  • Ep 7: Collaboration, Design, and the Story of Engineers

    Collaboration, Design, and the Story of Engineers

    Episode 7: Stacey Root & Gary Hamilton

    Design is a team sport. Not just between architects and their clients, but between the disciplines that have to turn a vision into a building that actually works. The architect is shaping space. The mechanical engineer is shaping the systems inside that space. And those two things have to fit together, literally, inside the same ceiling, on the same budget, on the same timeline.

    In this episode, Stacey Root, healthcare architect and practice lead, and Gary Hamilton, mechanical engineer and Senior Vice President, get into what that relationship actually looks like: how decisions get made, where the friction shows up, and what it means for the contractors and owners who inherit those decisions downstream.

    This is the design production episode. We have talked about research, procurement, and front end planning. Now we are inside the process itself.

    What you will learn:

    • How architecture and MEP engineering fee structures shape the decisions that get made long before a contractor sees a drawing
    • Why the coordination between disciplines often starts later than it should, and what that costs
    • What good collaboration between architecture and engineering actually looks like in practice, and how it shows up in the building itself
    • How sustainability commitments get made, and where they quietly fall apart when budget pressure arrives
    • What owners and contractors often do not see happening during design, and what they should be asking
    • Timestamps:

      • 0:10 — Intro
      • 1:09 — Episode begins
      • 1:09 — Gary Hamilton: background, from civil to mechanical, Jamaica to Trinidad to the UK
      • 5:50 — Stacey Root: the dinner party story, what architects actually do
      • 10:17 — Stacey on what actually makes a difference in a design career
      • 12:21 — Gary on not being a traditional engineer and the power of listening first
      • 13:50 — How integrated project delivery changes the relationship between disciplines
      • 15:41 — What the industry gets wrong about trade partners
      • 18:03 — Design bid build vs. collaborative delivery, and what changes about coordination
      • 21:21 — Equipment changes mid-design: why design freeze almost never actually happens
      • 23:35 — How design consultants help each other with design challenges
      • 27:34 — Why hiring the commissioning agent first is one of the smartest things an owner can do
      • 32:26 — Where architecture and MEP actually collide: ceiling heights, ductwork, and the two inches that change a patient's experience
      • 37:47 — What would surprise an owner if they sat in on a design coordination meeting
      • 40:22 — The facilities rep problem: why the people who operate buildings are often the hardest to design for
      • 44:51 — Sustainability ROI and the 3, 5, and 7-year hard stops that shape what actually gets built
      • 50:06 — How design fees actually work: top-down vs. bottom-up, and what the numbers mean for the quality of the work
      • 54:53 — When the owner adds a floor mid-design: the Rolls-Royce vs. Honda Accord story
      • 55:55 — Disclaimer
      • Guests:

        Stacey Root, AIA, Practice Lead, Canon Design: https://www.linkedin.com/in/staceymroot/
        Gary Hamilton, PE, Senior Vice President, Introba: https://www.linkedin.com/in/garoldhamilton/

        Referenced Terms and Resources

        OPR (Owner's Project Requirements)

        A written document that details the functional requirements of a project and the owner's expectations for how it will be used and operated, including project goals, measurable performance criteria, cost considerations, benchmarks, and success criteria. The OPR is most effective when developed during pre-design and serves as a living reference throughout the project lifecycle.

        Learn more: AIA: A Problem Well Stated: Owner Project Requirements

        CXA (Commissioning Authority)

        An independent third party hired directly by the owner to verify that building systems perform as intended. Per ASHRAE Guideline 0-2019, the CXA must be independent of the project team, with their contract and reporting line running directly to the owner, giving them the authority to identify deficiencies and challenge design decisions without commercial conflict.

        Learn more: Commissioning Manager: What Is a Commissioning Authority?

        Referenced Episodes
        • Episode 2: Dr. Ed Gibson on front-end planning and pre-project planning
        • Episode 3: James Pease and Howard Ashcraft on contracting, procurement, and delivery methods
        • Episode 5 and 6: Stacey Root and Kati Peditto on evidence-based design and design research
        • 57 min
        • Design Waste

          Design Waste: The Difference Between Exploration and Rework

          Not all design iteration is waste. But some of it absolutely is. In this solo episode, Sean breaks down the difference between exploratory iteration that generates value and rework driven by decisions that should have been made before design started.

