  • Ep.714 - Lean Onboarding Series - The Last Planner System

    Jason gives a thorough overview of the Last Planner System as part of his onboarding series, walking through the full chain of schedule deliverables from the master schedule down to daily huddles. He explains how pull planning brings foremen and lead persons into refining the sequence, how the six-week make-ready look-ahead plan focuses on making activities truly ready (labor, materials, tools, equipment, information), and how the weekly work plan and daily huddles turn commitments into an executable plan tracked through percent plan complete. He closes by framing Last Planner not just as a set of tools, but as a culture shift, away from command-and-control leadership and toward genuinely listening to the people doing the work.

    What you'll learn in this episode:

    • The full chain of Last Planner deliverables: master schedule, pull plans/phase plans, the six-week make-ready look-ahead plan, weekly work plans, and daily huddles
    • Why the six-week look-ahead plan exists to make activities truly "ready" (labor, materials, tools, equipment, information) and surface roadblocks early
    • How percent plan complete (PPC) is tracked and scored differently depending on whether the master schedule is CPM (80-85% target) or Takt (100% target)
    • Why "last planners" refers to foremen and lead persons, the people closest to the actual work, not just superintendents
    • Why the Last Planner System is as much a cultural shift toward listening and collaboration as it is a set of scheduling tools

    Is your project actually using the full chain of Last Planner deliverables, or just borrowing the name without the real collaboration behind it?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    8 min
  • Ep.713 - Lean Onboarding Series - Holding Start Dates

    Jason explains why crews finishing early within their Takt zone should almost never rush into the next area, but instead use that leftover time as a buffer for preparation, quality checks, and continuous improvement. Drawing on military research showing troops can march up to twice as far with short, regular breaks, and a relatable analogy about a professor moving up a deadline just because a student finished early, he makes the case that holding start dates protects quality, safety, and morale far better than pushing ahead just because the work is technically done.

    What you'll learn in this episode:

    • Why finishing early in a Takt zone should trigger preparation and regrouping, not an immediate rush into the next area
    • The military research showing troops march up to 100% farther when given regular short breaks
    • What that buffer time should actually be used for: 5S-ing tools, pre-staging materials, refreshing layout, training, and reflecting as a team
    • Why pushing crews to move faster just because they finished early undermines quality, safety, and long-term production
    • The one exception: moving ahead is fine only when it's a mutual, unforced decision between trade partners, not the default expectation

    Are your crews using extra time within their zone to genuinely prepare for what's next, or are they being pushed to rush into the next area the moment they finish?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    6 min
  • Ep.712 - Lean Onboarding Series - Zones, Takt Time, & Work Packages

    Continuing the onboarding series, Jason explains why every construction project should be broken into zones, each with its own planned, built, and finished scope of work before moving on, rather than assigning trades vague durations for an entire floor or building. He walks through the core discipline of "plan it, build it right, finish it" within each zone, and shares what he considers one of the most important habits in the entire series: superintendents checking in daily with foremen in each zone, punching out yesterday's fixes on the spot and walking tomorrow's area to clear roadblocks before they stop work.

    What you'll learn from this episode:

    • Why every project should be divided into zones (or sequences) with a specific duration for each, rather than one big duration for a whole floor or building
    • The discipline of "plan it, build it right, finish it" within each zone before moving crews to the next area
    • Why stopping and fixing quality issues immediately, rather than adding them to a list for later, saves far more time than it costs
    • The daily superintendent-foreman habit that Jason considers one of the most important in the entire series: reviewing yesterday's work and walking tomorrow's zone together
    • How isolating scope within zones sets up the conditions for true one-process flow

    Does your project break work into clear, planned zones with a defined duration, or are trades left with a vague "get it done somewhere in this floor" assignment?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    5 min
  • Ep.711 - Lean Onboarding Series - Takt, Last Planner, Scrum, & CPM

    Continuing his onboarding series on flow and pull, Jason breaks down the four major scheduling systems used in construction and how each relates to creating true flow on a project: Takt planning (a visual, color-coded master schedule that keeps trades moving at the same speed and distance), the Last Planner System (a collaborative process where foremen, the true "last planners," help confirm sequence and build weekly work plans), Scrum (a to-do/doing/done board that keeps office staff focused on unblocking the field), and CPM (a computer-networked scheduling method useful only at a high summary level, never for detailed field planning). He closes with practical tips, working one process at a time, consistent crews, installing work right the first time, and finishing as you go, for anyone trying to actually maintain flow on site.

