Company Interviews

Company Interviews

Download on the App Store

All Company Interviews episodes

  • Radisson Mining (TSXV:RDS) - Agnico Eagle C$57 Funding Backs O'Brien as Drilling Continues

    Interview with Matt Manson, President & CEO of Radisson Mining Resources Inc.

    Our previous interview: https://www.cruxinvestor.com/posts/radisson-mining-tsxvrds-obrien-82-gold-resource-growth-drilling-continues-high-success-rate-10919

    Recording date: 22nd Sept 2026

    Radisson Mining Resources Inc. (TSXV:RDS) has secured a strategic anchor shareholder while keeping its exploration programme funded. Agnico Eagle Mines Limited bought 53,420,000 units at C$1.07, raising C$57,159,400 and taking about 10.45% of the common shares. Half a warrant per unit would lift its stake to about 14.90% on a partially diluted basis if exercised. The placement remains subject to final TSX Venture Exchange acceptance.

    The company will use the proceeds to begin an underground exploration programme at its 100%-owned O'Brien Gold Project in the Abitibi region of Quebec. The centrepiece is an access ramp to about 300 metres vertical depth. Ore drives through mineralised zones will bring material to surface, but Radisson will not develop stopes or mining panels and does not call the work a bulk sample. Manson said the programme is meant to test continuity of mineralisation, ground conditions, dilution and the tonnes per day the orebody can support. Those variables determine whether a high-grade narrow vein deposit can be mined at a steady rate.

    Timing matters for investors tracking catalysts. Permitting and preliminary engineering have started. Manson expects to break ground on the portal around the middle of 2027, with about 18 months of work to reach depth. The objective is to have the ramp in place for 2029. In parallel, the 140,000-metre surface programme runs on eight rigs, with a ninth planned for a hole to 2.5 km depth. A resource update is likely by the end of 2026, followed by another in 2027.

    The current resource stands at 2.3 million ounces, made up of 0.63 million ounces indicated and 1.69 million ounces inferred, according to the company's release. Manson said similar mineralisation continuing to a 2 km floor points to 3 to 4 million ounces in total, and he sees upwards of 4 million ounces. Manson cites an 83% success rate for deep step-out holes from shows 98 hits from 120 holes.

    Valuation is where Manson sees a gap. He put the shares at US$191 per ounce on 2.3 million ounces after a C$1.17 close, against takeouts at US$500 to US$600 per ounce over the past six months. Precedent transactions are imperfect comparisons, since prices reflect stage, grade and infrastructure access. Manson also said Agnico Eagle's stake is a level Radisson is comfortable with and that the stand-alone path remains the default. Any use of the LaRonde infrastructure is a future step to be considered.

    Risks remain as narrow vein deposits depend on continuity, and underground development has to keep pace with any future mill feed. O'Brien is a 1920s mine site with an old tailings facility, and Manson said legacy issues must be addressed. The exploration target is unproven, and the commentary comes from a company executive with an interest in the outcome. Investors should watch the year-end resource update, exchange acceptance and the 2027 portal start.

    View Radisson Mining's company profile: https://www.cruxinvestor.com/companies/radisson-resources

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    27 min
  • Astra Exploration (TSXV:ASTR) - Largest Drill Plan Tests District Scale at La Manchuria

    Interview with Brian Miller, CEO of Astra Exploration

    Our previous interview: https://www.cruxinvestor.com/posts/astra-exploration-tsxvastr-15m-raise-supports-high-grade-gold-silver-target-in-argentina-10209

    Recording date: 22nd September 2026

    Astra Exploration (TSXV:ASTR) is a precious metals explorer focused on gold and silver in Argentina and Chile. Its flagship is the La Manchuria project in Santa Cruz, Argentina, where the company holds 80% with an option to acquire 90% from Patagonia Gold Corp.

    The final Phase III assays, released on 17 September 2026, covered eight holes from a 16-hole, 5,176-metre programme. Highlights were 3 metres at 4.34 g/t gold and 363.7 g/t silver at the Basalto Zone, and 8 metres at 3.12 g/t gold and 10.3 g/t silver in the Eastern Zone. Both remain open.

