  • 088. Planning the Most Important Windows Ever

    One of the main challenges in leading a big team is that nothing ever seems to finish—there’s always more to building a team. Even at milestones, one looks ahead and sees more work to do. In the first few months I had been working on Windows so far, we re-organized the team in a huge way and shipped Windows Vista, only to then have to figure out how to plan a product release with this entirely new organization, while building an improved engineering culture. The planning work began in earnest in December 2006 and concluded July 2007. This is the story of those months and what it was like and what management tools we used to develop a product plan for what would become Windows 7.

    Back to 087. Reorg! Why Are We Together, Exactly?

    SteveB loved to talk about his discussions with engineers as he tried to better understand the company’s execution and culture challenges. He would say “I talked to this engineer on the team, and they told me ‘Look, everything is completely screwed up and everybody telling you how to fix it is wrong.’” Steve would continue to listen to a litany of problems and why everyone was being “dumb” wondering what he could possibly do. Then the engineer would look up and say to Steve, “But I [emphasis on “I”] know exactly what to do and how to fix it.”

    My problem was I was also that engineer. I saw the problems and “knew” what to do. Except it was my job and I had to lead the team to fix the problems.

    Fortunately, early on there was a set of like-minded engineers who were willing to sign up and take on the challenge of building a culture and now a plan for what comes next. From the very start it was not just me driving the cultural changes, but the set of leaders put in place from our big re-org.

    Change across thousands of people, each of whom knows exactly what should be changed, is not a one-time event. Change takes repetition. It takes calendar time. It takes making some mistakes and using those as learning or teaching moments. While everyone was anxious for change, thousands of engineers must be given time to think and reach the point—on their own—of agreeing to a certain kind of change.

    Every step over the next few months, from the time of putting an organization in place to starting the real building of products, we (the leaders) would be confronted with two realities. First, we had to remind everyone on the team consistently and repeatedly of the process we were using and how we aimed to work together. Every. Single. Communication. At times it felt like we were reading the inside of the box of a board game at every meeting. Second, every time we made a mistake and didn’t ourselves follow that process, expect someone to point that out and for that to become a moment of humility.

    It was a constant push-pull with so many wanting to know what we were telling people to build while we were busy pushing back and saying how we needed them to figure that out. At the same time what we wanted to do would look radically different from the past. It wasn’t a top-down plan. It wasn’t a disconnected set of innovations. It was not about consensus of design as in design-by-committee, but a coherence of a plan. The investments (as we would say) were going to fit together into a holistic product plan across our new organization: WEX, LEX, IE, and COSD. After every step in the process, we regrouped as a leadership team and not only talked about what parts of the process we needed to improve, but we turned that into coaching and more outbound communication such as my Office Hours blog. At the same time, we were continuously adapting to what was understood, misunderstood, and especially challenged when it came to process.

    An example of cultural change that was front and center was a desire to match the old Windows team in terms of scorecards or KPIs by automating or operationalizing key requirements. I would be out there talking about vision and scenarios and collaboration—abstract concepts that need to be made concrete by the team—only to find out some people were trying to make a vision scorecard or building an automated testing tool to check if scenarios were complete or tools to red/yellow/green dependencies between different teams. We’d come across this and then would need to course correct and talk about how accountability works without constant monitoring by others nor overwhelming bureaucracy.

    Every email and memo, every team meeting, every 1:1 was a not just an opportunity to reinforce the new cultural norms, but a requirement for us to do so. The first and most important test was developing a product plan for the next release following Vista. For us to get to the finish line with a coherent product all at the same time and all on time we would need to get to the starting line at the same time.

    First, we needed a product name. By now you know I was never a fan of codenames.

    Windows had always had somewhat clever (too clever) code names with layers of meaning. As a consumer of these code names, they neither made for secrecy, as one could routinely read about the release code names in trade press, nor did they make it easy to remember what someone was talking about. “Is that in Nashville or Memphis? I can’t remember.”

    Windows Vista was the sixth major release of Windows and it was version 6.0.6000 for techies. So, by fiat I christened the code name of the release Windows 7. I thought I was being the opposite of clever and we could simply move on, as we had done when we picked Office 9. Oops. Immediately I made two mistakes. First, did I reach consensus on this name? Second, did I even understand the ramifications of the name I picked unilaterally?

    This sparked a debate that only geeks would participate in (at the time and once the name was made public), which was: How did we count versions of Windows? Technically, this was not the seventh major version, as some would debate. My view: Windows 1.0, Windows 2.x, Windows 3.x, Windows 95, Windows XP, and Windows Vista. But wait, there was Windows NT, and there was Windows 98, 98SE, and Millennium edition.

    It turned out there were lots of ways to count and lots of ways to have more than six previous releases or fewer than six. Essentially, everyone could be right. I probably received two dozen emails with different algorithms for counting how many releases of Windows had been done, ranging from “well, it was really only four” to “at least a dozen.”

    I stuck with seven.

    Crisis averted by executive authority. Temporarily.

    The test and engineering system team informed me that we could not possibly “bump the major version number,” as this would cause a whole slew of problems for application compatibility. It turned out many existing Windows programs were bad at checking what version of Windows was running and failed to run if the “major version” (that would be the first digit) was incremented. I knew this from Office 95 when we skipped several version numbers to align all the apps.

    Marketing had input too: that we had to make it version 7.0 because if not the press would think we were doing a minor version and then enterprise customers would not see the need to upgrade. So even though the engineering system did not want the major version number changed, the marketing team did.

    This whole notion of “major” versus “minor” as the press characterized releases would drive me nuts. It seemed as though a major release was one that broke a lot of stuff and finished late. A minor release was one that worked because it polished features and finished on time. My view, no surprise, would be based on resources. Did we have everyone working on the release or did w…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    45 min
  • 087. Reorg! Why Are We Together, Exactly?

    After thinking and writing to provide context to BillG, SteveB, and KevinJo, I had to begin the real work of changing the team. As much as I would have liked to avoid the second step of the “Three Envelopes” (having skipped the first) I found myself planning a reorganization. Not just a reorg though—Microsoft was by many accounts in a perennial state of “reorg hell”—I was planning an organizational change and cultural transformation that would have an effect on every member of the team, almost immediately. That meant more writing. More communicating. A lot more.

    Back to 086. The Memo (Part 2)

    Most big company reorgs are fairly routine affairs that nevertheless cause teams to drop everything, stress out over the weekend (because reorgs always happen on Fridays) and contemplate what might change. But then returning to work on Monday, little changes immediately except for somewhere up the org chain there’s a new boss who will in a matter of time introduce some changes. Most reorgs are not nearly as big a deal as all the time and energy that goes into talking about them.

    This was especially true at Microsoft which, at least to many, felt like it was in a constant state of reorg hell. In my early days at the company, I experienced several reorgs in the most senior (other than BillG) executive structure from having a president to not having one, to adding a COO to removing a COO, three-in-a-box (the BOOP, Bill and the Office of the President), back to a president, then a president and COO, then SteveB as CEO and BillG as Chief Software Architect, and so on. Office itself bounced between a few executives over the years as well. In fact, just as I was in the middle of planning this June 2006 announcement, BillG announced he began transitioning from Microsoft to spend more time at the Foundation. Ray Ozzie (ROzzie) would be appointed Chief Software Architect (CSA).