    What you'll learn in this episode:

    • What Takt planning is and how it visually keeps trades moving at the same speed and distance across a project
    • Why the Last Planner System exists to bring foremen's real-world wisdom into the schedule instead of a top-down, forced plan
    • How Scrum boards help office teams prioritize the tasks that create flow for the field
    • Why CPM schedules work only as high-level summaries and become dangerous when used for detailed trade sequencing
    • Practical habits that maintain flow: one process at a time, consistent crews, quality installation the first time, and finishing as you go

    Do you know how to read your project's schedule, whether it's Takt, Last Planner, Scrum, or CPM, well enough to spot a roadblock before it stops your work?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    9 min
  • Ep.710 - Lean Onboarding Series - Flow and Pull

    Jason introduces a foundational Lean distinction: the difference between flow and pull. Pull means each trade or process moves at the pace set by whoever's ahead of them, speeding up or slowing down to match, and materials get delivered just in time to the point of work rather than staged in advance. Flow, by contrast, regulates both the speed and the distance between trades, so everyone moves at a consistent, steady pace through the building rather than adjusting to whoever's setting the pace. Using Eli Goldratt's hiking-line story from The Goal and a real anecdote about a failing Tucson project turned around by putting trades back into rhythm, Jason makes the case that flow is the ideal, pull is the acceptable fallback, and pushing everyone around chaotically is never acceptable.

    What you'll learn in this episode:

    • The core difference between pull (matching the pace of whoever's ahead of you) and flow (a regulated, consistent speed and distance for everyone)
    • Why pull means producing based on customer demand and delivering materials just in time to the point of work
    • The hiking-line story from The Goal, and why putting the "slow kids" in front creates rhythm instead of chaotic starts and stops
    • A real story about a failing Tucson project turned around by sending everyone home, building a real plan, and bringing trades back into a consistent rhythm
    • Why flow is the ideal goal, pull is an acceptable fallback, but pushing crews around with no regard for pace or distance is never acceptable

    Is your own project actually flowing at a consistent pace and distance, or is it just barely surviving on scattered, chaotic pushing?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    10 min
  • Ep.709 - Lean Onboarding Series - Respect for Resources

    Jason unpacks the concept of respect for resources on a construction project, using Paul Akers' memorable airplane bathroom story as the anchor: even though it wasn't his job, Akers cleaned up a filthy restroom simply because he respected it as a resource that enabled his work. Jason extends that same principle across every layer of a project, from how project engineers inspect and order materials, to how superintendents avoid wasteful stick-building and over-ordering, to how workers treat bathrooms, hoists, and corridors, arguing that genuine respect for the tools, materials, and shared spaces on site naturally eliminates waste.

    What you'll learn in this episode:

    • Paul Akers' story about cleaning an airplane bathroom he wasn't responsible for, and what it teaches about respecting resources
    • Why respecting resources spans everything from material procurement and prefabrication to how workers treat shared spaces like bathrooms and hoists
    • How overordering, stick-building, and poor supply chain management reflect a lack of respect for resources, not just poor planning
    • Why genuinely appreciating the tools and spaces that enable your work naturally reduces waste, without needing enforcement
    • How this mindset should be taught and modeled across every role on a project, from project engineers to foremen to workers

    Do you genuinely appreciate the resources, tools, and shared spaces that make your work possible, or do you treat them as things to be used up and discarded?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    4 min
  • Ep.708 - Lean Onboarding Series - Mentoring & Training by Foremen

    Jason breaks down the real job of a foreman: not working alongside the crew with tools in hand, but staying out ahead, preparing materials, removing roadblocks, and actively mentoring and training every person on the crew. Using his familiar story of two rebar foremen, one always behind because he worked in the trenches instead of preparing, the other always on time because he kept his crew supplied and coached, Jason argues that the true measure of a great foreman is whether workers feel like they're being trained and enabled every single day, not managed through fear, absence, or reactive firefighting.

