Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

By Keith BontragerBusinessGovernmentNon-Profit
Download on the App Store

Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episodes

  • 3/7/24 - Part 7 - SCCRTC Board Meeting - Legal Services Contract

    (Summary from the RTC's Highlights)

    The Commission approved entering into an agreement with Redwood Public Law, LLP

    (Redwood) for general counsel services by Steve Mattas and his team of transportation

    agency attorneys. Mr. Mattas and his team have provided general and special counsel

    services to the RTC since August 1, 2019. Mr. Mattas and his team are departing their

    previous firm, Meyers Nave, PLC, and joining Redwood. The new agreement will allow Mr.

    Mattas and his team to continue to provide the general and special counsel services they

    currently provide to the RTC. The Commission also approved a one-year extension of the

    Meyers Nave agreement so that the current litigation and labor relations services provided

    by Meyers Nave attorneys will continue to be provided through the end of current matters

    2 min
  • 3/7/24 - Part 6 - SCCRTC Board Meeting - Hwy 1 Auxiliary Lanes and Bus-on-Shoulder Project Construction Update

    (Summary from the RTC's Highlights)

    The Commission received an update on the ongoing construction along Highway 1. Major

    construction activities will begin this month on the Highway 1 State Park to Bay/Porter

    Auxiliary Lanes and Bus-on-Shoulder Project that includes a new bicycle and pedestrian

    overcrossing at Mar Vista Drive and the replacement of the Capitola Avenue overcrossing at

    Highway 1. As the project gets underway, the long-term closure of the Capitola Avenue

    overcrossing is necessary in order to demolish the existing structure and build the new one.

    The Capitola Avenue overcrossing will close to vehicle, bicycle and pedestrian traffic

    beginning on Monday, March 11 at 9:00 a.m., for approximately 14 months. In order to

    demolish the structure, a 24-hour full closure of Highway 1 between the Bay/Porter and Park

    interchanges is necessary. This closure is planned to begin on Saturday, March 23 at 7:00

    p.m. and end on Sunday, March 24 at 7:00 p.m. Staff has prepared a public outreach plan for

    both the long-term Capitola Avenue closure and the 24-hour highway closure that includes

    robust regional and interregional communications

    7 min
  • 3/7/24 - Part 5 - SCCRTC Board Meeting - Aptos Bridge Survey Results Presentation

    (Summary from the RTC's Highlights)

    The Commission received an informational update on the community’s preference between

    two single-span bridge types for the Coastal Rail Trail Segment 12 bicycle and pedestrian

    bridge over Aptos Creek and Soquel Drive. The project originally proposed a three-span

    simple prefabricated bridge. However, the project development team encountered

    challenges with utilities conflicting with the location of the bridge columns and

    recommended a single span, 300-foot- long bridge. Two single-span bridge options were

    considered. The Tied Arch Bridge would be supported by two 300-foot-long curved arches

    with the deck supported below. Its 50-foot-tall arch makes a striking visual statement and

    would be visible from adjacent public and private properties. The Stress Ribbon Bridge

    would be supported by suspension cables within the concrete deck. Its low profile and

    minimalist design would offer a harmonious blend with the environment and would be less

    of a visual statement than the Tied Arch type. In January 2024, the RTC released a short

    video and online survey to solicit input on the community’s bridge preference. The online

    survey had 889 respondents and the results were in favor of the Tied Arch bridge type. The

    Project Development Team is moving forward with the Tied Arch Bridge

    3 min
  • 3/7/24 - Part 3 - SCCRTC Board Meeting - Glydways Presentation

    (Summary from the RTC's Highlights)

    The Commission heard a presentation from Representatives of Glydways, an electric

    autonomous pod car venture, to learn about their transportation technology. Glydways is

    developing a transportation system that would use electric autonomous pod cars to

    transport people. The company is part of a team of consultants who secured a contract with

    the City of San Jose to provide transportation between the San Jose Downtown Diridon

    station and the San Jose Airport. Glydways representatives said the pod cars move in

    dedicated guideways, carrying up to four passengers directly to their destination with no

    stops. According to the Glydways representatives, a pod car system can move up to 10,000

    passengers per hour, have much lower capital expenditure costs than traditional mass

    transit systems, and have significantly lower operating expenses for each passenger mile

    traveled.

    18 min
  • 3/7/24 - Part 2 - SCCRTC Board Meeting - Caltrans Report

    Informational presentation on storm damage in the area (not much), the Climate Action Plan for Transportation Infrastructure (CAPTI) (see link below), some large Safe Streets fro All grants upcoming, and progress on a stalled Rail Trail project in north county. It is now out for bid.

    https://calsta.ca.gov/subject-areas/climate-action-plan

    4 min
  • 2/23/24 - Part 5 - SC Metro Board Meeting - PRESENTATION ON REIMAGINE METRO PHASE II P2 + Questions and Comments

    PRESENTATION ON REIMAGINE METRO PHASE II P2 - Questions and Comments

    John Urgo, Planning and Development Director

    Video is here: https://youtu.be/R0O5P7ffDPg

    The meeting agenda is here:

    https://scmtd.com/images/department/board/archive/agendas/2024/2024.02.23-BOD-Agenda.pdf

    The CommunityTV.org video is here:

    https://www.youtube.com/watch?v=tM79wlvqtdk&list=PLo9N9AsVOVvT_Ae6YrLvf_pJKSTzuuMqX

    25 min
  • 2/23/24 - Part 4 - SC Metro Board Meeting - PRESENTATION ON REIMAGINE METRO PHASE II

    PRESENTATION ON REIMAGINE METRO PHASE II

    John Urgo, Planning and Development Director and Daniel from Jarrett Walker and Associates.

    A fairly weedy discussion of Metro's upcoming service changes.

    The YouTube video has the images and maps discussed in the presentation.

    https://youtu.be/nbHXBYXkTnA

    The meeting agenda is here:

    https://scmtd.com/images/department/board/archive/agendas/2024/2024.02.23-BOD-Agenda.pdf

    The CommunityTV.org video is here:

    https://www.youtube.com/watch?v=tM79wlvqtdk&list=PLo9N9AsVOVvT_Ae6YrLvf_pJKSTzuuMqX

    24 min

About Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

From the publisher's feed

Attending these meetings in person is very time consuming. They are long and there is often quite a bit of administrative business done. Not many people have the time to do it. And, even if you do,…

More shows like Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

The Daily by The New York Times

The Daily

111,845 Listeners