          Topics covered:

          • Glenn Ballard's positive versus negative iteration framework and why it matters for every capital project
          • The MacLeamy Curve and what it actually implies beyond BIM and IPD
          • Why organizational readiness is a leadership question, not a design question
          • What a structured chartering session actually does for a project team
          • Why mockups and simulation keep getting cut in value engineering, and what the research says about that decision
          • Sources

            Ballard, G. (2000). Positive vs. Negative Iteration in Design. Proceedings of the 8th Annual Conference of the International Group for Lean Construction (IGLC-8). Brighton, UK.

            Koskela, L. (1992). Application of the New Production Philosophy to Construction. Technical Report No. 72. Center for Integrated Facility Engineering, Stanford University.

            Cho, C.S. and Gibson, G.E. (2001). Building project scope definition using project definition rating index. Journal of Architectural Engineering, 7(4), 115-125. ASCE.

            Weiner, B.J., Amick, H. and Lee, S.Y. (2008). Conceptualization and measurement of organizational readiness for change. Medical Care Research and Review, 65(4), 379-436.

            Holt, D.T., Armenakis, A.A., Feild, H.S. and Harris, S.G. (2007). Readiness for organizational change. Journal of Applied Behavioral Science, 43(2), 232-255.

            MacLeamy, P. (2004). Collaboration, Integrated Information and the Project Lifecycle in Building Design, Construction and Operation. Construction Users Roundtable White Paper WP-1202.

            Construction Industry Institute. Front End Planning Best Practice. University of Texas at Austin.

            18 min
          • Ep 6: The Evidence Gap with Kati Peditto and Stacey Root

            There is a gap between what design teams know about human behavior and what actually ends up in a building. Research exists. Tools exist. The problem is getting evidence into the process before it is too late to act on it. In this episode, design researcher Kati Peditto and architect Stacey Root dig into how that gap closes.

            GUESTS

            Kati Peditto is Principal Researcher at Built Experience Lab, where she studies and consults on the intersection of human behavior and the built environment. With a PhD in human behavior and design, Kati has worked across healthcare, K-12, and higher education projects at multiple firms, bringing research into the design process at every phase from pre-design through post-occupancy. Her work focuses on turning evidence into design decisions that produce measurable outcomes for patients, staff, students, and communities.

            LinkedIn: https://www.linkedin.com/in/katipeditto/

            Stacey Root is Health Practice Leader for the Denver Office of Cannon Design, with deep experience in healthcare architecture, IPD, and design-build delivery. Stacey returns to the conversation to offer the practitioner's perspective on how research integrates with the realities of project teams, budgets, and client expectations.

            LinkedIn: https://www.linkedin.com/in/staceymroot/

            IN THIS EPISODE

            • Why evidence-based design is not about finding articles that validate decisions already made, and what real evidence actually looks like on a project
            • How design researchers work across pre-design, schematic design, and design development, and why post-occupancy evaluation only works when research starts at the beginning
            • Why research fees get cut from project budgets even when the return on investment is documented, and what it would take to change that
            • How real-time research methods are beginning to replace the pause-and-study model, and what that means for how design teams make decisions under pressure
            • What happens to the cognitive health of designers when budgets are tight, schedules are compressed, and competing priorities never stop
            • Why healthcare led the adoption of evidence-based design, and where K-12 and higher education are catching up
            • TIMESTAMPS

