
Sign up to save your podcasts
Or


Based on Podcast App listening data
“The primary objective of the first Gemini mission, was to prove that the Titan II was capable of launching the Gemini spacecraft into orbit within the tolerances imposed by manned space flight. The secondary objective was for the spacecraft to gather and report data.”
“Blue Gemini” was the tag name for an Air Force manned space flight program to develop rendezvous, docking, and transfer for military purposes, using Gemini-type spacecraft. The concept became firmer in June, when the Air Force Space Systems Division (SSD) began working on plans to use Gemini hardware as the first step in a new Air Force man-in-space program called Mods (Manned Orbital Development System), a kind of military space station with Gemini spacecraft as ferry vehicles…
On January 3 1962, “Gemini” became the official designation of the Mercury Mark II program. The name had been suggested by Alex Nagy of NASA Headquarters because the twin stars Castor and Pollux in constellation Gemini (the Twins) seemed to him to symbolize the program’s two-man crew, its rendezvous mission, and its relation to Mercury. Coincidentally, the astronomical symbol (II) for Gemini, the third constellation of the zodiac, corresponded neatly to the Mark II designation…
On January 3 1962, “Gemini” became the official designation of the Mercury Mark II program. The name had been suggested by Alex Nagy of NASA Headquarters because the twin stars Castor and Pollux in constellation Gemini (the Twins) seemed to him to symbolize the program’s two-man crew, its rendezvous mission, and its relation to Mercury. Coincidentally, the astronomical symbol (II) for Gemini, the third constellation of the zodiac, corresponded neatly to the Mark II designation…
“The main trouble with the Mercury capsule was that most system components were in the pilot’s cabin; and often, to pack them in this very confined space, they had to be stacked like a layer cake and components of one system had to be scattered about the craft to use all available space. This arrangement generated a maze of interconnecting wires, tubing, and mechanical linkages. To replace one malfunctioning system, other systems had to be disturbed; and then, after the trouble had been corrected, the systems that had been disturbed as well as the malfunctioning system had to be checked out again.” James Chamberlin
This brings us to Project Gemini. Gemini started after Apollo had begun, in part to answer a crucial question for Apollo. Was rendezvous and docking in orbit a feasible basis for a manned lunar landing mission?
Mariner 4’s primary objective was to conduct closeup scientific observations of Mars and to transmit these observations to Earth. Additional goals included performing field and particle measurements in interplanetary space, and providing experience and knowledge of engineering capabilities for interplanetary flights of long duration…
From the Control center Yuri Gagarin’s kept the crew informed on everything taking place on the now deserted launching site. Finally the command was given: “Stand by!” Now, It would be a matter or minutes before the launch. Commands followed in quick succession. The flight recorder was switched on, the engines started up. There was not much noise at first. But, after the command “Main Engine” the noise and the vibration grew stronger. The final command came at 07:30 UT “Start!”
Premiere Khrushchev was not willing to wait until Soyuz for another space first. Khrushchev believed, There could be no final victories in the race for space propaganda. He knew the US was working on project Gemini which would carry two astronauts in 1965. So, as a means to upstage the US, Khrushchev ordered Chief Designer Korolev to fit three cosmonauts into the Voskhod spacecraft that was designed for two…
You may recall from episode 32 Ranger- 4 was the first U.S. spacecraft to reach another celestial body. However, Ranger-4 failed it primary mission of returning pictures from the moon…
From the publisher's feed

633 Listeners