In this Grid News and Views episode of the Connectology® Podcast, Roadnight Taylor's Pete Aston hosts colleagues Nikki Pillinger, Philip Bale and Kyle Murchie as they discuss National Grid ESO and the DNOs' progress with the Technical Limits initiative, and:
How valid is the data behind your DNO curtailment assessment?The milestones calculator for transmission-connecting projects The migration of the Electricity System Operator (ESO) to the National Energy System Operator (NESO)The consultation on the change in threshold for Large GeneratorsThe risks to developers/investors of the use by network operators of sustained ratings vs cyclic ratings in modelling and operating ANM schemesThe NGESO consultation on market mechanisms to unblock transmission-level thermal constraints to demand and generationThe ESO's 'Technical Solution 2' for enabling battery connectionsThe lack of a route for accelerating demand connections caught up in transmission-level constraints The proposed Regional Energy Strategic PlannersRecorded 01 February 2024
This content was recorded on an earlier date. The connections landscape changes rapidly, so please treat any facts, figures, and guidance as a point-in-time view and verify current information before relying on it.
Website: https://roadnighttaylor.co.uk/
Newsletter sign up: https://roadnighttaylor.co.uk/newsletter/
Follow us on LinkedIn: https://www.linkedin.com/company/roadnight-taylor-ltd/
Find if we fit at [email protected]