    CEO Brian Miller states Phase III showed expansion in two systems. One is a disseminated bulk-tonnage system at surface. The other is a high-grade vein system. He also acknowledged that one target did not work. Holes drilled at 300 to 350 metres beneath apparently converging veins found narrow, low-grade veins in andesite. Miller called the result local. Astra will now concentrate on rhyolites and pyroclastics, which he said have been more predictable.

    Miller also addressed how the market may value the two systems. He said an analyst who knows geology and mining favours the growing bulk system, while the wider market tends to prefer headline vein grades such as 80 g/t gold. He said little has changed at the project, and that some investors who held for a single target sold after the miss. He did not identify a direct peer, saying the two-system setting is somewhat unique.

    The next phase is built around scale. Geological and geophysical data define five undrilled regional targets over a 4 by 4 kilometre footprint. Miller's favourite is Breccia, to the southeast, on strike with the Manchuria Hill vein structures. Astra has also expanded its La Manchuria claims from about 5,600 to about 39,000 hectares.

    Astra plans 10,000 to 20,000 metres of drilling with two drills. Miller described 10,000 metres as the minimum. Drilling at La Manchuria is due to begin in November, with roughly 5,000 metres by year-end and a further 5,000 metres in the first quarter of 2027. The split between Manchuria Hill and the regional targets will follow results. The company reports C$12.5 million in treasury and describes its programmes as fully funded.

    Don Mario sits in Chile's Maricunga belt, about 20 kilometres from the Refugio Mine. First-pass drilling is planned for January and February. A news release on the targeting work is expected in the next couple of weeks.

    Investors should weigh several risks. Host-rock variability has already produced one miss. Winter reduces drilling productivity and raises cost per metre in Argentina. Assay turnaround has been slow, which can delay news flow. Miller also said the shares traded near their 52-week low in the week of the interview, and sentiment has reacted to individual drill results.

    Near-term watch-items include the Don Mario release, the first assays from the Q4 2026 campaign, and how Astra allocates its early metres. Any conclusion will rest on assay results rather than on the plan alone.

    Learn more: https://www.cruxinvestor.com/companies/astra-exploration

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    21 min
  • ValOre Metals (TSXV:VO) - Brazilian PGE Developer Targets Q4 2026 PEA

    Interview with Nick Smart, CEO, ValOre Metals Corp.

    Our previous interview: https://www.cruxinvestor.com/posts/valore-metals-tsxvvo-undervalued-investment-series-with-nick-smart-9774

    Recording date: 22nd September 2026

    ValOre Metals Corp. (TSXV: VO, OTCQB: KVLQF, FSE: KEQ0) is a Brazil-focused precious metals developer advancing the Pedra Branca project, a 100%-owned, near-surface platinum-palladium-gold deposit in Ceará State. The project's appeal begins with jurisdiction: roughly 90% of global PGE supply is concentrated in South Africa, Zimbabwe and Russia, each facing distinct operational or geopolitical constraints, while Pedra Branca sits outside that concentration entirely, benefiting from a four-hour paved highway link to Fortaleza's international port and airport.

    The current resource base - a 2022 NI 43-101 inferred estimate of 2,198 koz 2PGE+Au across seven near-surface zones - has already doubled since ValOre acquired the project at roughly 1.1 Moz, following an additional US$10 million and 23,534 metres of company-funded drilling layered onto a legacy dataset from prior owners Anglo American and Anglo Platinum. A further 5,000-6,000 metres drilled since the 2022 estimate, including five new exploration zones, has not yet been incorporated into a public resource figure, leaving a visible near-term catalyst in an updated estimate.

    Metallurgical testwork is the other major workstream ahead of the PEA. The company is scaling up leach testing from shake-flask to column and stirred-tank vessel trials to assess heap-leach amenability on weathered, oxidised material (roughly 40% of tonnage), while advancing conventional flotation on the fresh material that contributes the bulk of contained ounces. Recovery testwork is currently tracking in the high 70% range, with management indicating room for improvement as the flowsheet is optimised - a genuine trade-off exists between lower-capex heap leaching and higher-recovery vessel processing that the PEA will need to resolve.