              00:00 - Introductions and what brought Kati and Stacey into this conversation

              01:48 - Kati's background: why a PhD in human behavior landed her in architecture, not a lab
              04:36 - The difference between evidence-based design as a marketing term and as an actual practice
              06:02 - How architects and researchers work together without getting in each other's way
              09:12 - Why every evidence-based design conversation eventually comes back to ROI
              09:44 - What a research scope looks like across pre-design, schematic design, and design development
              12:03 - Owner timelines and the pressure to compress the front end before research can do its job
              13:40 - Researching in real time: why the linear model of study-then-design is giving way to something faster
              17:29 - What it would take to connect visioning session data directly to real-time design decisions
              18:01 - The owner's role in enabling research and why pulling clinical staff off the floor is the real obstacle
              21:28 - The long view: why operational costs over a 50-year building life dwarf pre-project planning and design costs, and why owners still struggle to get there
              22:43 - Why healthcare adopted evidence-based design first and where K-12 is now following the same path
              24:38 - A current project: a vulnerable California school district and what a post-occupancy study reveals about design decisions made years earlier
              27:49 - How to scope a research plan when the options range from cortisol studies to something a school board will actually approve
              33:00 - What architecture schools are not teaching designers about cognitive load and task switching under pressure
              45:13 - The cognitive health of design teams: what Stacey's office is actually doing about it, not just talking about it
              51:30 - Why leadership has to be the one to break the cycle when neither the client nor the firm will

              RESOURCES MENTIONED

              • Evidence-based design: a framework for informing design decisions through research, lived experience, stakeholder engagement, and measurable outcomes. Grew from evidence-based medicine and is most developed in healthcare design. Learn more at the Center for Health Design: www.healthdesign.org
              • HCAHPS (Hospital Consumer Assessment of Healthcare Providers and Systems): a national, standardized, publicly reported survey of patients' perspectives of hospital care, developed by CMS and AHRQ. Referenced in the episode as an example of owner-side outcome metrics that evidence-based design directly influences. Since 2012, HCAHPS scores have played a role in hospital payment through the Hospital Value-Based Purchasing program. Learn more: www.cms.gov/medicare/quality/initiatives/hospital-quality-initiative/hcahps-patients-perspectives-care-survey
              • AIA Framework for Design Excellence: a ten-principle framework defining design excellence in the 21st century, including a dedicated principle for well-being that addresses physical, mental, and emotional effects of design on occupants and communities. Referenced in the episode in the context of health and wellbeing goals that appear in firm frameworks but are not always reflected in curriculum or fee structures. Learn more: www.aia.org/design-excellence/aia-framework-for-design-excellence/well-being
              • Kati Peditto's evidence-based design newsletter (free): https://newsletter.katipeditto.com/
              • WHERE TO FIND KATI

                LinkedIn: https://www.linkedin.com/in/katipeditto/

                Newsletter: https://newsletter.katipeditto.com/

                WHERE TO FIND STACEY

                LinkedIn: https://www.linkedin.com/in/staceymroot/

                Cannon Design: https://www.cannondesign.com

                55 min
              • Ep 5: Filling in the White Space with Stacey Root

                There is a common assumption that an architect is handed a business plan and disappears for six months before reappearing with a finished set of drawings. The actual process is messier, slower, and far more human than that. In this episode, Stacey Root walks through what design really looks like from the inside: the rework nobody plans for, the gap between a sketch and a finished room, and why the best architects describe themselves as "orchestrators" rather than "designers".

                GUEST

                Stacey Root is Health Practice Leader with deep experience in healthcare architecture, IPD, and design-build delivery. Stacey brings a practitioner's candor to what the design process actually involves, the costs of rework, and what it takes to build trust on a project team.

                LinkedIn: https://www.linkedin.com/in/staceymroot/

                IN THIS EPISODE

                • Why Stacey describes herself as an orchestrator rather than a designer, and what that distinction means for how she builds project teams
                • How some firms use data analysis to remove ambiguity from early decisions before the design team is ever handed the problem
                • Why rework is the most frustrating part of the design process, and the difference between productive iteration and waste
                • What actually happens during schematic design, design development, and construction documents, and why pricing usually arrives too late to prevent surprises
                • Why bringing the contractor in early changes the kind of input they can offer, and why bringing them in late costs the project more than people realize
                • A stucco building in Utah that turned a tight design-build budget into one of Stacey's favorite project stories, and a Colorado project that went a half-million dollars over budget because no one spoke up soon enough
                • TIMESTAMPS

                  00:00 - Stacey's path to architecture, and why her childhood aptitude test said firefighter