    The thing about reorgs is that most people are trained, best case, to scan the reorg mail and see if their team is directly affected by the change. Specifically, how far away is the new boss. If there’s no immediate impact, then just go on doing what they were doing. In practice, most reorgs at scale don’t affect most people directly or immediately.

    The Windows and Windows Live changes were not like those reorgs. This was not a change at the top. This was a change for literally everyone in the organization. More than half the team would get new managers soon after Vista shipped, and everyone would have a new manager no more than three hops up the chain.

    It was even more than just that. Jobs were changing and with that many mental models of career paths were being upended. Everyone who thought they had plans for what would be next would wake up to something different. Aspirational jobs as a PUM or an architect with no direct reports (or code) were no longer going to be available. We were an engineering organization, and everyone was going to be asked to focus their trajectory on building products. Even becoming a manager was deemphasized as we asked managers to take on more directs while we reduced the percentage of the team that were managers by one-third.

    Then beyond that we had every intention of radically changing the way we would work. Everything from the planning process to daily builds to milestones. Even meetings with execs would decidedly change (or mostly go away).

    I spent May and June 2006 on two things.

    I was mostly meeting more people on the team and figuring out who would be filling in the organization I am about to describe. These meetings were a constant reminder of the desire for change. They were also opportunities for ongoing reminders that Windows and Services are different and more difficult than Office. I probably wrote 500 long emails replying to questions about everything from the future of specific technologies (most of which I knew nothing about: USB, DirectX, virtualization, and more) or to suggestions for how we could improve. I received quite a few questions asking “how do you want us to…?” on everything from hiring to signing purchase orders. There were many questions that were very specific to situations and people that I knew nothing about. The questions always seemed to boil down to process and culture challenges, never about domain expertise. It was 7x24 from the end of March to the end of June.

    To remain sane, I was also installing daily builds of Vista and Office 2007 which were both winding down. Not being in the daily triage meetings for Office was kind of sad for me. I vividly remember sneaking over to the ship-room meeting one time, which proved to be silly and indulgent on my part and a distraction to the team. It was, for me, a moment of sanity just to see the team working, and by that I mean not taking any code changes.

    Mostly, however, I was genuinely scared. I had absolutely no doubts about what we needed to do, including how to structure the team and what to ask of them. I had a lot of doubt that I’d be able to pull it off and most days wondered if I was the right person to drive these changes. There was so much baggage coming from Office.

    Something that I was keenly aware of was how many managers, myself included, viewed reorgs as something of an adversarial process. A reorg was something to protect the team from, not something that could help. Reorgs prevented work from happening and were a distraction. That’s certainly how I treated a lot of what went on above me for most of my career.

    Now it was my turn. The very last thing the company needed was for people to view the changes I was putting in place to be prevented or redirected. I was terrified.

    Would people quit? Or likely, how many people would quit?

    Would people run to the gossipy press or Mini-Microsoft?

    How much email would be sent to SteveB or BillG? And, yikes, would they answer it?

    What if no one wanted any of the new jobs I was proposing?

    My first step was to figure out the new leaders. In picking those leaders I was also certain of how the overall organization would be shaped, my direct reports and their direct reports and so on. This structural change was the visible symbol of the reorg. It was a massive pivot away from a product unit organization to what I called a “functional organization.” A functional organization is based on having discipline specific leaders reporting at the top and their teams consisting entirely of people within those disciplines of development, testing, and program management. Across each of the disciplines we would have mirror structures of group managers, leads, and individuals. I sketched out the math and knew we could build the organization out of about 40 teams of 25 developers each (and 25 testers and a dozen program managers, under their discipline leaders.) In due course, the intention would be to organize COSD this way as well though we needed to let them finish Vista for a bit more time.

    I would love to spend more words in this section describing the inherent tradeoffs between these two organization types, but it would be a bit of a distraction from the story. Instead, I would refer the reader to Functional versus Unit Organizations, an essay I wrote in 2016 on this topic.

    In assembling a team of new leaders, I tried not to be the guy who brought “his people” from his old job, but there simply weren’t any candidates in Windows that would champion the changes we needed. You’re not supposed to show up with a team, but managers almost always do. I never understood why that was the case, but after living through this I have a more visceral understanding. It is not about the personal connection, as most think, but in times of change you need to have a team of people who share the same world view by default without having to guide at each step. Without that, change is impossible.

    I thought I wasn’t going to be that exec, but I was. Only to a point, however. Within the team, I was able to find a balance of “natives” and “imports.”

    Here’s how the leadership team shaped up: The S…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    31 min
  • 086. The Memo (Part 2)

    The previous section detailed the raw observations on Windows and Services culture I saw after weeks of hearing about the situation from as many people as I could. I could not just put that out there without specifics of what I thought could improve. I had to put some structure on what I learned and to offer optimism and aspirations.

    Back to 085. The Memo (Part 1)

    Reflecting on this moment of both optimism and fear, today I look at the candor I expressed with a bit of amazement. I wrote with detail and assertiveness yet seemed to forget that I was writing about one of the most successful businesses ever created. I was writing about hundreds of billions of dollars of market capitalization. I was writing about many friends. At the same time, there was so much that needed to be improved or more specifically to be repaired. I think what really motivated me were all those 1:1s I did and hearing all the different people expressing their pain and troubles, knowing things could be better. This was not a team that was dug in ready to resist change. It was a team waiting for change. It just needed to be the right kind of change.

    That reality made this much easier. I felt if I could document what was going wrong and the broad population agreed then I was on a path to addressing challenges. If I could articulate reasonable aspirational goals, then what remained was to build a product plan on that rebuilt foundation of trust in management.

    I was quite worried that both the problems described and the aspirations I would document would seem cliché. With BillG in particular, over the years he had shown little patience for the broad topic of management. His world view was always that the business would be best served by taking on the most difficult technical problems and developers would be anxious to tackle such challenges. That recipe propelled Microsoft for twenty years of Windows but was failing us now. SteveB was never one for patience and while he would be receptive to these management challenges, he was far more anxious about a plan and the timeline for the next product to address the concerns that were mounting about Vista—the company hung in the balance. KevinJo had just orchestrated a massive restructuring of the global sales force before taking over most of product development. He was deeply in sync with the idea of identifying organizational problems then directly addressing those.

    The memo, Observations, Aspirations, and Directions for Windows and Windows Live, proposed three main areas to address: decision-making, agile execution, and discipline excellence. Each was presented in a section with both observations and aspirations.

    * Decision-Making

    * Agile execution

    * Discipline Excellence

    These points will sound like random musings from any generic book on management, both at the time I wrote them and reflecting on them today. The lesson learned, using the phrase from the previous section, is to demonstrate that these are more than clichés by citing specific examples that resonate with the employees who are being asked to operate differently and specifics on exactly how we will achieve aspirations.