    Management has signalled a preference for staged development over a single maximum-scale build: securing licensing for an initial phase, proving the process, and adding capacity in subsequent phases as cash flow supports it, rather than raising capital repeatedly to reach full scale before any production decision. That approach, combined with Brazil's expanding domestic PGE processing capacity - illustrated by neighbouring Bravo Mining's proposed smelter complex at the port of Barcarena, which ValOre has flagged as a potential logistically attractive buyer for future concentrate - points toward a capital-efficient path to first production rather than a single binary de-risking event.

    On valuation, ValOre's roughly $20M market capitalisation compares to a peer set - Bravo Mining, Platinum Group Metals, Generation Mining and Stillwater Critical Minerals - carrying market caps from ~$126M to ~$440M at broadly comparable or more advanced project stages. Insider and close-associate ownership stands at 30% combined, with resource and mining funds holding a further 25%. Cash on hand was under $0.8M as of September 1, 2026, against 255M shares outstanding (304.2M fully diluted), underscoring that near-term financing will likely be required to fund the PEA and subsequent development studies. The company's key near-term catalysts are the updated resource estimate, the Q4 2026 PEA, and subsequent licensing steps into Q1 2027.

    Learn more: https://www.cruxinvestor.com/companies/valore-metals

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    22 min
  • Highland Copper (TSXV:HI) - Locks In $50M as Copperwood Advances

    Interview with Barry O'Shea, CEO of Highland Copper

    Our previous interview: https://www.cruxinvestor.com/posts/coppers-new-era-from-cyclical-commodity-to-strategic-lifeline-10769

    Recording date: 22nd September 2026

    Highland Copper Company Inc. (TSXV:HI) has reached a significant financing milestone for its Copperwood copper project in Michigan's Upper Peninsula: final approval for a US$50 million grant from the Michigan Strategic Fund under the state's Strategic Site Readiness Program. No further state approvals are required, and the reimbursable structure returns funds to the company dollar-for-dollar as it spends on eligible regional infrastructure - power upgrades, telecommunications, and road improvements outside the mine gate.

    The grant lands alongside a revised project timeline. CEO Barry O'Shea confirmed that the construction decision previously targeted for the second half of 2026 has shifted into 2027, with production now expected in the second half of 2030 rather than 2029. He attributed this to continued mine-plan optimisation work including cut-off grade and pillar-size adjustments identified in a June 2026 announcement, and the additional time needed to secure the Michigan grant, rather than to any fundamental setback. An updated feasibility study incorporating these changes is due in the first half of 2027.

    Copperwood's economics carry substantial leverage to the copper price. The 2023 feasibility study produced a $168 million after-tax NPV and 18% IRR at a $4 per pound copper price which were insufficient at the time to attract meaningful capital. With long-term consensus pricing now closer to $5 per pound, company materials put the updated NPV at $507 million (33% IRR), rising to $855 million (48% IRR) at $6 per pound, a level copper is already approaching, with futures trading near $6.90/lb. The updated study will also incorporate the Michigan grant, a 1.6-percentage-point copper recovery improvement from newly adopted Jameson cell flotation technology, and potential mine-life extensions from the project's 79 million tonnes of inferred resource, partially offset by three years of cost escalation.

    On financing, the Michigan grant is one piece of a broader non-dilutive stack. A separate US$50 million application is pending with the U.S. Department of Defense, though management expects to receive closer to $20-25 million based on precedent. The largest component remains a $250 million Letter of Interest from the U.S. Export-Import Bank, which remains non-binding; Highland Copper is running a competitive process to convert it into binding debt terms, potentially bringing in additional partners alongside existing 28% shareholder Orion Mine Finance. Together, non-dilutive sources could cover an estimated 70-80% of the roughly $400 million capital requirement, leaving $100-125 million to be raised as equity - which O'Shea expects to draw from a mix of Canadian, U.S. and other institutional investors once binding debt terms and the updated feasibility study are secured.