                  01:38 - Why Stacey calls herself an orchestrator, not a designer
                  04:37 - The harder parts of the job: assembling the right people in the right seats
                  07:14 - Rework: the most frustrating and most common waste in the design process
                  09:01 - How data analysis can help bridge the gap between strategy and design
                  11:02 - Walking through the design process: schematic design, DDs, and construction documents
                  17:08 - Why bringing a contractor in late limits the value of their input
                  22:15 - Generalist or specialist: how Stacey balances competing priorities across a project team
                  23:50 - The Utah hospital project: a stucco budget turned into a design challenge worth celebrating
                  28:38 - A counterpoint: a Colorado project that ended up significantly over budget, and what Stacey wishes she had said sooner
                  30:40 - Advice to her younger self and to project teams: ask more questions, and build a culture where people feel safe doing it
                  33:06 - The lesson Stacey would give her younger self about not needing to fit a mold

                  RESOURCES MENTIONED

                  • AIA Document B101, Standard Form of Agreement Between Owner and Architect: defines the five phases of basic architectural services referenced in this episode (schematic design, design development, construction documents, procurement, and construction)
                  • WHERE TO FIND STACEY

                    LinkedIn: https://www.linkedin.com/in/staceymroot/

                    Canon Design: https://www.cannondesign.com/

                    37 min
                  • Ep 4: Before the First Drawing with Stacey Root and Chad Kruse

                    The moment a project moves from conception into design, something shifts. The owner's questions change, the team changes, and the leadership required to hold it all together changes. Most projects never acknowledge that transition out loud. This episode is about what happens when you do.

                    GUESTS

                    Stacey Root is Health Practice Leader for the Denver Office of Canon Design, with deep experience in IPD, design-build, and complex healthcare projects. Stacey brings a practitioner's honesty to what onboarding actually looks like from the design side, and what owners rarely understand about the process they are putting teams through.

                    LinkedIn: https://www.linkedin.com/in/staceymroot/

                    Chad Kruse is Executive Director and Project Advisor at Nebraska Medicine, where he provides business support for strategic and campus planning. Chad joins as co-host throughout the series, offering the owner's perspective as the conversation moves from concept to concrete.

                    LinkedIn: https://www.linkedin.com/in/chad-kruse-6714b47/

                    IN THIS EPISODE

                    • Why owners often answer the question of what before they have answered the question of why, and what that costs once design begins
                    • How some design firms are embedding strategy and data analysis upstream of architecture to help owners arrive at design ready, not just willing
                    • Why bringing designers on too early can be just as damaging as bringing them on too late, and what the right timing actually looks like
                    • What the RFP process does well, what it fails to do, and why both owners and designers are complicit in a process neither side thinks is working
                    • How the best owners structure selection around team chemistry and problem-solving rather than page counts and project resumes
                    • Why chartering works on paper and fails in practice, and what it actually takes to hold a team to what it agreed to in that room
                    • TIMESTAMPS

                      00:00 - Introduction: when leadership changes hands and no one says so

                      01:50 - Stacey's introduction and what her real job description actually is

                      03:35 - The most common misunderstanding between owners and designers at project launch

                      05:22 - Brought on too early, too late, or just right: what timing looks like from the design side

                      07:10 - How Canon's Blue Cottage team works upstream of architecture to ground projects in data

                      09:16 - Why owners answer what before they answer why, and what that costs in design

                      11:04 - When smaller owners rely on their designers to fill the strategy gap

                      13:43 - Is there value in bringing designers into ambiguity, or does it just slow things down

                      15:00 - The RFP process: what it is supposed to do and what it actually does

                      16:27 - Stacey's 80-page response, 50-minute interview, and what that signals about how owners decide

                      18:55 - How one owner ran a work session instead of a pony show and what the team learned

                      20:29 - Chad on running two procurement processes simultaneously and why he weights interviews at 70%

                      26:07 - Selecting teams instead of firms: why Chad asks designers and builders to come as a package

                      31:29 - Chartering: what it looks like when it works and why it almost never does

                      35:28 - Why owners think they are giving context when they are actually giving ambiguity