    Decision-Making

    Across all of Microsoft, “decision-making” had been a constant and nagging issue. We discussed it after every MS Poll (the yearly survey of employee attitude and feedback), and each year I was left puzzled. It had never been an issue for our team (in the MS Poll and other feedback channels). I didn’t understand what was so difficult about decisions. We made decisions all the time in Office, so many it wasn’t even clear to me what decisions were so difficult.

    Then I arrived in the Windows hallway.

    There, it was an endless discussion of who “owned” a decision or who was “accountable” and, worse, people were asking me what “model” I used to make decisions. This was a reference to classic models of business function (or more aptly dysfunction) that use tools known as a responsibility assignment matrix (RAM, one such tool) for decision-making. One labels participants as: Responsible, Accountable, Consulted, and Informed (or RACI). Another such tool, OARP, stands for Owner, Approval, Responsible, Participant. These tools consistently proved frustrating and there was little evidence that decisions were made with less effort or more importantly, more staying power or higher quality.

    The use of these tools arose as a defense mechanism against executives and managers who were prone to swoop and poop, a metaphor I learned as I assimilated into the team. As with birds, many managers seemed to show up at inopportune times, issue a quick opinion or edict, and not stick around for the mess they left behind. How much of this was actually a mess or simply a reaction to executive authority or inability to influence decision-making would take time to untangle. The expectation for me as a new Windows executive was that I had a tendency to employ this technique, no matter my own personal history or approach.

    What I knew already to be the case turned out to be a big part of the problem, and that was a culture of escalation. In all software projects at scale, it is always the case that one team depends on another team—to provide code, consume code, integrate things together, and more. And this extends to sales and marketing connections. In Windows, escalation seemed to be the way most situations between teams were handled. It was a culture in which nothing was decided until people got in front of a VP, resulting in a culture where most of the middle management layer was biding time. And did I mention there were 7 or 10 management layers in Windows?

    Weening the team off the culture of escalation proved to be one of the bigger cultural transformations I needed to make. It was also the root of challenges over many years of work between Windows and Office. In a culture of escalation, decisions made by people on the front lines, so to speak, rarely stick. In fact, escalation was done expressly to reverse lower-level decisions. If a Windows partner or collaborator doesn’t like the situation then an escalation ensues, and rarely did things stay the same. Office loathed escalation. Decisions were pushed down and stayed down. When people tried to escalate, they were told to work it out. The result was that when Windows tried to escalate decisions in working with Office they rarely got overturned, which proved enormously frustrating to Windows. And when Office tried to make plans, they would often find them upended at executive escalation meetings with Windows.

    In Office, escalations happened so infrequently I cannot even recall any specific instances. In fact, we in Office had a saying that “escalation is failure.”

    The primary downside of escalation is the way it shifts accountability. The winning side in an escalation feels an accountability not to the decision, but to winning the process of escalation. The losing side (and yes, they feel like they lost) does not feel bought into the decision and if it does go wrong, they too will join in the chorus of pushing blame up the chain. This is exact opposite of what you want to happen in times of making difficult decisions. The second-order effect is the obvious problem that as decisions are pushed up the chain there is less detail on execution related issues available, and usually that is where the trouble starts. These downsides were especially acute in mid-2000s Microsoft which was so much about improving accountability.

    Given the crisis situation I was facing it would have been trivial to declare some sort of emergency and take control like a field general in a losing battle situation. Not only would this have been straightforward and arguably predictable, but it would also have fed right into the dysfunction that was already present. Sucking up all the difficulty would have been another management cliché, but one I could avoid.

    Changing the culture surrounding escalation was going to be tricky. I decided to focus on consensus as a core tool for deci…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    44 min
  • 085. The Memo (Part 1)

    Everyone in their career should have one memo that they think of as the most consequential. For me, it is a memo I wrote after a about six weeks on the Windows team. Under intense time pressure to figure out what comes next with Vista rapidly approaching final release (not formally, but it was going to soon be all but impossible for code changes to make their way into the product) I had to come up with next steps. Over the next four posts, I want to share not just the memo but more about what it is like to live through a major organizational crisis and work to set things up for building a new engineering culture and new team structure, all in a couple of months.

    Back to 084. How Many On the Team, Exactly?

    The history of Windows releases was cursed when it came to product and leadership. Like Star Trek movies, Windows releases alternated between good and bad, odd and even. Line up the OEM products by availability date, and you’ll see this is basically true—starting at Windows 3.0 and changing to the NT kernel with XP (3.0, 3.1, 95, 98, 98 SE, Me, XP, Vista.) Compounding this, the curse says, no leader seemed to last more than two major releases of Windows.

    My neighbor, a successful biotech entrepreneur, asked me about the curse the day he read the org announcement in The Wall Street Journal story saying that I was moving to Windows. He wished me luck.

    After 140 scheduled 1:1s, 20 team Q&A sessions, over 30 hours of office hours, and countless hallway conversations in a dozen different buildings I had to do some thinking and organize what I observed, heard, and learned. That meant writing.

    A dose of reality was needed with BillG, KevinJo, SteveB, and to some degree even the Board.

    I did that with a 20-page memo titled Observations, Aspirations, and Directions for Windows and Windows Live. For me writing is thinking and I really had a lot to think about, hoping others would join in. I felt alone for long enough and I was certain SteveB was growing increasingly anxious for what would come next. I had been talking to KevinJo constantly over the past few weeks as he was doing a huge amount assuaging those that essentially rejected the idea of an Office person leading Windows.

    The 20 pages were the most difficult I wrote in my entire career—to literally put these words down—I knew they would be impossibly difficult to read. I was deeply concerned that what I wrote would be viewed through the simple lens of setting expectations or painting as bleak a picture as possible so that I could be a hero later.

    It seemed that everyone, especially SteveB, wanted the plan for getting things back on track and a product roadmap. He also wanted to be able to communicate to the field and bring comfort to customers, while continuing to support Vista when it shipped. Bill was especially keen to restart discussions over product investments that had been cut since the Longhorn reset. Kevin was getting his footing across wildly disparate businesses including the massive money-losing online services.

    I couldn’t kid myself, however, as I too needed a plan. The team was still frantically fixing bugs, but in order to ship by October that would soon end. The bar for fixing bugs would rise dramatically by summer. Idle hands will make trouble for sure. Projects will start, code will be opened up to changes, and worse presumptive commitments to outside customers and partners would be made, and so on (all business as usual for Windows.) For there to be a release that addresses any challenges I would need to orchestrate that every team at a project arrive at the starting line at the same time in order to finish at the same time. In other words, I had only about four months and one shot to get all this figured out.

    Adding to the stress, the OEMs were extremely anxious as they were reeling from Vista missing both back to school and holiday selling seasons. They were used to hearing plans, or at least slide decks, about future releases so they too could plan, as much as that was worth. A January launch was painful for PC makers as it meant they had to stock up retail outlets with PCs unsure if the buzz over a new OS release would dampen Holiday sales or not, and then deal with upgrades new customers demanded on those PCs. It was messy.