    The company has also strengthened its leadership bench ahead of a potential build decision, adding Peter Hemstead (ex-Capstone Copper) as interim CFO and Trace Arlaud (ex-Rio Tinto Resolution Copper) as Project Director within the past six months. For investors, the key milestones to track are the H1 2027 feasibility study, the Q3 2027 conclusion of the debt financing process, and progress converting the EXIM letter to binding terms.

    View Highland Copper's company profile: https://www.cruxinvestor.com/companies/highland-copper

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    22 min
  • Integra Resources (TSXV:ITR) - 2026 Guidance Intact, 2027 De-Risking Underway

    Interview with George Salamis, President & CEO, Integra Resources 

    Our previous interview: https://www.cruxinvestor.com/posts/made-in-america-integra-resources-tsxvitr-visiting-the-florida-canyon-mine-11309

    Recording date: 22nd September 2026

    Integra Resources (TSXV: ITR | NYSE: ITRG) is a Great Basin-focused gold-silver company built around one producing asset and two advanced development projects. Florida Canyon, an open-pit heap leach mine in Nevada acquired for $68 million in 2024, is the company's cash engine. Early 2026 was rocky: two consecutive quarters missed internal guidance, driven by ore-haulage bottlenecks and difficulty blending low-grade stockpile material with in-situ ore. Both issues are now described as resolved or substantially improved. A July 2026 technical report and updated mine plan lifted Florida Canyon's reserve by 74% to 1.19 million ounces, extended mine life three years to 2033, and raised average annual production guidance 17% to 82,000 ounces, with $0.8 billion in projected life-of-mine after-tax free cash flow.

    That cash flow is earmarked to fund Integra's two growth projects. DeLamar, in southwestern Idaho, is the flagship: a 2025 feasibility study shows a base-case after-tax NPV5% of $774 million (rising to $1.9 billion at spot gold prices), a 46% base-case IRR (97% at spot), and payback of under two years at base case, compressing to roughly one year at current prices. Permitting has accelerated meaningfully - DeLamar's Notice of Intent was published in May 2026, and the project was added to the federal FAST-41 Transparency Projects Program in January 2026. A Record of Decision is targeted for H2 2027, with construction-start permits targeted for spring 2028. Integra has also signed a relationship agreement with the Shoshone-Paiute Tribes covering the project's development, and raised US$61 million in a February 2026 bought-deal financing to fund early works and land acquisition.

    Nevada North, the third asset, comprises the Wildcat and Mountain View deposits roughly 30 miles from Florida Canyon. A 2023 PEA outlined a 13-year, 80,000 ounce-per-year operation with a $310 million after-tax NPV5% at a conservative $1,700/oz gold price assumption; an updated technical report is underway.

    A distinct, lower-capital growth avenue also exists within Florida Canyon itself: reclassifying historical inter-pit "saddle" ground and decades-old waste dumps as ore now that gold prices make previously sub-economic material viable. Conceptual estimates for two dump targets alone range up to 56 million tonnes combined, though none of this is yet a defined mineral resource.

    Management, led by CEO George Salamis alongside a leadership team with prior roles at SilverCrest Metals, Kinross and Perpetua Resources, has stated an explicit long-term ambition to build toward a 250,000-300,000 ounce gold-equivalent multi-asset production platform and is actively evaluating acquisitions to accelerate that path, while emphasising organic funding capacity from Florida Canyon's cash flow. Combined resource inventory across the three assets stands at 7.7 million ounces gold-equivalent measured and indicated plus 4.3 million ounces inferred. With roughly US$111 million in treasury as of mid-2026 and no near-term dilutive financing need flagged, the key catalysts for investors to track are Q3/Q4 2026 production against guidance, further resource updates from the 2026 drilling programme, and progress toward DeLamar's H2 2027 Record of Decision.