                      37:38 - What happens when the owner preaches collaboration and then does not behave it

                      39:32 - Why the owner's representative in the room is the difference between IPD and theater

                      41:00 - The owner's role is not to have all the answers; it is to hold the team accountable

                      RESOURCES MENTIONED

                      • Canon Design Blue Cottage: strategic advisory and data analysis arm of Canon Design, referenced in the context of upstream owner strategy work
                      • Owner Project Requirements (OPR): referenced by Chad as a foundational document that most projects launch without
                      • Gallup CliftonStrengths: referenced by Chad in the context of team selection and understanding how people are wired
                      • IPD chartering process: referenced throughout as both a best practice and a commonly misapplied one
                      • WHERE TO FIND STACEY

                        LinkedIn: https://www.linkedin.com/in/staceymroot/ Canon Design: https://www.canondesign.com

                        52 min
                      • Ep 3: No Perfect Answer with Chad Kruse, James Peace, Howard Ashcroft

                        Every owner eventually has to choose a delivery method. Design-bid-build, CM at risk, design-build, IPD. On paper they all promise something different. In practice, the choice ripples through every decision that follows: the team, the risk, the contingency, the contract, and ultimately whether the project succeeds or fails. In this episode, two of the most experienced practitioners in collaborative project delivery break down what owners get right, what they get wrong, and why the contract is never the solution, only the enabler.

                        GUESTS

                        Howard Ashcraft is a Partner at Hanson Bridgett LLP and one of the leading construction attorneys in the country on project delivery and integrated project delivery. He has structured 150 to 180 pure IPD projects over his career and was among the first practitioners involved in developing what became lean integrated project delivery. He is a Fellow of both the American College and Canadian College of Construction Lawyers, a member of the National Academy of Construction, an Associate Fellow at the Said Business School at Oxford, and the author of a forthcoming book on contracting for integrated project delivery to be published by Wiley in 2026.

                        LinkedIn: https://www.linkedin.com/in/howard-ashcraft-7485178/

                        James Pease is Vice President of Health Major Capital Projects at UCSF Health, where he is currently leading a $7 billion-plus program including a $4.5 billion adult hospital expansion and a $1.62 billion children's hospital expansion, both using integrated project delivery. He has delivered more than $8 billion in complex healthcare projects across his career and has worked on more than 25 IPD projects. He is also the founder and executive editor of leanipd.com, a practitioner-focused resource on lean and integrated project delivery.

                        LinkedIn: https://www.linkedin.com/in/jamespease/

                        Chad Kruse is Executive Director and Project Advisor at Nebraska Medicine, where he provides business support for strategic and campus planning. Chad joins as co-host throughout the series, offering the owner's perspective as the conversation moves from concept to concrete.

                        LinkedIn: https://www.linkedin.com/in/chad-kruse-6714b47/

                        WHAT YOU WILL LEARN

                        • Why design-bid-build makes perfect sense until you have actually worked in design and construction, and what the data says about final project cost versus bid price
                        • How to match delivery method to project type, owner capability, and the likelihood of scope change during execution
                        • Why the contract is an enabler and not a solution, and what happens to collaborative projects when things go sideways under a traditional contract
                        • How owner resource requirements differ dramatically across delivery models, and why IPD front-loads people rather than back-loading them
                        • How contingency works differently in fragmented versus collaborative delivery, and why shared project contingency changes team behavior
                        • Why risk cannot be transferred through a contract and what actually happens to risk when you try
                        • TIMESTAMPS