    In round numbers, fiscal year 2005 had revenue of about $40 billion and net income of about $15 billion. The Windows OEM business on its own was $12.2 billion (about 30% of Microsoft—incidentally it is not possible using public data to compare these to today’s Microsoft, much as people claim to) and $9.4B in net income (about 63% of all of Microsoft). OEM revenue was highly concentrated in six major and global PC makers, each CEO with a direct line to SteveB and KevinJo.

    My memo solved for none of these immediate issues. Instead, it was a lot of bad news and, in contrast to conventional wisdom or expectations, was less about strategy as it was about execution and culture. It diagnosed, without blame, the situation as I saw it. I provided a ton of data about the organization. I detailed structural problems that I was worried would feel trivial up the management chain. It was a lot of work to count the number of people and find out how much money was being spent (on projects, not salary). It was disappointing that for all of the staff and managers, the most basic controls over dollars and headcount were not in place.

    Something BrianV once told me really stuck in my head years earlier. In his inimitable way he reminded me, “There’s just a lot of s**t going on in Windows all the time.”

    I was fast learning he meant that in every way possible.

    There’s an old business story usually called “The Three Envelopes” about an incoming executive taking over a dysfunctional team. The outgoing exec offers advice to the successor in the form of three envelopes, with instructions saying, “when things get tough, open them one at a time.”

    After a bit of time, things indeed got tough. The new exec opens the first envelope. It says, “blame your predecessor.” They do and it buys some time. A bit more time passes, and things take a turn for the worse, so the second envelope is opened. It says, “plan a reorganization” which improves things. Some more time passes and desperate for help, the third envelope is opened. This envelope reads, “prepare three envelopes.”

    Good grief, I thought. I felt like I’d become the punchline to a business joke.

    I promised myself I would never blame my predecessor and never ever did. I went out of my way to avoid that not only myself, but to remind people not to do the same. There was no escaping we were going to enter some new era as a team, hopefully for the better, but I was not going to permit our time to be defined as positive compared to a blame-worthy negative.

    I was troubled, however, because I knew we were going to reorg. I really thought I could get through this change without becoming a living cliché, but as I quickly realized sometimes…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    22 min
  • 084. How Many On the Team, Exactly?

    Much of what Hardcore Software has been about was what we were building (and why). This chapter is about how. Specifically, I wanted to delve into the management structure and what we worked through to restore efficacy and build a new kind of Windows team. Over the next few posts, we will journey through understanding of the cultural challenges the team faced, figuring out a plan to lay the foundation to address those, and then putting that plan into action. This first post gets to the core of understanding what precisely the team is building by figuring out how many people work on what projects. That should be simple, no?

    Back to 083. Living the Odd-Even Curse [Ch. XII]

    When you move into a new job there are a lot of things that need to come first, too many. You want to touch base with the most critical individuals, but don’t want to minimize the importance of those less so. You want to focus on the high priority areas of work, but it is times like this that the lower priority work hardly needs to be reminded of that fact. You’re dying to ask a lot of questions, but people are dying to tell you things. Then there’s the political reality that the many things pushed to you or that arrive in your inbox are often those least needing your attention, but most likely to notice a lack of attention.

    I had all this to think about while both being reminded of Windows Vista every day and needing to let the team in place finish the project without interference, inadvertent or otherwise.

    It was extremely weird to commit myself to learning about Windows and the Windows team. I had, after all, essentially grown up around it, just not in it. I knew the Windows product. I knew the Windows people. I just had no idea how the people made the product. I knew the organization at a super granular level from Windows 3.x and Windows 95 working on toolbars and app compat and the shell from C++ and Office. I knew things at a strategic and executive level.

    I had a high-altitude view of the organization, and I knew a lot of individuals, but between a few feet off the ground and 50,000 feet above the ground I had a lot to learn.

    Little was as it seemed, however, when it came to the details.

    There’s a well-known military principle on knowing the difference between lessons and lessons learned, between reading about something and having learned that same thing through the experience of changing how one operates. Any management book will tell you to know the budget and resources on a team and that’s a good lesson. In the Microsoft culture filled with cookie licking, shiny objects, and side projects my most important lesson learned is to actively track how many developers there are and what code are they writing. Every time I was uncertain of what a team was actually building or if a project was real, understanding the number of developers assigned to which code was the most valuable information to have and the most critical to keeping a project on track. I learned that with NetDocs, the Tablet PC, and so many 1990s internet projects long since passed. Everything other than actual working developers is just talk.

    Therefore, the first thing I chose to do was to get a handle on the composition of the team. With the help of Kristen Roby Dimlow (KristenD) from HR, one thing became clear: I was in a new world. KristenD was previously our finance partner in Office, coincidentally, and brought with her a refreshing analytical view of the structural challenges I (now we) faced. Kristen began immediately trying to collect the data on who was doing what.

    In Office, headcount, resource allocation, and org structure were readily visible and, for the most part, easy to figure out by looking at the company’s online system headtrax. Windows was a different apparatus. While there was a headcount number, what they were working on, for whom they were working, and even their actual physical location, were all less clear, or fuzzy.

    In keeping with Windows tradition of reorgs that “split the baby,” or product organizations that were structured such that accountability and ownership were muddled, the job I was given was not as much the “Windows job” as most would at first perceive. This wasn’t a surprise at all to me—I knew what I was getting into. This was the Windows Client team previously described. COSD remained separate as it was already.

    To KevinJo and SteveB, accountability was clear, even if the organization structure and people were not. This was typical Microsoft accountability in the 2000s. I was their Windows “guy” and decidedly on the hook to figure out what comes next. Kevin had a huge amount to figure out. He was clear just how much he was hoping I could wrap my brain around with respect to “what comes after Vista?”

    Along with the Windows client, there was Internet Explorer and the user facing side of Live services—the split of everything down the middle was alarming when it came to accountability, but just how alarming required more investigation.

    The Live services represented a lot of headcount but the revenue numbers did not seem so big to me at the time. By Microsoft Online Services standards there was significant revenue associated with Hotmail and Messenger. Hotmail sold display advertising, perhaps $300-400M worth. The ads were intrusive “right rail” ads that took up the right side of the screen. The running joke was that the most popular ad was for a toe fungus medicine. The team was working hard to try to sell Hotmail Extra Storage, upgrading to 10MB (later 50MB) for $19.95 per year. Google’s Gmail had no ads and essentially free unlimited storage. The unlimited storage was not a gimmick, Google invented a novel “infinite” and reliable storage mechanism enabling the capability. MSN Messenger was selling ads inside the client application (less than Hotmail), also intrusive, though the move to mobile phones and the growing competition from Skype were both problems. In other words, the few hundred million dollars in revenue was not remotely sustainable and at the same time the products were struggling.

    Almost an after-thought in all the discussions about me taking this job was the fact that I would also manage the new homegrown Search product, which was recently branded as Live Search. It would not be Bing for another two years. The team was growing rapidly (up to almost 100 engineers) but was still very new and clearly a very distant competitor to Google (with over 10,000 employees). The first beta test of Live Search started just weeks before I joined the team.