    Learn more: https://www.cruxinvestor.com/companies/integra-resources

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    22 min
  • Maple Gold Mines (TSXV:MGM) - 2027 PEA and Fully Funded 25,000m Joutel Drilling Programme Ahead

    Interview with Kiran Patankar, President & CEO of Maple Gold Mines

    Our previous interview: https://www.cruxinvestor.com/posts/maple-gold-mines-tsxvmgm-52moz-gold-system-with-major-drill-growth-ahead-10207

    Recording date: 22nd September 2026

    Maple Gold Mines Ltd. (TSXV:MGM) is advancing the 100%-owned Douay/Joutel Gold Project, a 481 km² land package on the Casa Berardi Deformation Zone in Québec's Abitibi Greenstone Belt. The project hosts a combined resource of 905,000 ounces Indicated and 4.3 million ounces Inferred, for about 5.2 million ounces in total. Douay contributes large-scale, lower-grade open-pit and underground mineralisation, with 779,000 ounces Indicated at 1.33 g/t and 3.3 million ounces Inferred at 0.84 g/t. Joutel adds a maiden underground resource of 126,000 ounces Indicated at 4.53 g/t and 992,000 ounces Inferred at 4.11 g/t.

    The main development over the past year is a change in the company's focus. According to President and CEO Kiran Patankar, Maple Gold's market value has risen roughly tenfold in twelve months. The company has since completed an internal scoping study that compared processing flowsheets, throughput rates of 5,000 to 40,000 tonnes per day, and whether the deposits justify a standalone mill. Patankar says the study concluded the project could support two mines. The emerging concept is a central mill near Douay, with high-grade Joutel material trucked roughly 25-30 kilometres to lift the overall head grade. Tender processes for PEA engineering firms are under way, and an updated resource and PEA are targeted around mid-2027.

    Joutel is the near-term driver. Agnico Eagle mined 1.1 million ounces there at 6.5 g/t between 1974 and 1993, using a 6 g/t cut-off. Patankar says material below that grade was never drill tested. Maple Gold's winter programme hit the target horizon in 19 of 22 holes, including 8.6 g/t over 4.2 metres between the Eagle and Telbel shafts, and extended high-grade mineralisation 450 metres beyond the old workings. None of this drilling is in the current resource. The fully funded C$9 million, 25,000 metre fall programme targets resource conversion, infill and expansion, with a stated goal of doubling the Joutel resource at similar grades.

    Management says it has built conservatism into its assumptions. The Joutel resource excludes a 100 metre crown pillar and 10 metre buffers around old stopes. The internal study assumed new shafts rather than reuse of existing ones, and a 77% recovery rate compared with the 90%-plus Patankar says Agnico Eagle achieved. A new metallurgical programme should provide current recovery data.

    On valuation, Maple Gold trades near $30 per ounce of resource. Patankar argues that most comparable Canadian projects already have PEAs and trade on NPV multiples, so publishing an economic study is the main route to a re-rating. The company held about C$20 million in cash at the time of the interview and says it is funded through 2027. Agnico Eagle is the largest shareholder at approximately 12.5%.

    The key risks are the high proportion of Inferred ounces, the unpublished status of the internal study, reliance on historical metallurgical data and Agnico Eagle's back-in right to a 50% interest. Near-term catalysts include Joutel fall drill results, pending Douay assays, an expansion to four to six rigs this winter, and the mid-2027 resource update and PEA.

    View Maple Gold Mines' company profile: https://www.cruxinvestor.com/companies/maple-gold-mines-ltd

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    32 min
  • Summit Royalties (TSXV:SUM) - Doubling Revenue as More Assets Enter Production

    Interview with Drew Clark, President & CEO of Summit Royalties

    Our previous interview: https://www.cruxinvestor.com/posts/summit-royalties-tsxvsum-secures-us50m-credit-facility-to-fund-cash-flowing-deals-push-11308

    Recording date: 22nd September 2026

    Summit Royalties (TSXV:SUM, OTCQX:SUMMF) is a precious metals royalty and streaming company that began trading on the TSX Venture Exchange in November 2025. In under a year it has assembled a portfolio of around 46 royalties and streams, completed the Star Royalties acquisition, bought a royalty on Newmont's Saddle North deposit and arranged its first credit facility. President and CEO Drew Clark says Summit has not raised any money since going public.

