The Wilder Planning & Zoning Commission met on November 24, 2025, and began by approving the minutes from the previous meeting. Staff provided an update on a prior zoning matter, noting that City Council postponed action due to new information from the Kentucky Transportation Cabinet regarding the long-discussed connector road between NKU and Johns Hill Road. Construction on the road is now expected to begin in summer 2026, so Council will revisit the zoning request after the start of the new year.
The first major item on the agenda was a redevelopment proposal from United Dairy Farmers (UDF). Representatives presented plans for a complete teardown and rebuild of the existing store at Mook Road and Licking Pike. The new layout will reorient the building, expand the interior space, and increase the number of fuel positions from six to twelve. Updated food service options and modernized site features are included, along with underground stormwater detention. A required traffic study is underway, and it is likely the Licking Pike access will be restricted to right-in/right-out. Although the project conflicts with several Town Center zoning standards—such as prohibitions on fuel dispensing, flat roofs, and limits on impervious surface—the commission determined these would be treated as allowable continuations of existing nonconforming conditions. After discussion, the commission approved the Stage 1 and 2 development plans with the necessary variances.
The commission then reviewed the site plan for a proposed High Profile medical cannabis dispensary by C3 Industries on Country Drive. This project involves constructing a new 3,000-square-foot building with a drive-through pickup window for pre-ordered medical cannabis products. The applicant discussed coordination with utility providers, including plans to install a new six-inch water main and finalize stormwater routing options in cooperation with SD1. The site’s flat topography and existing drainage features will require careful grading and design adjustments. The business will operate under strict state medical cannabis regulations, with security measures, controlled access, and patient-only sales based on medical cards. Hours of operation are expected to be 8 a.m. to 8 p.m., seven days a week. After discussion, the commission approved the Stage 1 and 2 plans with the condition that the project comply with all SD1 stormwater requirements.
The meeting concluded with recognition of a long-serving member who was retiring after 57 years of service. With no further business, the meeting was adjourned.
Disclaimer: This summary was generated using AI.