                          • 00:00 - Introduction and framing the delivery method decision
                          • 02:21 - Howard's background: 150 to 180 IPD projects and why project delivery became his focus
                          • 03:40 - James's background: $8 billion in healthcare delivery and the leanipd.com resource
                          • 05:01 - Why design-bid-build makes sense on paper and falls apart in practice
                          • 09:45 - How project complexity and likelihood of change should drive delivery method selection
                          • 11:52 - Owner resource requirements: how delivery method shapes team size from start to finish
                          • 15:17 - More people upfront, fewer at the end: James on IPD staffing at UCSF
                          • 20:45 - How to phase team onboarding and avoid bringing partners on before you need them
                          • 23:37 - The Brooks Act, the Spearin doctrine, and how procurement law affects collaborative delivery
                          • 25:59 - Public versus private procurement rules and why Canada has more IPD public projects than the US
                          • 28:33 - How owners ensure competitive pricing in negotiated contracts
                          • 32:36 - Why James uses all delivery models at UCSF, and what drives the selection on each project
                          • 36:34 - Contingency: how it works in fragmented delivery versus collaborative delivery
                          • 39:13 - The risk register as a secret weapon versus a shared tool, depending on delivery model
                          • 43:40 - Can contracts actually transfer risk, or does risk just move to the least capitalized party
                          • 47:50 - Parting shots: what owners need to understand first before choosing any delivery method
                          • RESOURCES MENTIONED

                            • Ashcraft, H. (forthcoming 2026). Contracting for Integrated Project Delivery. Wiley.
                            • leanipd.com - James Pease's practitioner resource on lean and integrated project delivery
                            • The Spearin Doctrine: United States v. Spearin, 248 U.S. 132 (1918)
                            • The Brooks Act: governing quality-based selection of design professionals on federal projects
                            • Kingston Third Crossing, Ontario, Canada: referenced as an example of mid-project design adaptation under a collaborative delivery model
                            • WHERE TO FIND HOWARD

                              LinkedIn: https://www.linkedin.com/in/howard-ashcraft-7485178/ Hanson Bridgett LLP: https://www.hansonbridgett.com

                              WHERE TO FIND JAMES

                              LinkedIn: https://www.linkedin.com/in/jamespease/ Lean IPD: https://www.leanipd.com

                              51 min
                            • Ep 2: Front-End Planning and Why It's Failing with Dr. Ed Gibson and Mr. Chad Kruse

                              Front-end planning has been studied for decades. The data is clear, the tools exist, and the ROI is documented across more than 1,300 projects and $100 billion in capital work. And yet the industry is getting worse at it, not better. In this episode, we talk to the researcher who helped build the evidence base, and ask why none of it seems to stick.

                              GUESTS

                              Dr. Ed Gibson is President and CEO of the National Academy of Construction and Professor Emeritus at Arizona State University. A civil engineer by training, Ed has spent more than three decades researching front-end planning and capital project performance. His work through the Construction Industry Institute helped develop foundational tools including PDRI, the Project Definition Rating Index, now used on projects across every major sector. If you have ever used the term front-end planning instead of pre-project planning, there is a good chance Ed's research influenced why.

                              LinkedIn: https://www.linkedin.com/in/g-edward-gibson-jr-pe-phd-dist-m-asce-nac-600b9128/

                              Chad Kruse is Executive Director and Project Advisor at Nebraska Medicine, where he provides business support for strategic and campus planning. Chad joins as co-host throughout the series, offering the owner's perspective as the conversation moves from concept to concrete.

                              LinkedIn: https://www.linkedin.com/in/chad-kruse-6714b47/

                              WHAT YOU WILL LEARN

                              • Why the industry is performing worse at front-end planning today than it was 30 years ago, and what specifically drove that decline
                              • The three phases of front-end planning and what a mature scope actually means before a project moves into execution
                              • Why the best time to kill a project is during planning, and how good front-end work makes that decision possible
                              • What PDRI measures, how it is commonly misused, and why the discussion it generates matters more than the score
                              • Why front-end planning went from 90% technical to 90% people in Ed's view over his career
                              • How to staff a planning team, why new graduates should never lead planning work, and what experience profile actually predicts success in the owner's seat
                              • TIMESTAMPS