    Christopher Payne (ChrisPa) was chartered with leading the team. He was the vice president and team founder and had returned to Microsoft to lead many of the MSN Services efforts. In a moment of boldness for a team under a great deal of fiscal pressure, in 2003 he proposed to BillG a massive effort (expensive investment) to build out a search product that would compete with Google. This included maps, instant answers, books, and more. At the time, as crazy as it sounded, Search across all of MSN was a hodge-podge of business development deals and outsourcing—to compete with Google. In his prior time at Microsoft, Christo…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    37 min
  • 083. Living the Odd-Even Curse [Ch. XII]

    Welcome to Chapter XII, where Hardcore Software turns from Office and enterprise customers to Windows and consumers (and PC makers). For many readers, this will also be a bit more of their own lived experience. As such it is worth a reminder that I am sharing my experience and observations, not any sort of omniscient history (if such a thing even existed). Importantly, by waiting a decade to write, the history becomes much clearer and less influenced by the emotions or immediate reactions. That’s certainly been my experience so far in writing HCSW. These next four chapters (about 25 sections) will cover Windows 7 and Windows 8, with a decidedly different approach than the previous 11 chapters. We will see much more focus on organization, strategy, culture, real competition and disruption, and the challenges and opportunities seen in a big giant company.

    Back to 082. Defying Conventional Wisdom to Finish Office

    2006: The year was marked by cultural shifts. BillG announced he would step down as chief software architect, a transition that would take two years. I was given a new role and faced multiple corporate and culture challenges, and outside of Microsoft the tech landscape was changing too. And fast. “To google” was added to the dictionary.

    By the start of March 2006 the Longhorn product cycle had been a chaotic five-plus years that included the security work for Windows XP, the release of Windows Tablet PC, Windows Media Center, Windows 64-bit, Server releases, and importantly, a major project change called the Longhorn Reset, essentially defining a new scaled-back product mid-flight based on the original Longhorn. The Windows team had been through a lot and was not finished. Longhorn had been receiving a lukewarm reception from users of a big Community Technology Preview release since the fall of 2005. The team, however, had started updating the product more frequently and momentum was indeed shifting by early 2006.

    Windows Vista, as it was officially named, was still an unpredictable amount of time away from shipping. While not public at the time, a couple of weeks down the road, Microsoft would announce a final and just-decided delay to ship Vista for availability in January 2007. The team could not commit to making the release available in time for PCs to be sold for back-to-school or holidays 2006. Vista would eventually release to manufacturing in November.

    Windows was still on fire with PC sales breaking through 200 million units in a single year for the first time, demonstrating extreme product-market fit. Both Servers and Tools were doing well, extremely well, except there was a nagging problem emerging from across Lake Washington called AWS, Amazon Web Services, a shift from companies buying Windows to run on their own server computers to renting storage and compute in the (or a) cloud. There was a good deal of tension between Windows team and the Server team. The Server org required the Windows org to contribute to shipping a new Server. This delayed a new Server product, slowing their release based on Longhorn until the next Windows release. The .NET framework and Visual Studio had become leaders for IT development within corporations, but the onslaught of Linux, Apache, MySQL, and PHP (later Perl/Python) continued to dominate the public internet and the university programs in computer science.

    On the RedWest campus the investments in online services faced a myriad of revenue, cost, product, and usage problems that were not nearly as visible as the Windows challenges. Wall Street, however, was growing increasingly impatient with financial results, which seemed to punish SteveB for his transparency. There were dozens of Microsoft online services, some branded as MSN and others using a new umbrella name Windows Live, in every conceivable category from selling cars (MSN CarPoint) to chat (MSN Messenger) to finding Wi-Fi hotspots (MSN Wi-Fi Hotspots.) Microsoft seemed to be searching for a big win against Yahoo and a rapidly dominant Google in the world of internet advertising and consumer services.

    Google was top of mind for many, not because so many groups across Microsoft competed with Google products but because of the aura the 2006 Google culture achieved. Google was fast. They were innovative. They were empowering. They had “20 percent time” when engineers could work on whatever they wanted one day a week. They had free gourmet food and a chef, all day long, compared to our grungy filtered water dispensers and subsidized airport food with limited availability. They had snacks and we still had noodles and one type of V8®. They had massages, while we had a multi-purpose sports field, but no towels (note, towels returned in the summer 2006.) We had individual offices and they had collaborative open plan cubicles (you read that correctly, Microsofties complained about having offices.) They had a modern, flat organization with 50 reports to a manager (yes you read that right too.) In the blink of an eye to me, everything we held near and dear and made Microsoft an icon of business culture, seemed to be old, tired, and either wrong or inadequate, like wearing khakis, loafers, and a button down to Burning Man.

    Google Chrome was still almost three years from launching while Internet Explorer had 90% share. The last new release, however, was Internet Explorer 6.0 launched five years ago with Windows XP frustrating users, web developers, and the market. Gmail was about to turn two and it was crushing Microsoft Hotmail with its superior junk mail filter and massive free storage. Microsoft just started to build its own web search product which would launch in 2006 as Windows Live Search into a market where Google had already overtaken Yahoo and grown to half the market while gaining a half point of share every month.

    As Vista was creeping along, albeit faster these days, toward shipping, there was a much deeper problem in Windows that was symptomatic of the broader malaise or even open hostility across the company, especially in engineering. Even though the company kept putting up blockbuster numbers, the morale across product groups had declined. Vista had contributed to that. Integrated Innovation had as well. Integrated Innovation was the expression at the CEO level of the desire and right to build integrated software, which continued to be challenged in the courts and among regulators. Internally, this was the opposite of what people wanted to hear because the feeling was Integrated Innovation, or synergy, was what had first gummed up Microsoft relative to Google. The yearly Microsoft Poll survey was a litany of complaints and issues from employees across most of the product groups.

    In a semantic twist, the phrase was later morphed into Innovate then Integrate. That might not have helped. In reality the pressure for synergy had not relaxed at all as it was a cornerstone of Microsoft’s (and BillG’s) strategy and culture, even more so as the company became an enterprise company given how much enterprise customers and the enterprise ecosystem valued synergistic strategy, or maybe strategic synergy. Strategy was the anchor holding back Longhorn. A scathing cover story in the September 26, 2005, Busine…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    34 min
  • 082. Defying Conventional Wisdom to Finish Office

    As we conclude the story of Office12 and the major redesign of the product, Microsoft of late 2005 to early 2006 is in a bit of a lull which for better or worse is good for the launch of Office. Longhorn continues to stretch out and the lack of clarity continues, which is putting a drag on everyone. There’s something very special, yet bittersweet, about this release of Office.

    With the conclusion of this chapter, Hardcore Software, will start to get into Windows. I have about 30 stories planned. As my roles have changed so too have the stories. With Windows, we will see a lot more detail on organization, change management, strategy, and direct competition. If you are not a subscriber, please consider signing up. Audio will continue to be free and posts with all the graphics, artifacts, PDFs, and videos will be available to subscribers.

    Back to 081. First Feedback and a Surprise

    Nearly every country’s “Feedback to Corp” slide at the grueling field sales multiweek Mid-Year Reviews (MYRs) in January 2006 published the same bullet point:

    🚩 Office “12” – Needs Classic Mode

    What was this big, and clearly coordinated push for something called classic mode, and why now? We, of course, knew what it was but we did not know why this was happening now. It was very late in the schedule, post-beta testing. We were just months from scheduled completion as we just went through the final validation of the product—when the team is changing as few things as possible for the last few months, certainly not making any design changes.

