Calculating the existing service is critical to adding new loads. Taking amp meter readings is only a snap shot in time. Now, following 220.87 is an option and other than an actual load calculation is the only option.

So, you need demand data for 1 year. Now, their is an exception for 30 day, 15 minute peak data to be used.

So, you take the max demand load provided and multiply it by 125% plus the new loads and it is not to exceed the existing service or feeder rating. In Lexi's case it did so it means that 220.87 was ONLY to be used to determine if the existing service can be used....

Since it can't a NEW load calculation on the entire building is required and you DO NOT use the values given by the utility.

Become a supporter of this podcast: https://www.spreaker.com/podcast/ask-paul-national-electrical-code--4971115/support.
...more
View all episodesView all episodes
Download on the App Store

Ask Paul | National Electrical CodeBy Paul W. Abernathy

  • 4.3
  • 4.3
  • 4.3
  • 4.3
  • 4.3

4.3

13 ratings


More shows like Ask Paul | National Electrical Code

View all
REAL AF with Andy Frisella by Andy Frisella #100to0

REAL AF with Andy Frisella

32,728 Listeners

This Past Weekend w/ Theo Von by Theo Von

This Past Weekend w/ Theo Von

27,877 Listeners

Code Talk by Frank Seiler

Code Talk

11 Listeners

ELECTRIFY™ | Electrician Podcast by Paul W. Abernathy

ELECTRIFY™ | Electrician Podcast

28 Listeners

Electrician U by Electrician U

Electrician U

72 Listeners

CreepCast by Wendigoon & MeatCanyon

CreepCast

7,801 Listeners

The Young Electrician Podcast by Ruben Young

The Young Electrician Podcast

7 Listeners