                                • 00:00 - Introduction
                                • 01:47 - What the National Academy of Construction is and why it exists
                                • 04:34 - Why front-end planning is getting worse, not better, and what COVID accelerated
                                • 07:05 - Slow trigger, fast bullet: why speed at the front creates delay at the back
                                • 11:33 - The three phases of front-end planning: initiation, concept, and detailed scoping
                                • 14:55 - Mercedes appetite, Volkswagen budget: scope creep and where it actually starts
                                • 17:16 - Why keeping end users out of planning backfires every time
                                • 25:45 - How to get the right stakeholders in the room without sinking the process
                                • 27:40 - Front-end planning as both art and science: form versus function
                                • 33:53 - PDRI: what it is, how it works, and why the conversation it generates is the real value
                                • 46:17 - How to build and train an owner's planning team from the ground up
                                • 52:50 - Ed's five things you need to know about front-end planning
                                • 56:16 - Why Ed reversed his view: from 90% technical to 90% people
                                • RESOURCES MENTIONED

                                  • Gibson, G.E., Wang, Y., Cho, C., and Pappas, M. (2006). "What is preproject planning, anyway?" Journal of Management in Engineering, Vol. 22, No. 1, pp. 35-42.
                                  • Ed Gibson's research on front-end planning performance: approximately 1,300 projects representing over $100 billion in capital work, conducted through the Construction Industry Institute
                                  • PDRI, Project Definition Rating Index (Construction Industry Institute): construction-institute.org
                                  • National Academy of Construction: naocon.org
                                  • Gallup CliftonStrengths
                                  • WHERE TO FIND ED

                                    LinkedIn: https://www.linkedin.com/in/g-edward-gibson-jr-pe-phd-dist-m-asce-nac-600b9128/ National Academy of Construction: https://www.naocon.org

                                    1 hr 2 min
                                  • Ep 1: The Owner's Role with Chad Kruse

                                    Nobody wakes up wanting to be an owner. But the owner's seat might be the most consequential seat in design and construction, and it is the least understood. In this first episode, we start where every project starts: with the person who has to hold it all together before anyone else is even in the room.

                                    GUEST

                                    Chad Kruse is Executive Director and Project Advisor at Nebraska Medicine, where he provides business support for strategic and campus planning across one of the country's major academic medical centers. With 25 years in the industry spanning general contracting, design firms, and owner roles, Chad brings a perspective that is equal parts operational and deeply human. He is one of the clearest thinkers in the business on what it actually means to lead from the owner's seat.

                                    LinkedIn: https://www.linkedin.com/in/chad-kruse-6714b47/

                                    WHAT YOU WILL LEARN

                                    • Why the owner's role is consistently underestimated and what genuine owner leadership actually looks like in practice
                                    • How the pressure to move fast at the start of a project creates problems that no amount of good design or construction can fix later
                                    • Why picking the right team has more to do with people than brands, and how Chad approaches that decision under time pressure
                                    • How front-end planning works at the project level, and why you cannot rush or replicate that time
                                    • What procurement and contracting choices signal about an owner's priorities before a single drawing is made
                                    • Why Chad's institution pursued IPD, what surprised them when they got into it, and what integration actually looks like when it stops being a philosophy and becomes daily behavior
                                    • TIMESTAMPS

                                      • 00:00 - Introduction and what this podcast is trying to do
                                      • 03:29 - Chad's background, from GC to owner, and why he keeps coming back
                                      • 07:21 - What a good owner actually looks like and the stewardship mindset
                                      • 09:30 - The convergence challenge: clinical, operational, financial, and design, all at once
                                      • 13:25 - Why you cannot fast-forward front-end planning, at the project or career level
                                      • 17:46 - A real $30M project that started with a phone call and what made it work
                                      • 19:50 - How procurement and contracting decisions shape everything downstream
                                      • 22:13 - Why owners need sociology more than technical expertise
                                      • 27:37 - Picking teams: people over brands, and what that looks like under pressure
                                      • 32:26 - Staying ahead of how the industry is changing
                                      • 34:03 - IPD in practice: what Chad's institution learned going through it for the first time
                                      • 39:39 - Advice for anyone who wants to get into the owner's role
                                      • RESOURCES MENTIONED

                                        • Gallup CliftonStrengths
                                        • National Academy of Construction
                                        • WHERE TO FIND CHAD

                                          • LinkedIn: https://www.linkedin.com/in/chad-kruse-6714b47/ Nebraska Medicine: https://www.nebraskamed.com
                                          • 48 min