy/event/2026-fall-technical-workshop/
    Session 6B, Lessons Learned from Integrating High Shares of Wind and Solar in Large Island Grids: https://www.youtube.com/watch?v=h2lHFpcpBUY&list=PLcxBXIcoEcyw&index=4
    Session 4A, Collaborative Modeling Across Institutions: https://www.youtube.com/watch?v=krfQne5juMk&list=PLcxBXIcoEcyw&index=8
    ESIG large load reports: https://www.esig.energy/working-groups/large-loads/
    Energy Storage in Global Electricity Markets Task Force: https://www.esig.energy/working-groups/system-ops-market-design/energy-storage-in-global-electricity-markets-task-force/
    June 2026 modeling workshop: https://www.esig.energy/event/integrating-economic-and-reliability-models-for-power-systems-planning-workshop/


    Acronyms: IBR (inverter-based resource), VRE (variable renewable energy), SNSP (system non-synchronous penetration), GFM (grid-forming), NESO (Great Britain’s National Energy System Operator), ENTSO-E (European Network of Transmission System Operators for Electricity)

    15 min