
Sign up to save your podcasts
Or
With a £100bn capital spending plan, the biggest ever investment in new transport infrastructure and a ten-point plan for climate change, the UK is determined to build its way to post COVID19 economic recovery. The bad news is that major projects have a terrible track record for not being built on time and going over...
The post #86 Enterprise Delivery: A Model for Recovery first appeared on Engineering Matters.
4.5
88 ratings
With a £100bn capital spending plan, the biggest ever investment in new transport infrastructure and a ten-point plan for climate change, the UK is determined to build its way to post COVID19 economic recovery. The bad news is that major projects have a terrible track record for not being built on time and going over...
The post #86 Enterprise Delivery: A Model for Recovery first appeared on Engineering Matters.
412 Listeners
345 Listeners
56 Listeners
236 Listeners
72 Listeners
353 Listeners
396 Listeners
38 Listeners
4,642 Listeners
314 Listeners
474 Listeners
322 Listeners
116 Listeners
86 Listeners