
Sign up to save your podcasts
Or


The integration of the contractor within the design team and process is standard practice for some building types and sectors. For decarbonisation projects it can bring specific beneficial outcomes. In this session the contractor and developer will show how ECI gets projects on site with more cost and programme security and with less risk discussing:
Richard Bartlett, Pre-Construction Director - Willmott Dixon
Speakers
Kelly Crews, Head of Decarbonisation - Willmott Dixon
The British Property Federation's recent Towards Net Zero research asked investors, developers, managers, owners and occupiers about the challenges they were facing in their path towards net zero. Senior leaders from 45 different organisations identified that the biggest challenge they or their clients/tenants faced in the transition to net zero carbon was access to sufficient energy consumption data.
Join the panel as they discuss the data challenges across different asset classes:
The majority of construction glass goes to landfill because the industry has not established the knowledge and procedures to divert this precious and carbon-intensive commodity back into the supply chain. As with all materials, the journey to reuse starts with identifying the glass within a building to understand what can be accepted as cullet back into the float manufacturers' furnaces. The panel will guide you through the entire process of assessment, removal and remanufacture illustrated with the first significant examples of construction glass recycling taking place over the next months.
Speakers
Some novel nature-based materials have been around for millennia but have fallen out of mainstream use, while others are entirely new and innovative. The regenerative capability of new nature-based construction materials may be well-documented but it doesn’t automatically follow that a regenerative product can be brought into the supply chain.
How do we identify and overcome the stumbling blocks in insurance, warranties and other barriers?
Speakers
Metropolis is the deep retrofit of the Woolworth’s HQ building designed by Richard Seifert. Designed to be net zero in operation the project has also saved an estimated 25,000 tonnes of embodied carbon through building retention, mass timber extension and fossil-free fuel in operation. Delivering an exceptional product to future occupiers, the design incorporates around 15% amenity space including gardens, roof terraces, shared amenities and end of journey facilities . Come and hear from the team on the particular challenges faced to achieve the project including:
In 2019 New York City adopted a unique piece of legislation called Local Law 97 setting out operational GHG emission limits for all buildings in the city, both new and existing. A first of its kind internationally, the standard sets maximum emission levels by building program and type, which become progressively stricter until 2050, and sets fines for non-compliant owners. As the law comes into effect in 2024, hear from NYC design and engineering experts on the implications of meeting these requirements and the effects they are having on development, covering:
Businesses are being encouraged to monitor and disclose the results of their carbon emissions, despite the absence of a current legal obligation, highlighting a pressing need for action. For contractors, Scope 3 emissions will likely account for 95%+ of carbon emission so there is no route to Net Zero without tackling Scope 3.
In this session we will explore, with those who have done it, the process of measuring true Scope 3 in the construction industry. Panellists will talk about how about their personal experience tackling the measurement of Scope 3 in their organisations, offer practical guidance and offer a call to arms for the industry to embrace the Scope 3 challenge.
Speakers
There are myriad concrete technologies in development around the world, but the majority of these are at the laboratory stage and not ready to deploy. In this session we cover three of those that have made it to the supply chain: GGBS, limestone fines, and calcined clays.
GGBS is a finite resource. What should developers and specifiers know about making the best use of the limited supply to drive down the carbon emissions of concrete?
Limestone fines and calcined clays are abundant resources. They can be used separately or in combination (as "LC3") to deliver carbon savings on a similar level to a high-GGBS mix concrete. Some concretes using these can achieve as much as a 50% lower carbon footprint than ordinary "CEM I" concrete. What are the realities of using these products in the UK and what is the potential to scale production to meet demand?
Speakers
The built environment is a net consumer of materials and a major contributor to climate change. Future generations are concerned about how current decision-makers are seeking to address this, and many children are already considering what their role might be in the future to make a positive contribution.
Speakers
Countryside Partnership’s development in Hemel Hempstead will deliver 445 low carbon homes. Spencer’s Park is also being used as a monitoring site for Category 2 MMC closed panel timber frame, providing evidence on the benefits of offsite manufacturing, not only for a safer, more pleasant working environment for contractors, but a more environmentally friendly and sustainable solution than more traditional masonry builds.
Speakers:
From the publisher's feed
We bring the smartest minds in the property carbon-reduction world to FOOTPRINT+, so we think it’s only right for us to disseminate all this experience and knowledge freely. Most of what you hear…