    The investment case rests on a visible production step-up. Four assets currently generate revenue: a 1% NSR on West Red Lake Gold Mines' Madsen mine in Ontario, a 50% silver stream on Orezone Gold's Bomboré mine in Burkina Faso, a 2% royalty on Iwatani's Keysbrook mineral sands operation in Western Australia, and a 0.5% NSR on Denarius Metals' Zancudo mine in Colombia. Bomboré dominates for now, at an estimated 68% of 2026 revenue.

    Two development assets are scheduled to enter production in 2027. Copperstone in Arizona, operated by Mining Americas, is permitted, funded and under construction, with first gold targeted for mid-2027. Summit holds a 4% gold stream there, paying 25% of spot per ounce delivered, and a maiden open pit resource is expected in H2 2026. Pitangui in Brazil, operated by Jaguar Mining, pays Summit $80 per ounce on the first 250,000 ounces before converting to a 1.5% NSR. Development is expected to start in H2 2026, subject to an installation licence.

    Consensus estimates cited by Clark have revenue doubling in 2027 and again in 2028, with output above 4,000 gold equivalent ounces by 2028. Summit has not issued formal guidance but intends to. Because general and administrative costs run at $1.5 million to $2 million a year and are expected to stay broadly flat, most of that incremental revenue should reach the bottom line.

    The funding model is shifting. Summit's $25 million revolving facility from National Bank of Canada, with a $25 million accordion, is undrawn and costs between 6% and 7% when drawn, depending on leverage. Clark's argument is simple. When an acquired asset's revenue exceeds its interest cost, cash flow per share rises immediately and no shares are issued. That matters for a company trading at roughly 0.7 times P/NAV, where equity is an expensive currency.

    Valuation is the core of the opportunity. At a market capitalisation of US$109 million, Summit trades at the lowest P/NAV and price-to-2027 cash flow multiples in its presented peer group. Clark believes the market begins treating royalty companies as established players once revenue passes a threshold he now places near $20 million.

    Longer-dated optionality comes from AurMac, Banyan Gold's 8.6 million ounce Yukon project where Summit holds 0.5% to 2.0% royalties ahead of a PEA, and from Saddle North, which Clark expects to repay its C$5 million cost within a year of production.

    The risks are clear. Revenue is concentrated in Bomboré until 2027, both development assets are pre-production and could face delays, and the portfolio lacks a single cornerstone stream. Investors should track Copperstone construction, the Pitangui installation licence, the first facility drawdown and Summit's maiden guidance.

    View Summit Royalties' company profile: https://www.cruxinvestor.com/companies/summit-royalties 

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    26 min
  • Mogotes Metals (TSXV:MOG) - Three Porphyry Bets Target Year-Round Copper-Gold Catalysts

    Interview with Allen Sabet, CEO, Mogotes Metals 

    Our previous interview: https://www.cruxinvestor.com/posts/mogotes-metals-tsxvmog-district-scale-explorer-triples-drilling-to-20000m-through-2027-11919

    Recording date: 21st September 2026

    Mogotes Metals Inc. (TSXV:MOG, FSE:OY4, OTCQB:MOGMF) has spent 2026 assembling a three-project copper-gold portfolio spanning three continents, and CEO Allen Sabet's pitch to investors rests on a single screening discipline applied consistently across all of them: only advance ground that already carries drilled intercepts of at least 100 metres at 1% copper-equivalent, in a jurisdiction the company can realistically permit and finance.

    The flagship remains Filo Sur, in Argentina and Chile's Vicuña district, immediately south of Lundin Mining's Filo del Sol discovery. A 2025–2026 season of 6,208 metres delivered two discoveries on the Macho Muerto Fault Zone — the high-grade Albor breccia and the Cruz del Sur gold-copper porphyry — alongside expanded targets at Cuenca and Luz del Sol. Rio Tinto closed a US$15 million strategic placement in August, taking roughly 5% of the company and 15 months of project-level exclusivity on Filo Sur, ahead of a 2026–2027 season planned at up to 20,000 metres.

