
Sign up to save your podcasts
Or
Finally, on the morning of February 21, all the population of the N1 assembly area and a residential area, situated just south of the launch pad, was ordered to evacuate. The giant service structure then rolled away leaving the dark-gray rocket with a white payload fairing towering under sunny skies. The weather was extremely cold, with temperatures falling to minus 44 C degrees, and stormy winds. In the fortified firing control room, the Commander of the 6th Directorate, took the firing command position at the main periscope…
4.8
126126 ratings
Finally, on the morning of February 21, all the population of the N1 assembly area and a residential area, situated just south of the launch pad, was ordered to evacuate. The giant service structure then rolled away leaving the dark-gray rocket with a white payload fairing towering under sunny skies. The weather was extremely cold, with temperatures falling to minus 44 C degrees, and stormy winds. In the fortified firing control room, the Commander of the 6th Directorate, took the firing command position at the main periscope…
1,344 Listeners
4,357 Listeners
633 Listeners
535 Listeners
1,549 Listeners
4,595 Listeners
223 Listeners
352 Listeners
283 Listeners
1,460 Listeners
3,973 Listeners
1,220 Listeners
12,103 Listeners
885 Listeners
1,330 Listeners