
Sign up to save your podcasts
Or
Finally, on the morning of February 21, all the population of the N1 assembly area and a residential area, situated just south of the launch pad, was ordered to evacuate. The giant service structure then rolled away leaving the dark-gray rocket with a white payload fairing towering under sunny skies. The weather was extremely cold, with temperatures falling to minus 44 C degrees, and stormy winds. In the fortified firing control room, the Commander of the 6th Directorate, took the firing command position at the main periscope…
4.9
127127 ratings
Finally, on the morning of February 21, all the population of the N1 assembly area and a residential area, situated just south of the launch pad, was ordered to evacuate. The giant service structure then rolled away leaving the dark-gray rocket with a white payload fairing towering under sunny skies. The weather was extremely cold, with temperatures falling to minus 44 C degrees, and stormy winds. In the fortified firing control room, the Commander of the 6th Directorate, took the firing command position at the main periscope…
1,983 Listeners
2,866 Listeners
636 Listeners
13,421 Listeners
9,272 Listeners
320 Listeners
284 Listeners
1,235 Listeners
392 Listeners
2,653 Listeners
3,289 Listeners
983 Listeners
398 Listeners
2,300 Listeners