    Beyond Filo Sur, two option-stage assets add geographic and seasonal diversification. In Montana, Mogotes holds an earn-in over Rio Tinto's Copper Cliffs porphyry: US$16 million of exploration spend buys 51% of the project, with Rio Tinto entitled to pay US$32 million within 90 days of that stage completing to buy back a 2% controlling interest. Drilling of 8,000–9,000 metres is planned pending permits, potentially starting before winter. In Kazakhstan, a three-year option over the Beskauga deposit gives Mogotes access to a historical, unverified resource of several million gold-equivalent ounces at drilling costs the company describes as among the lowest available anywhere — supported by its own on-site sample-preparation lab. Up to 50,000 metres of drilling is planned this year, targeting a preliminary economic assessment within six months.

    Sabet frames the three-project structure as intentional rather than opportunistic: Filo Sur drills in the Southern Hemisphere summer, Copper Cliffs and Beskauga in the Northern Hemisphere season, spreading news flow and reducing the single-season, single-catalyst risk that typically affects one-asset explorers. The company reports a treasury of approximately C$75 million, which it says funds the coming year's combined ~80,000-metre programme.

    The risks scale with the structure's ambition. Two of the three projects remain contractually contingent — Mogotes must keep meeting staged spending commitments to retain or grow its interest, and Rio Tinto's Copper Cliffs buy-back right could cap Mogotes' ultimate ownership at a minority stake. The Beskauga resource has not been verified under current NI 43-101 standards. And running three permitting and drilling programmes concurrently across Argentina/Chile, the United States and Kazakhstan introduces jurisdictional and currency exposure that a single-asset peer would not carry.

    For investors, the near-term catalyst set is unusually dense for a company of this size: Kazakhstan assays within months, a possible Montana drill start in October, and Filo Sur's own season running inside Rio Tinto's 15-month exclusivity clock. Whether that translates into a re-rating depends on whether Mogotes can execute all three simultaneously without diluting shareholders or ceding control of the projects it has spent the past year assembling.

    Learn more: https://www.cruxinvestor.com/companies/mogotes-metals

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    33 min
  • Fed Rates Rise, Old Rejections Get a Second Look: Olive's Post-Hike Playbook

    Recording date: 16th September 2026

    Olive Resource Capital's Samuel Pelaez and Derek Macpherson used this Compass episode, recorded the day after the Federal Reserve's September rate decision, to address two distinct but connected investor questions: what the Fed's move means for the resource complex, and what the fund is watching for as it heads into the year's two most important precious metals conferences.

    The headline takeaway is that neither guest sees the unanimous 25 basis point hike to 3.75-4.00% as a meaningful threat to their long-term commodity thesis. The muted reaction in gold and the US Dollar Index, alongside a US two-year Treasury yield already signalling further hikes, supports their view that the move was fully priced in rather than a genuine surprise to markets, even if it surprised the guests personally. More importantly for positioning, Pelaez's framing of gold's correlation with real rather than nominal interest rates offers a specific, testable lens for investors trying to judge how much further tightening the metal can absorb before its monetary debasement thesis is genuinely challenged. Investors should note the tail risk both guests raised without dwelling on: a hiking cycle aggressive enough to tip the US into recession remains a historical possibility that could force a more disruptive repricing than a single 25 basis point move.

    On timing, the pair's read that the Fed is unlikely to hike again at its 27-28 October meeting, a week ahead of the US midterm elections, is a near-term calendar marker worth tracking against actual Fed communication over the coming weeks, rather than treating it as settled.

    The conference-season discussion carries the more actionable content for stock-pickers. The core shift the pair identify from a market where companies needed to prove they could raise capital to one where most already have it and now need to prove they can deploy it, this reframes what investors should listen for in company presentations this autumn: tangible project milestones and catalysts, not just balance sheet strength. Olive's specific focus on finding a copper name to replace Arizona Sonoran Copper following its acquisition signals where the fund sees the next wave of M&A activity concentrating, and its continued but qualified conviction in Gladiator Metals offers a concrete example of a name investors may want to benchmark against whatever emerges from Beaver Creek and Colorado Springs.

