
Sign up to save your podcasts
Or


Based on Podcast App listening data
For now the mighty Saturn V stood empty. But overnight, even while Borman’s crew slept, technicians would ready it for departure. By morning its enormous fuel thanks would be filled with cryogenic propellants, until the rocket would contain the explosive energy of an atomic bomb.
The successful Apollo 7 flight cleared the way for a US moon landing in 1969. Still a lot of flight and ground testing remained and there would probably be surprises. The greatest concern was Nasa had to complete three virtually flawless missions and achieve every major test objective before a lunar landing could be attempted. The odds seemed to be stack against NASA.
Frank Frederick Borman, II was born on March 14, 1928, in Gary, Indiana. He is of German descent, born as the first and only child to parents Edwin and Marjorie Borman. Because he suffered from numerous sinus problems in the cold and damp weather, his father packed up the family and moved to the better climate of Tucson, Arizona, which Borman considers his home town. He started to fly at the age of 15.
Perhaps the most significant point about the lunar-orbit flight proposed for Apollo 8 was that the command and service modules would fly the same route to the moon as would be used for the actual lunar landing.
An ‘A’ type mission would be flown with a Saturn V and be used to test the Launch vehicle, spacecraft, and a high velocity lunar return. Nasa cover the ‘A’ mission with Apollo 4 & 6.
Trouble began on the sixth day of the flight, November 17. The capsule developed an atmospheric leak, the pressure first dropping from 760 to 380 mm of Mercury. With the drop in cabin pressure all the animal test subjects died. It would have killed any Cosmonaut not wearing a spacesuit.
The soviets showed some confidence in their spacecraft by launching the unmanned Soyuz 2 first, but showed some caution by not sending a cosmonaut in Soyuz 2.
CAPCOM Number 1 (Deke Slayton): Okay. I think you ought to clearly understand there is absolutely no experience at all with landing without the helmet on.
SCHIRRA: You’ve added two burns to this flight schedule, and you’ve added a urine water dump; and we have a new vehicle up here, and I can tell you at this point TV will be delayed without any further discussion until after the rendezvous.
Command Service Module-101 started through the manufacturing cycle early in 1966. By July, it had been formed, wired, fitted with subsystems, and made ready for testing. After the Apollo 1 fire in January 1967, changes had to be made, mainly in the wiring, hatch areas, and the forward egress tunnel. It was December before the spacecraft came back into testing. CSM-101 passed through a three-phase customer acceptance review; during the third session, held in Downey on May 7th 1968, no items showed up that might be a “constraint to launch.” North American cleared up what few deficiencies there were (13) and shipped the craft to Kennedy on May 30th 1967…
From the publisher's feed

633 Listeners