    A broad public beta went out to most enterprise customers as well as the technical press. More people enrolled in the beta than we expected or could even imagine. There was a great deal of interest in such a bold direction for Office.

    As with the technical beta, the reactions came swiftly and clearly, often based on little more than the first few minutes with the product. Reactions from the press arrived in three waves—straightforward news of the release, first looks or reactions based on first experiences, and then, after a week or so, deeper dives into the product.

    The first looks wrote themselves as we expected. Office12 was a sweeping change, and the obvious commentary or controversy questioned whether customers or the market were ready for it. Would it work? How difficult would it be to learn? Almost always the point of view of why the change was made was reflected, but the tone was skeptical. That was kind of annoying, but entirely expected.

    For example, CNET’s Ina Fried who is always fair and balanced, said, “The radical revamp could help the company as it seeks to stave off competition from OpenOffice and others, but it also risks alienating those who like things the way they are.”

    Computer Reseller News, the trade publication focused on small and medium business, went to great lengths to express concern. “While most users will welcome the additional features, Microsoft’s decision to teach its customers a new user interface for accessing commands and functions could be a risky proposition. Once the beta testers (and the bloggers) have registered their opinions, some Office 12 design points could be in for a course correction.”

    A more detailed expression of concern came from CNET’s editors. “In the past, Microsoft has sabotaged itself by unrolling too many new features to Office too fast. We’re keeping a lookout for problems; after all, Office 12 was in its storyboard stages just a few months ago. If you’ve spent the past two years mastering Office 2003, prepare for a steep learning curve.”

    These articles generated the MYR feedback. The enterprise account managers, essentially all our revenue except for Japan, were on the verge of freaking out. They saw the Ribbon as pure friction in the way of revenue and nothing less. They cited doubts expressed in the articles, reprinted in every language around the world, as evidence of deep concerns over the direction Office was taking. They did not want to spend energy selling Office where the assumption was we’d already won. They wanted to focus on selling the big server strategy, where we were losing to open source Linux and a host of smaller competitors. So why put up a barrier, they asked.

    As if to highlight these enterprise customer concerns even more, in the spring of 2005 Office marketing rolled out worldwide a series of advertisements as a follow-on to the “Great Moments” campaign previously described. Attempting to inject humor into the extremely enterprise Office 2003 wave and to encourage customers to digitally enable knowledge workers, marketing developed a new advertising campaign affectionately called “Dinosaurs” though formally called “Evolve.” These ads featured humans in the office but with oversized, cartoonish dinosaur heads, implying those who have not yet embraced a digital workstyle including running Office 2003 were dinosaurs. In other words, we called nearly all our customers dinosaurs. At least the ads were popular in Japan, a market known to appreciate a good mascot, where the company distributed a large quantity of small plastic dinosaur heads.

    Very quickly what felt like a magical release suddenly seemed to be worrisome to the sales force. That was not acceptable.

    We obviously took on a significant risk in choosing a complete redesign of Office to address our “good enough” challenge. In hindsight sometimes I can hardly believe we did so. Now that we had 18 or more months of time to develop the product, we were genuinely confident.

    Our previous attempts at addressing bloatware or the belief the product simply did too much each failed. These approaches were rooted in the conventional wisdom of different stakeholders:

    * Reduce User Interface. From the earliest days of the product, the path to simplicity was to minimize the amount of interface visible on the screen. The conventional reaction to bloat was to proclaim less is more, as we often read about in reviews and analyst reports. We did our best to avoid removing features. Instead we twice tried a few design tricks, one was Intelligent Menus and the second was the technique of rafting toolbars.

    * Office Lite. The business view looked at price points and wanted to meet good enough with a lower priced offering without upsetting the main revenue stream of course. The way to compete would be to have a stripped down, easy to use, easier to administer, lighter-weight version of Office, that cost less. We solved for this problem by changing the composition of SKUs to create lower price points, rather than chasing the low end as previously described.

    * Customization. Customization was always the easy way out. If a customer or IT group didn’t like something in Office, they could just rearrange it. The tech enthusiast users and those early in the beta process said the would be fine with the Ribbon, so long as it enabled full customization by rearranging the tabs or conten…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    38 min
  • 081. First Feedback and a Surprise

    We’d been working on Office12 for almost two years and the product had made enormous progress. The team was buzzing, and everyone was very excited. This product was different. We were building something we could all feel. It was a product that was good for individuals, not just organizations. Still, no one outside the company had seen it or knew of the monumental changes we were making. The user interface in Office was not just a user interface for the PC, for many many people for the past 15 years it had been the interface for the PC. We were quite confident. JulieLar was confident and prepared. This was a big moment, the first public showing and then the first feedback.

    Back to 080. Progress from Vision to Beta

    The first lesson of interface redesign: Do not unveil the design with static pictures.

    The second lesson of interface redesign: Do not unveil the design with static pictures.

    At the 2005 Professional Developers Conference (PDC), Chris Capossela (ChrisCap), Corporate VP of Information Worker Marketing, joined BillG on stage for a sweeping demonstration of Windows Longhorn along with the first public reveal of Office “12” (the quotes with a space became the official way of writing the name). ChrisCap and the marketing team zeroed in on the positioning of “Better results, faster,” while also pointing out that Office was “New, but feels familiar.” The demonstration zipped across Excel, Word, and PowerPoint, showing all the elements of the redesign and dozens of new features, along with many others previously undiscoverable. I was sitting anxiously in the very back of the room gauging how people reacted. I did not have to listen too carefully as during the demo someone shouted out to the stage, letting everyone know how they felt.

    “Ship it!” they yelled.

    We were still two months away from the first public beta, but this felt good. Only afterwards watching the tape did I realize we were being made fun of. Chris inadvertently missed a beat in the demo. His words describing what should happen did not match what was happening on screen. It looked like a bug and “ship it” was a classic Microsoft reference to shipping something with bugs. Nevertheless, the reception for the demo was quite positive.

    The excitement spread through the industry.

    Technorati, a tech news site that measured the important or high impact blogs on what was then called the blogosphere, was the place to be seen in the press. Our redesign made that home page, a first for plain old Office.

    Despite the excitement of the moment, we learned a good lesson.

    The video of the keynote was posted, but in 2005 not everyone was hip to consuming video. That meant that the still images (from Treo phones and the like), screenshots from the event, and JensenH’s later session made their way around the blogosphere. That proved to be a mistake. The spread of simple static screenshots for such a major change in user interface was not the way to communicate the redesign.

    Almost immediately we were confronted with a wave of comments proclaiming the Ribbon to be too big and that it took up too much of the screen—assertions made by comparing screenshots to the current version of Office and making snap judgments. Attendees at the developer conference were counting pixels but not considering the full scope of the design or the experience. Besides, there really was the same amount of room for content—that was a key point of the design.