    What you'll learn in this episode:

    • Why a foreman's real job is mentoring and training, not working alongside the crew with tools in hand
    • Why foremen should be looking five or six units ahead of the crew, not behind, catching roadblocks before they stop work
    • The difference between a firefighting foreman (reactive, always behind) and a fire-preventing foreman (proactive, always ready)
    • Why "that's in my way, we have to stop" is a sign of a foreman not doing their job, not a sign of bad luck
    • How pre-staged materials, clear daily task lists, and active coaching create a crew that feels trained and enabled every day

    Is your foreman out ahead preventing roadblocks and mentoring the crew, or reactively firefighting problems that could have been prevented?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    7 min
  • Ep.707 - Lean Onboarding Series - Respect for Safety

    Jason lays out his complete philosophy and practical system for running a truly safe construction project: zero tolerance, rooted entirely in respect, never in punishment. Starting from the principle that a project's culture is defined by the worst behavior its leaders are willing to tolerate, he argues that safety violations persist only because leadership allows them to. He then walks through his exact system for enforcing zero tolerance items (from safety glasses to fall protection), how to respectfully send someone home to "get their head straight" rather than punish them, and why this approach, when held firmly, results in a genuinely self-sustaining safety culture with minimal repeat offenses.

    What you'll learn in this episode:

    • Why a project's safety culture is entirely shaped by what leadership chooses to tolerate, not by the workers themselves
    • Why safety enforcement should always be framed around respect, never punishment or anger
    • A full zero-tolerance system: what items to enforce, how to handle violations respectfully, and why safety glasses are a powerful psychological "first domino"
    • The exact process for sending someone home safely: explaining it to their foreman, notifying their employer, and logging repeat offenders without shaming them
    • Real results from Jason's own projects: running a multi-hundred-million-dollar job for 30 months while only sending 20 people home, and just 4 permanently

    If something unsafe is happening on your project right now, are you willing to admit that leadership has, in effect, approved it by tolerating it?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    9 min
  • Ep.706 - Lean Onboarding Series - Respect for Cleanliness & Organization

    Jason breaks down why cleanliness and organization are two of the strongest indicators of a construction project's overall health, arguing that a messy job site is never just a cosmetic issue, it's a direct signal of disorganized leadership, poor morale, and looming schedule or safety problems. He makes a firm case against composite cleanup crews, arguing they simply mask waste and bad habits instead of solving them, and lays out a practical, respect-based system for enforcing perfect cleanliness: crews clean their own messes, leadership visibly picks up trash themselves, and the standard gets held strictly, especially in the first six weeks, until it becomes a genuine project habit.

    What you'll learn in this episode:

    • Why cleanliness and organization are among the clearest early indicators of a project's overall health and stability
    • Why composite cleanup crews (paying laborers to clean up after other trades) only mask disorganization instead of fixing it
    • A practical system for enforcing a perfectly clean site: crews clean their own messes, leadership visibly picks up trash, and standards are held firmly for the first six weeks
    • Why holding the line on cleanliness is an act of respect for workers' safety and productivity, not a form of punishment
    • How a clean site makes it easier to spot real safety and quality problems, since you're no longer tripping over clutter to find them

    Is your project's cleanliness level accidentally signaling deeper problems with leadership, morale, or safety that you haven't connected yet?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    9 min
  • Ep.705 - Lean Onboarding Series - Worker Huddles

    Jason walks through how to run a morning worker huddle, the meeting he considers one of the most important things he ever did as a superintendent, and explains why winning over the entire workforce starts with gathering everyone, giving genuine shout outs, and asking for real feedback.

    What you'll learn in this episode:

    • Why the worker huddle sits at the center of the entire huddle system
    • How to structure a huddle: shout outs, feedback, safety, plan, weather
    • Why asking workers for feedback creates real buy-in and trust
    • How to handle multiple languages and staggered trade start times
    • Why one unified project culture beats a collection of separate crews

    Does your project run a real morning worker huddle, or skip straight to work?

    If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    10 min