ENR Critical Path Podcast

ENR Critical Path Podcast

By www.enr.comBusiness
Download on the App Store

ENR Critical Path Podcast episodes

  • Dianne Lee
    Three Asian American women in construction swap tales of their experiences – good, bad, and mostly good! ENR editors Aileen Cho and Eydie Cubarrubia interview Dianne Lee, Kitchell’s executive director of business development and strategy and an A/E/C transformational leader who tirelessly advocates for diversity and inclusion in the industry – while brokering billion-dollar deals, feeding the homeless, putting in a good word for yoga and plugging her new book, “Leveraging Stereotypes.”
    33 min
  • J.J. Eden
    J.J. Eden, executive director of the N.C. Turnpike Authority, talks to us about the past, present and future of highway tolling and mobility. Your toll pass might be more than you ever imagined.
    36 min
  • Blake Andrews
    Wiss Janney Elstner Associate Director Blake Andrews talks to us about starting and managing a new London office during the pandemic, the changing face of structural fire protection in the UK post-Grenfell and how engineering problem solving, itself, is changing. We also discuss new materials and investigation techniques and how they are changing the way forensic engineers approach their work in the U.S. and U.K.
    18 min
  • Jeannie Cullen-Schultz
    After planning most of her life to be a college basketball coach, Jeannie Cullen-Schultz decided that while she loved the game, she did not want to make it her career. After discussions with her father, Mark, and several women in construction, she finished her educational leadership thesis while working on her second master’s degree in construction management and returned to her family’s business, JP Cullen in Janesville, Wis., as a fifth-generation owner and created the general contractor’s health care division. She was committed to making a difference for other women in construction. She and her brother, George, have since become co-presidents of JP Cullen and lead the company with advice and input from their father, other-fourth generation owners and their fifth generation cousins.
    26 min
  • Si Katara
    Cofounder and president of HeadLight Si Katara has led his photo-based inspection technology to wide adoption by contractors and owners such as the Louisiana Dept. of Transportation and Development. The DOTD was already conducting a pilot project with HeadLight in 2020 when five hurricanes and power outages across the state after Hurricane Laura pressed it into service and employees were able to use HeadLight to view real-time updates from colleagues about the outages. Katara also discusses the changing face of cloud-based construction technology with Aileen Cho and Jeff Yoders
    25 min
  • Reopening the Brent Spence Bridge
    In fall 2020, a random truck collision caused a raging fire on the Brent Spence Bridge, closing the critical crossing. Hear how the Kentucky Transportation Cabinet, aided by Michael Baker International, managed to reopen the bridge in 42 days.
    42 min
  • Eric Foster
    ENR California Editor Erica Berardi joins Senior Editor Aileen Cho to chat with Eric Foster about a venerable California company’s expansion to the East Coast.
    18 min
  • John Hillman
    ENR editors Aileen Cho and Jeff Yoders talk to the ENR equivalent of a Grammy Award-winning rock star. AOE winner John Hillman stars in “Where are they Now?” (and yes, he plays drums).
    30 min
  • Avery Bang
    A multiple-degree-holding 30-something, the outgoing CEO of Bridges to Prosperity reminisces about globetrotting adventures and chats about new entrepreneurial challenges
    34 min
  • Bob Clark
    Bob Clark has grown Clayco from a small St. Louis design-builder more than 30 years ago into an annual high performer on the ENR Top 400. In this ENR Exec Talk, he talks with Jeff Yoders and Aileen Cho about his Ride the Wave tour where he’s visiting all of Clayco’s job sites, how he founded the company on the premise of changing adversarial and antiquated processes, a bad call from OSHA on encouraging employees to get vaccinated and how far the industry still has to go to deliver the employee diversity results it needs.
    29 min

About ENR Critical Path Podcast

From the publisher's feed

ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.

More shows like ENR Critical Path Podcast

The Joe Rogan Experience by Joe Rogan

The Joe Rogan Experience

227,535 Listeners

Fantasy Footballers - Fantasy Football Podcast by Fantasy Football

Fantasy Footballers - Fantasy Football Podcast

29,949 Listeners

Energy Gang by Wood Mackenzie

Energy Gang

1,246 Listeners

Up First from NPR by NPR

Up First from NPR

56,426 Listeners

ASCE Plot Points Podcast by American Society of Civil Engineers

ASCE Plot Points Podcast

34 Listeners

The Journal. by The Wall Street Journal & Spotify Studios

The Journal.

6,056 Listeners

The Shawn Ryan Show by Shawn Ryan

The Shawn Ryan Show

46,086 Listeners

The Mel Robbins Podcast by Mel Robbins

The Mel Robbins Podcast

19,155 Listeners

Bloomberg Daybreak: US Edition by Bloomberg

Bloomberg Daybreak: US Edition

87 Listeners

The Future of Everything by Stanford Engineering

The Future of Everything

146 Listeners

Procore Podcasts by Procore Technologies

Procore Podcasts

34 Listeners