    We did not anticipate this level of dissection, and that was a mistake. This immediately reminded us, especially JensenH, of his redesign of Outlook and the furor over the layout. Recall from the previous chapter that we had a spirited debate among early testers over whether the layout displayed fewer or more email messages. The question being asked was whether the ribbon took up more space than the toolbars and menus previously there.

    We had some work to do.

    Lost in all the comments about how big the Ribbon seemed to appear was the fact that we eliminated the row of menus entirely. Some comments and blogs slowly absorbed that reality over the course of the day as the magnitude of the design began to sink in. The Ribbon was not, as people thought by looking at a static screenshot, a big, fat, tabbed toolbar. It was so much more.

    Also missing from this discussion were the differences between tech enthusiast or developer use of the product and typical users. We knew the typical user interface experience from instrumentation. Most users ended up with two rows of toolbars, the main menu, plus toolbars floating around the screen, and the side pane (that innovation from Office XP) each obscuring the document or squeezing in on the user’s work. By contrast, a very small number of tech enthusiasts prided themselves on purposely designing and maintaining a very select set of commands, often in a single floating tool palette (itself a very poor choice unless you have a giant screen, which many developers did). This was not the real world or even the base case, though we would eventually craft an answer for even this hyper-customized form of user interface.

    In hindsight, letting the static shots out without video or animation was a rookie move that we corrected eventually. We were at the earliest days of real-time reactions to product launches.

    Microsoft had recently begun using video as a means of connecting with the tech enthusiast community. The Developer Relations Group (DRG) created an online video site, Channel9, hosting videos with product leaders from across the company. JulieLar initiated the ground-level engagement as a companion to the PDC by recording a casual and friendly 40-minute discussion along with demos from her office. This video made a huge difference and began engaging the techie crowd with a good deal more information.

    Simultaneously, JensenH began his new blog. Blogs were the rage among product leaders. Many of us maintained “external blogs”, or blogs that were visible to anyone, something that seemed risky for big companies at the time. Jensen shared his first Office12 posts after his PDC afternoon presentations. The blog was titled, Jensen Harris: An Office User Interface Blog. Portions of his blog can be found on a Microsoft site with a table of contents, but unfortunately Microsoft changed platforms and all the images have been lost. https://docs.microsoft.com/en-us/archive/blogs/jensenh/table-of-contents (individual posts can be found on archive.org).

    JensenH had many talents beyond his obvious software skills and his regular performances with the Seattle Symphony. He was also a fantastic writer, a style he honed while writing a column in high school for USA Today. His posts detailing the Office12 redesign were not only incredibly well executed but ultimately served as a model for how a product could and should engage discussions on building software at scale. Through the course of the remainder of the release, and even today, these posts serve as reference materials for one of the most substantial redesigns Microsoft ever undertook (so far!). While obvious today, the press and reviewers were also following the posts carefully—something we took note of and proactively communicated with them. We never edited, clea…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    36 min
  • 080. Progress From Vision to Beta

    This section tells the story of a plan coming together and the breadth of the release. We did have a bit of a speed bump early on. I was told to align schedules with Windows Longhorn (the next Windows release). The difficult reality of Longhorn had not yet sunk in. The new user interface for Office12 had surprising upsides. While we were confident, we did not know at the time just how positive the changes in Office12 would prove to be.

    Back to 079. Competing Designs, Better Design

    Organizationally, we had become a (relatively) well-oiled machine. Procedurally we knew how to work. We also knew what was required at the high level and individual teams knew how to fill in the details with plans. Writing this all down and communicating to the organization a product vision—the vision for Office12—was the next step.

    Transitioning from Office 2003 to Office12 was happening across more than 2,500 engineers. In every respect we were building a coherent and collaborative plan with little dirt flying and no injuries, as the old MikeMap description of Office went.

    By spring 2004 we had a complete product plan in addition to the user experience redesign described previously. Even with excellence of execution, this was not a lather, rinse, repeat release. Collectively, we learned some lessons from the previous releases. We learned more is not better, and that it was time to rethink, or, as we said in the vision, redefine the user experience. We learned that blindly following the enterprise path could lead to stasis, and in technology failing to innovate or standing still was equivalent to going backwards even when the best customers were telling us of the high costs of change. And finally, we had a firm grasp of how the product was going to evolve beyond document creation—the role of servers, services, email, and more were all important parts of Office12.

    The question was not whether we had a good plan or even if we could execute, but would the results live up to our goals. . .finally. There was also a huge risk to making a big bet on changing the user interface of the product—an incalculable risk. It is the kind of risk you either accept and go for or don’t try at all. Many people inside the company, and even on the team, immediately saw the risk of such a big bet and absolutely wanted to know the risk mitigation plan. There wasn’t one. Any risk mitigation plan would only result in a compromise design, because at every step someone would be saying not to worry, we always have a fallback. Backup plans on big bets have a way of permeating the whole product development process and ultimately deny the resources required to achieve the goals, reduce the appetite for risk, and simultaneously dilute the efforts to achieve the bet itself.

    From my perspective Office12 was all about that opening sentence of the vision document and a single slide shown at the team meeting for the vision. It read, “No More Good Enough,” with a big red circle slash. Surrounding that PowerPoint SmartArt on the slide were reviewer quotes about bloatware and competing with Sun’s free OpenOffice, along with some juicy analyst quotes about technologies that still weren’t going to pan out. It was not that we set out to compete with a free product that had yet to make inroads, but we needed to reset the narrative that Office was complete, old, boring, and, worst of all, bloated. We had to show that there was deep thinking in the product and the paradigm of document creation was ripe for innovation, and by doing that we could demonstrate to the market that productivity tools were not commodities.

    In the conventional wisdom of the day, Office was ripe for disruption. There was a less capable product claiming to be a substitute for less money. We took the initiative, intent on doing the disrupting ourselves and not letting something like OpenOffice, or our old products, do it to us. Not to race ahead, but one thing they don’t tell you about in disruptive theory is that losing to a head-on competitor is almost never what happens. Head-on competitors end up, well, running head-on into the entrenched product and that is exactly what happened with OpenOffice. Google’s future suite would initially make this same mistake, but we were at least a decade before they would begin to address that false start, and three years before even their first release.

    The redesign of the user experience was more than one part of the product or strategy. It was so visible and so potentially disruptive that we knew no other aspects of the release would rise above it, certainly in the initial product reception from beta through release. Managing the team and project knowing this reality was JulieLar’s mission.

    The overarching importance and the inherent risk of the redesign was not lost on the team. We had become accustomed to working together and collaborating. This was the sixth major release of the product and we’d been executing as a single team, not siloes of app teams, for a decade. The team was not fighting the shared redesign effort as much as it was rallying around it. As teams saw the design make it into the product, rather than point out how it might not work and cause it fail to make the point, teams came together to make it better. It wasn’t everyone at first, but over time that was the case. Among thousands there would always be doubters and honest skeptics, but mostly there were legitimate concerns that required more work.

    Success has many siblings and failure is an orphan as the saying goes. Time has certainly reduced the number of doubters across the team and company. Those working on the Ribbon have many stories of people across the rest of Office and Microsoft expressing extreme doubt and risk, but those too have softened over the years as people came to realize the different roles people play during a time of change. Suffice it to say, some of the doubters were hardcore and neither quiet nor necessarily even-handed in criticism. The same could be said of supporters. Anyone going through a big bet with massive downside would need to learn this lesson. It would come in handy for me.