    The Bravo Mining anecdote is worth flagging as a broader behavioural point rather than a stock-specific one: both guests explicitly warn against anchoring too heavily on a name's history, whether that's a story once dismissed as overvalued or one an investor has simply stopped tracking. For a fund with Olive's track record of identifying re-rating candidates before broader market recognition, that openness to revisiting prior "no"s is itself a signal of where they expect this cycle's opportunities to concentrate: not necessarily in new discoveries, but in familiar names whose valuations or fundamentals have shifted enough to warrant a second look.

    Learn more: https://cruxinvestor.com

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    27 min
  • TRX Gold (TSX:TRX) - Record Gold Run Powers Self-Funding Mill Expansion and Resource Update

    Interview with Stephen Mullowney, Director & CEO of TRX Gold Corp.

    Our previous interview: https://www.cruxinvestor.com/posts/trx-gold-tsxtnx-doubling-gold-production-through-expansion-and-re-investment-allocations-4208

    Recording date: 16th September 2026

    TRX Gold Corporation (TSX:TRX) (NYSE American:TRX) has spent five years turning the Buckreef Gold Project in Tanzania from a stalled exploration asset into a self-funding gold producer, and its preliminary fiscal 2026 results are the clearest evidence yet that the model is working. Full-year gold production reached a record 29,650 ounces, a 57% increase on 2025 and the top end of the company's own guidance range, while Q4 alone delivered 8,173 ounces, up 28% year-on-year. Realised gold prices which rose 46% for the full year to approximately $4,386 per ounce compounded the production gains into a run-rate EBITDA CEO Stephen Mullowney puts at approximately $80 million today, with a stated target of $200-250 million within two to three years.

    What differentiates TRX Gold from many junior producers pursuing similar growth is how that growth is being financed. The company is mid-build on a new 3,500 tonnes-per-day (tpd) SAG/ball mill circuit, running alongside its existing, recently upgraded 2,000 tpd plant, for a theoretical combined capacity of 5,500 tpd which is comfortably above the 3,000 tpd envisioned in the company's May 2025 PEA. The roughly $50 million cost is being funded entirely from operating cash flow, with the company carrying zero debt and $30 million of cash on the balance sheet, plus undrawn credit facilities. Management's stated fallback, should more capital be required, is debt rather than equity which is a meaningful distinction in a sector where dilution is often the default financing tool.

    The operating jurisdiction adds a further layer to the case. Buckreef sits in Tanzania's Geita Region alongside established operations run by Barrick, AngloGold Ashanti, Perseus and Shanta, giving TRX Gold access to local contractors, supply chains and banking relationships that reduce build risk relative to more frontier settings. The project itself is held through a 55/45 joint venture with Tanzania's state mining company, Stamico, with TRX Gold holding board control and capital recovery preference on its approximately $30 million project loan; management is in discussions to move toward a more standard national resource framework, which would address the currently dilutable nature of the government's 45% interest.

    Near-term catalysts include continued ramp-up of the mill upgrades already boosting throughput and recovery, tangible construction progress on the new SAG/ball mill circuit, and an updated PEA expected by early 2027 that should formalise a revised, open-pit-first mine sequence. Exploration capacity is also scaling quickly, from two drill rigs currently to five within four to six months, targeting both resource growth at the existing 1.5-million-ounce-plus resource base and new discoveries across ten geophysical targets and the Stamford Bridge and Anfield zones. Recent addition to the MVIS Global Junior Gold Miners Index adds a structural liquidity catalyst on top of the operational story. The principal risks are the model's sensitivity to a sustained gold-price pullback and the still-unresolved Stamico framework renegotiation which are both worth monitoring though neither appears to threaten the current growth trajectory.

    Learn more: https://www.cruxinvestor.com/companies/trx-gold

    Sign up for Crux Investor: https://cruxinvestor.com/subscribe

    26 min