    The product vision process really came together. After the very rough start for Office 2000 followed by the over-correction in Office XP, and then again by another over-correction back to enterprise in Office 2003, we hit stride. The process very much became our culture and defined a new way of building Office. The output of the process, after just a few months of planning, included a robust vision document—the plan—over thirty-five pages containing details for all critical stakeholders. We covered the breadth of the 4 Ps of the marketing mix across product, price, place, and promotion. From a culture perspective we dove deep into the core tenets of the release, the non-debatable points meant to streamline discussion and reduce debate. We did so in a unique Office manner by offering tenets that themselves often contradicted each other. I had a favorite example of that. We had one tenet “Security trumps everything” followed immediately by a tenet “Privacy also trumps everything” which was a clear message to the team to be smart about resolving issues even when they contradict. The goal of the vision was to communicate the product but to also serve as a decision framework—it was not a detailed product specification, intentionally so. The full set of tenets is quoted below.

    Security trumps everything. No feature will be important enough that it justifies exposing our users to malicious code.

    Privacy also trumps everything. Office12 will not compromise…



    This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com
    29 min
  • 079. Competing Designs, Better Design

    A common belief in big companies with resources to spare is that innovation works better when there is a competition between multiple efforts with the same goal. It is a luxury most companies don’t have. If you’ve lived through competing designs, then you also know this is a horrible way to innovate and it is odd that such a process persists. When we began work on the redesign of Office, we wanted to iterate over designs quickly while also making sure we had multiple perspectives. It was not competing designs per se, but it had many of the same tensions. It was only through careful management that we ended up with a better design because we had multiple efforts early on.

    Back to 078. A Tour of “Ye Olde Museum Of Office Past”

    Microsoft always maintained a competitive culture. It started at the top and flowed down from there. Any doubts, ask one of the early morning basketball leaguers who played against SteveB.

    Generally, one place we did not compete was on products. That was wasteful. To be sure, cookie-licking had a way of making it seem like there was competition, but those involved knew the reality. We’d seen IBM intentionally set groups after each other and it was ugly. Back when I was technical assistant, I had a call with an IBM technical assistant (a very different job it turns out) who asked me about how the company managed competing groups “so effectively” he said, and I thought he was speaking a foreign language (later I would realize from his view he thought of OS/2 and Windows as competitive, but we didn’t quite see it that way).

    While competition rarely occurred across groups by building the products that were addressing the same goal, at times it happened accidentally, such as when C# and .NET evolved to bump up against Visual Basic, or even NetDocs taking on email after starting from a word processor. There were also technology transitions resulting in a current and forward-looking product, such as Windows 95 and Windows NT, which was not resolved until Windows XP. Originally Windows NT was a server operating system, but over time it became abundantly clear it was the future general-purpose operating system.

    The Windows competition was painful. It was not particularly secret, but once NT went from a side project to a real product and then to the strategy it is fair to say the competition was difficult on all involved. No one who went through that would ever think about having competitive groups on purpose. At least if we did, we gained lessons in how we might go about it. The resolution of this situation was painful for everyone.

    Microsoft’s culture was to avoid being wasteful of resources or internal energy, and to focus on one solution, getting to market, and iterating to get something right (in three versions or so). As we’ve seen when confronted with intentional redundancy, we typically dealt with it before products got to market. If there was a competition, shipping first was one way to fix it.

    Many companies, like IBM, famously maintained cultures of competition. Often these companies sent two or more groups off to build solutions to a specified problem, frequently unbeknownst to each other, hoping a clearly superior solution emerged. For an engineer, that was an immensely frustrating approach and rarely resulted in a clean win. Executives had a way of looking at competing projects and determining that the best path forward was to remove the negative attributes from both choices and use the good from each. That forced merger of two formerly competing groups usually marked the start of a long, friction-filled journey to market. Worse, tell me the boss of the new merged effort and I could tell you the winning technology. Such was another reason to dislike that approach (incidentally, one thing we got right with the Windows 9x/Windows NT era was in moving code from one to the other).

    The task of redesigning Office to address the challenges described was so high risk and difficult that it seemed sensible to try a few different approaches despite the difficulties of doing so. The questions were how to quickly try multiple designs and if one team could sincerely experiment in an unbiased manner.

    The user interface was one part of Office12. The next section will outline the full scope of the release.

    Julie Larson-Green (JulieLar), leading the UEX (User EXperience) program management team reporting to Antoine Leblond (Antoine), settled on investigating two approaches in parallel. Julie knew she wanted to experiment but was acutely aware we did not have a year to wallow in design alternatives. We shipped Office 2003 at the end of the summer 2003. We needed a couple of months on the engineering side to release worldwide products, refit the engineering process with improvements, and to plan on the next release. The rough schedule called to start coding for Office12 in early spring 2004. Less than six months to have a firm feature list, a robust engineering plan, and above all a new cross-Office design framework for a product used by hundreds of millions of people over the past 15 years. That’s all.

    Julie’s Office 2003 team began iterating with designs before the release finished early in the year. The second design came from members of the team that moved over from Outlook in the late spring 2003. Movement across teams between releases was encouraged and planful, with program management starting moves a couple of months before RTM. Our resource realignment or reorg process was routine at this point and began uneventfully with a memo from me in late May 2003.

    The two groups shared the same hallway with knowledge and awareness of each other, like OneNote and Word previously. JulieLar’s leadership on this project across all of Office would prove immense. Her own evolution as an engineering and product leader set the stage for this project, starting from when we met at a C++ event at Microsoft Press more than a decade earlier, through her growth to leading the engineering team that created Visual Studio (an outgrowth of single-user Visual C++), then on Windows through the chaos of the browser wars, and back to Office to FrontPage and the incubation of SharePoint Team Services, and most recently to the shared user interface team for Office 2003 (then called UIS). While decidedly among the best product leaders at Microsoft, it was her natural skills at bringing teams and people in conflict together that would prove to be the magic behind this risky and complex challenge.

    The two teams were each staffed by very solid product leaders with strong but differing views on the evolution of user interface. The teams started from different constraints or assumptions. Julie aimed to arrive at one clear choice, not a nonexistent mix of two options or a committee compromise. That way the designs and specs could be finalized in time to start coding.

    Few outside of Office fully understood the scope of the product’s thousands of features—the prevailing view was neither could anyone nor did anyone care about all of the features. While we (in Office) could light-heartedly make fun of our 4,000 different commands across five main products, with very few exceptions there were no other products out there that had such a surface area. The only thing that came close was the Adobe suite of products and perhaps Visual Studio, but both of those were used by professionals who were specifically schooled in those products. Even big web sites on the internet were no more complex than the online help for Office. Recall during the most recent redesign of the Office user experience (the introduction of command bars for Office 2000) we had a full-time program manager just keeping track of all the commands, buttons, and keyboard shortcuts. This was a huge redesign, a jumbo-jet cockpit level design.

    The world-wide…